§35.2100. Limitations on award.

40 C.F.R. § 35.2100

(a)
Facilities plan approval. Before awarding grant assistance for any project the Regional Administrator shall approve the facilities plan and final design drawings and specifications and determine that the applicant and the applicant's project have met all the applicable requirements of §§ 35.2040 and 35.2100 through § 35.2127 except as provided in § 35.2202 for Step 2 + 3 projects and § 35.2203 for Step 7 projects.
(b)
Agreement on eligible costs.
(1)
Concurrent with the approval of a Step 3, Step 2 + 3 or Step 7 grant, the Regional Administrator and the grant applicant will enter into a written agreement which will specify the items in the proposed project that are eligible for Federal payments and which shall be incorporated as a special grant condition in the grant award.
(2)
Notwithstanding such agreement, the Regional Administrator may—
(i)
Modify eligibility determinations that are found to violate applicable Federal statutes and regulations;
(ii)
Conduct an audit of the project;
(iii)
Withhold or recover Federal funds for costs that are found to be unreasonable, unsupported by adequate documentation or otherwise unallowable under applicable Federal cost principles;
(iv)
Withhold or recover Federal funds for costs that are incurred on a project that fails to meet the design specifications or effluent limitations contained in the grant agreement and NPDES permit issued under section 402 of the Act.
Notes, amendments, and revision history

Amendments

[55 FR 27096, June 29, 1990]

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

Amendments

[55 FR 27096, June 29, 1990]

§35.2101. Advanced treatment.

40 C.F.R. § 35.2101

Projects proposing advanced treatment shall be awarded grant assistance only after the project has been reviewed under EPA's advanced treatment review policy. This review must be completed before submission of any application. EPA recommends that potential grant applicants obtain this review before initiation of design.
Notes, amendments, and revision history

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

§35.2102. Water quality management planning.

40 C.F.R. § 35.2102

Before grant assistance can be awarded for any treatment works project, the Regional Administrator shall first determine that the project is:
(a)
Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management plan that is being developed for the area and reasonable progress is being made toward the implementation of that plan; and
(b)
In conformity with any plan or report implemented or being developed by the State under sections 303(e) and 305(b) of the Act.
Notes, amendments, and revision history

Amendments

[55 FR 27097, June 29, 1990]

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

Amendments

[55 FR 27097, June 29, 1990]

§35.2103. Priority determination.

40 C.F.R. § 35.2103

The project shall be entitled to priority in accordance with § 35.2015, and the award of grant assistance for the project shall not jeopardize the funding of any project of higher priority under the approved priority system.
Notes, amendments, and revision history

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

§35.2104. Funding and other considerations.

40 C.F.R. § 35.2104

(a)
The applicant shall;
(1)
Agree to pay the non-Federal project costs;
(2)
Demonstrate the legal, institutional, managerial, and financial capability to ensure adequate building and operation and maintenance of the treatment works throughout the applicant's jurisdiction including the ability to comply with part 30 of this subchapter. This demonstration must include: An explanation of the roles and responsibilities of the local governments involved; how construction and operation and maintenance of the facilities will be financed; a current estimate of the cost of the facilities; and a calculation of the annual costs per household. It must also include a written certification signed by the applicant that the applicant has analyzed the costs and financial impacts of the proposed facilities, and that it has the capability to finance and manage their building and operation and maintenance in accordance with this regulation;
(3)
Certify that it has not violated any Federal, State or local law pertaining to fraud, bribery, graft, kickbacks, collusion, conflict of interest or other unlawful or corrupt practice relating to or in connection with facilities planning or design work on a wastewater treatment works project.
(4)
Indicate the level of participation for minority and women's business enterprises during facilities planning and design of the project.
(b)
Federal assistance made available by the Farmers Home Administration may be used to provide the non-Federal share of the project's cost.
Notes, amendments, and revision history

Amendments

[49 FR 6234, Feb. 17, 1984, as amended at 55 FR 27097, June 29, 1990]

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

Amendments

[49 FR 6234, Feb. 17, 1984, as amended at 55 FR 27097, June 29, 1990]

§35.2105. Debarment and suspension.

40 C.F.R. § 35.2105

The applicant shall indicate whether it used the services of any individual, organization, or unit of government for facilities planning or design work whose name appears on the master list of debarments, suspensions, and voluntary exclusions. See 2 CFR 200.214 and 2 CFR part 1532. If the applicant indicates it has used the services of a debarred individual or firm, EPA will closely examine the facilities plan, design drawings and specifications to determine whether to award a grant. EPA will also determine whether the applicant should be found non-responsible under 2 CFR parts 200 and 1500 or be the subject of possible debarment or suspension under 2 CFR part 1532.
Notes, amendments, and revision history

Amendments

[87 FR 30399, May 19, 2022]

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

Amendments

[87 FR 30399, May 19, 2022]

§35.2106. Plan of operation.

40 C.F.R. § 35.2106

The applicant shall submit a draft plan of operation that addresses development of: An operation and maintenance manual; an emergency operating program; personnel training; an adequate budget consistent with the user charge system approved under § 35.2140; operational reports; laboratory testing needs; and an operation and maintenance program for the complete waste treatment system.
Notes, amendments, and revision history

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

§35.2107. Intermunicipal service agreements.

40 C.F.R. § 35.2107

If the project will serve two or more municipalities, the applicant shall submit the executed intermunicipal agreements, contracts or other legally binding instruments necessary for the financing, building and operation of the proposed treatment works. At a minimum they must include the basis upon which costs are allocated, the formula by which costs are allocated, and the manner in which the cost allocation system will be administered. The Regional Administrator may waive this requirement provided the applicant can demonstrate:
(a)
That such an agreement is already in place; or
(b)
Evidence of historic service relationships for water supply, wastewater or other services between the affected communities regardless of the existence of formal agreements, and
(c)
That the financial strength of the supplier agency is adequate to continue the project, even if one of the proposed customer agencies fails to participate.
Notes, amendments, and revision history

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

§35.2108. Phased or segmented treatment works.

40 C.F.R. § 35.2108

Grant funding may be awarded for a phase or segment of a treatment works, subject to the limitations of § 35.2123, although that phase or segment does not result in compliance with the enforceable requirements of the Act, provided:
(a)
The grant agreement requires the recipient to make the treatment works of which the phase or segment is a part operational and comply with the enforceable requirements of the Act according to a schedule specified in the grant agreement regardless of whether grant funding is available for the remaining phases and segments; and
(b)
Except in the case of a grant solely for the acquisition of eligible real property, one or more of the following conditions exist:
(1)
The Federal share of the cost of building the treatment works would require a disproportionate share of the State's annual allotment relative to other needs or would require a major portion of the State's annual allotment;
(2)
The period to complete the building of the treatment works will cover three years or more;
(3)
The treatment works must be phased or segmented to meet the requirements of a Federal or State court order; or
(4)
The treatment works is being phased or segmented to build only the less-than-secondary facility pending a final decision on the applicant's request for a secondary treatment requirement waiver under section 301(h) of the Act.
Notes, amendments, and revision history

Amendments

[49 FR 6234, Feb. 17, 1984, as amended at 50 FR 45895, Nov. 4, 1985]

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

Amendments

[49 FR 6234, Feb. 17, 1984, as amended at 50 FR 45895, Nov. 4, 1985]

§35.2109. Step 2 + 3.

40 C.F.R. § 35.2109

The Regional Administrator may award a Step 2 + 3 grant which will provide the Federal share of an allowance under appendix B and the estimated allowable cost of the project only if:
(a)
The population of the applicant municipality is 25,000 or less according to the most recent U.S. Census;
(b)
The total Step 3 building cost is estimated to be $8 million or less; and
(c)
The project is not for a treatment works phase or segment.
Notes, amendments, and revision history

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

§35.2110. Access to individual systems.

40 C.F.R. § 35.2110

Applicants for privately owned individual systems shall provide assurance of access to the systems at all reasonable times for such purposes as inspection, monitoring, building, operation, rehabilitation and replacement.
Notes, amendments, and revision history

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

§35.2111. Revised water quality standards.

40 C.F.R. § 35.2111

After December 29, 1984, no grant can be awarded for projects that discharge into stream segments which have not, at least once since December 29, 1981, had their water quality standards reviewed and revised or new standards adopted, as appropriate, under section 303(c) of the Act, unless:
(a)
The State has in good faith submitted such water quality standards and the Regional Administrator has failed to act on them within 120 days of receipt;
(b)
The grant assistance is for the construction of non-discharging land treatment or containment ponds; or
(c)
The grant assistance is a State program grant awarded under section 205(g) or 205(j) of the Act.
Notes, amendments, and revision history

Amendments

[50 FR 45895, Nov. 4, 1985]

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

Amendments

[50 FR 45895, Nov. 4, 1985]

§35.2112. Marine discharge waiver applicants.

40 C.F.R. § 35.2112

If the applicant is also an applicant for a secondary treatment requirement waiver under section 301(h) of the Act, a plan must be submitted which contains a modified scope of work, a schedule for completion of the less-than-secondary facility and an estimate of costs providing for building the proposed less-than-secondary facilities, including provisions for possible future additions of treatment processes or techniques to meet secondary treatment requirements.
Notes, amendments, and revision history

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

§35.2113. Environmental review.

40 C.F.R. § 35.2113

(a)
The environmental review required by part 6 of this chapter must be completed before submission of any application. The potential applicant should work with the State and EPA as early as possible in the facilities planning process to determine if the project qualifies for a categorical exclusion from part 6 requirements, or whether a finding of no significant impact or an environmental impact statement is required.
(b)
In conjunction with the facilities planning process as described in § 35.2030(c), a potential applicant may request, in writing, that EPA make a formal determination under part 6 of this chapter.
Notes, amendments, and revision history

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

§35.2114. Value engineering.

40 C.F.R. § 35.2114

(a)
If the project has not received Step 2 grant assistance the applicant shall conduct value engineering if the total estimated cost of building the treatment works is more than $10 million.
(b)
The value engineering recommendations shall be implemented to the maximum extent feasible.
Notes, amendments, and revision history

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

§35.2116. Collection system.

40 C.F.R. § 35.2116

Except as provided in § 35.2032(c), if the project involves collection system work, such work:
(a)
Shall be for the replacement or major rehabilitation of an existing collection system which was not build with Federal funds awarded on or after October 18, 1972, and shall be necessary to the integrity and performance of the complete waste treatment system; or
(b)
Shall be for a new cost-effective collection system in a community in existence on October 18, 1972, which has sufficient existing or planned capacity to adequately treat such collected wastewater and where the bulk (generally two-thirds) of the expected flow (flow from existing plus future residential users) will be from the resident population on October 18, 1972. The expected flow will be subject to the limitations for interceptors contained in § 35.2123. If assistance is awarded, the grantee shall provide assurances that the existing population will connect to the collection system within a reasonable time after project completion.
Notes, amendments, and revision history

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

§35.2118. Preaward costs.

40 C.F.R. § 35.2118

(a)
EPA will not award grant assistance for Step 2 + 3 and Step 3 work performed before award of grant assistance for that project, except:
(1)
In emergencies or instances where delay could result in significant cost increases, the Regional Administrator may approve preliminary building work (such as procurement of major equipment requiring long lead times, field testing of innovative and alternative technologies, minor sewer rehabilitation, acquisition of eligible land or an option for the purchase of eligible land or advance building on minor portions of treatment works) after completion of the environmental review as required by § 35.2113.
(2)
If the Regional Administrator approves preliminary Step 3 work, such approval is not an actual or implied commitment of grant assistance and the applicant proceeds at its own risk.
(b)
Any procurement is subject to the requirements of 40 CFR part 33, and in the case of acquisition of eligible real property, 40 CFR part 4.
Notes, amendments, and revision history

Amendments

[49 FR 6234, Feb. 17, 1984, as amended at 55 FR 27097, June 29, 1990]

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

Amendments

[49 FR 6234, Feb. 17, 1984, as amended at 55 FR 27097, June 29, 1990]

§35.2120. Infiltration/Inflow.

40 C.F.R. § 35.2120

(a)
General. The applicant shall demonstrate to the Regional Administrator's satisfaction that each sewer system discharging into the proposed treatment works project is not or will not be subject to excessive infiltration/inflow. For combined sewers, inflow is not considered excessive in any event.
(b)
Inflow. If the rainfall induced peak inflow rate results or will result in chronic operational problems during storm events, or the rainfall-induced total flow rate exceeds 275 gpcd during storm events, the applicant shall perform a study of the sewer system to determine the quantity of excessive inflow and to propose a rehabilitation program to eliminate the excessive inflow. All cases in which facilities are planned for the specific storage and/or treatment of inflow shall be subject to a cost-effectiveness analysis.
(c)
Infiltration.
(1)
If the flow rate at the existing treatment facility is 120 gallons per capita per day or less during periods of high groundwater, the applicant shall build the project including sufficient capacity to transport and treat any existing infiltration. However, if the applicant believes any specific portion of its sewer system is subject to excessive infiltration, the applicant may confirm its belief in a cost-effectiveness analysis and propose a sewer rehabilitation program to eliminate that specific excessive infiltration.
(2)
If the flow rate at the existing treatment facility is more than 120 gallons per capita per day during periods of high groundwater, the applicant shall either:
(i)
Perform a study of the sewer system to determine the quantity of excessive infiltration and to propose a sewer rehabilitation program to eliminate the excessive infiltration; or
(ii)
If the flow rate is not significantly more than 120 gallons per capita per day, request the Regional Administrator to determine that he may proceed without further study, in which case the allowable project cost will be limited to the cost of a project with a capacity of 120 gallons per capita per day under appendix A.G.2.a.
Notes, amendments, and revision history

Amendments

[49 FR 6234, Feb. 17, 1984, as amended at 50 FR 45895, Nov. 4, 1985]

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

Amendments

[49 FR 6234, Feb. 17, 1984, as amended at 50 FR 45895, Nov. 4, 1985]

§35.2122. Approval of user charge system and proposed sewer use ordinance.

40 C.F.R. § 35.2122

If the project is for Step 3 grant assistance, unless it is solely for acquisition of eligible land, the applicant must obtain the Regional Administrator's approval of its user charge system (§ 35.2140) and proposed (or existing) sewer use ordinance § 35.2130). If the applicant has a sewer use ordinance or user charge system in affect, the applicant shall demonstrate to the Regional Administrator's satisfaction that they meet the requirements of this part and are being enforced.
Notes, amendments, and revision history

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

§35.2123. Reserve capacity.

40 C.F.R. § 35.2123

EPA will limit grant assistance for reserve capacity as follows:
(a)
If EPA awarded a grant for a Step 3 interceptor segment before December 29, 1981, EPA may award grants for remaining interceptor segments included in the facilities plan with reserve capacity as planned, up to 40 years.
(b)
Except as provided in paragraph (a) of this section, if EPA awards a grant for a Step 3 or Step 3 segment of a primary, secondary, or advanced treatment facility or its interceptors included in the facilities plan before October 1, 1984, the grant for that Step 3 or Step 3 segment, and any remaining segments, may include 20 years reserve capacity.
(c)
Except as provided in paragraph (b) of this section, after September 30, 1984, no grant shall be made to provide reserve capacity for a project for secondary treatment or more stringent treatment or new interceptors and appurtenances. Grants for such projects shall be based on capacity necessary to serve existing needs (including existing needs of residential, commercial, industrial, and other users) as determined on the date of the approval of the Step 3 grant. Grant assistance awarded after September 30, 1990 shall be limited to the needs existing on September 30, 1990.
(d)
For any application with capacity in excess of that provided by this section—
(1)
All incremental costs shall be paid by the applicant. Incremental costs include all costs which would not have been incurred but for the additional excess capacity, i.e., any cost in addition to the most cost-effective alternative with eligible reserve capacity described under paragraphs (a) and (b) of this section.
(2)
It must be determined that the actual treatment works to be built meets the requirements of the National Environmental Policy Act and all applicable laws and regulations.
(3)
The Regional Administrator shall approve the plans, specifications and estimates for the actual treatment works.
(4)
The grantee shall assure the Regional Administrator satisfactorily that it has assessed the costs and financial impacts of the actual treatment works and has the capability to finance and manage their construction and operation.
(5)
The grantee must implement a user charge system which applies to the entire service area of the grantee.
(6)
The grantee shall execute appropriate grant conditions or releases protecting the Federal Government from any claim for any of the costs of construction due to the additional capacity.
Notes, amendments, and revision history

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

§35.2125. Treatment of wastewater from industrial users.

40 C.F.R. § 35.2125

(a)
Grant assistance shall not be provided for a project unless the project is included in a complete waste treatment system and the principal purpose of both the project and the system is for the treatment of domestic wastewater of the entire community, area, region or district concerned.
(b)
Allowable project costs do not include—
(1)
Costs of interceptor or collector sewers constructed exclusively, or almost exclusively, to serve industrial users; or
(2)
Costs for control or removal of pollutants in wastewater introduced into the treatment works by industrial users, unless the applicant is required to remove such pollutants introduced from nonindustrial users.
Notes, amendments, and revision history

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.

§35.2127. Federal facilities.

40 C.F.R. § 35.2127

Grant assistance shall not be provided for costs to transport or treat wastewater produced by a facility that is owned and operated by the Federal Government which contributes more than 250,000 gallons per day or 5 percent of the design flow of the complete waste treatment system, whichever is less.
Notes, amendments, and revision history

Authority

Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.; 33 U.S.C. 1251 et seq.; 42 U.S.C. 300f et seq.; 42 U.S.C. 6901 et seq.; 7 U.S.C. 136 et seq.; 15 U.S.C. 2601 et seq.; 42 U.S.C. 13101 et seq.; Pub. L. 104-134, 110 Stat. 1321, 1321-299 (1996); Pub. L. 105-65, 111 Stat. 1344, 1373 (1997), 2 CFR 200.