US Codex
C.F.R.
Browse by date
Notes

§417.4. Validation, Verification, Reassessment. — Inbound Citations

9 C.F.R. § 417.4

Cited by 7 regulations in release Current.

Citations to 9 U.S.C. § 417.4 as a whole

  • (b) Before being granted Federal inspection, an establishment shall have conducted a hazard analysis and developed and validated a HACCP plan, as required by §§ 417.2 and 417.4 of this chapter. A conditional grant of inspection shall be issued for a period not to exceed 90 days, during which period the establishment must validate its HACCP plan.
  • (b) Before being granted Federal inspection, an establishment shall have conducted a hazard analysis and developed and validated a HACCP plan, in accordance with §§ 417.2 and 417.4 of this chapter. A conditional grant of inspection shall be issued for a period not to exceed 90 days, during which period the establishment must validate its HACCP plan.
  • (7) List the verification procedures, and the frequency with which those procedures will be performed, that the establishment will use in accordance with § 417.4 of this part.
  • (ii) The establishment must validate the effectiveness of the post-lethality treatment incorporated in its HACCP plan in accordance with § 417.4. The establishment must document, either in its HACCP plan or in its Sanitation SOP or other prerequisite program, that the antimicrobial agent or process, as used, is effective in suppressing or limiting growth of L. monocytogenes.
  • (c) Before producing new product for distribution in commerce, a plant must conduct a hazard analysis and develop a HACCP plan applicable to that product, in accordance with § 417.2 of this chapter. During a period not to exceed 90 days after the date the new product is produced for distribution in commerce, the plant must validate its HACCP plan, in accordance with § 417.4 of this chapter.

Citations to §417.4(a)(2)(iii)

Citations to §417.4(a)(3)