§3276.13. What additional information must I give BLM in the monthly report for flash and dry steam facilities?
43 C.F.R. § 3276.13
In addition to the regular monthly report information required by § 3276.12, send to BLM:
Steam flow into the turbine in klbs; for dual flash facilities, you must separate the steam flow into high pressure steam and low pressure steam;
Condenser pressure in psia;
Condenser temperature in deg. F;
Auxiliary steam flow used for gas ejectors, steam seals, pumps, etc., in klbs;
Flow of condensate out of the plant (after the cooling towers) in klbs; and
Any other information we may require.