§3276.13. What additional information must I give BLM in the monthly report for flash and dry steam facilities?

43 C.F.R. § 3276.13

In addition to the regular monthly report information required by § 3276.12, send to BLM:
(a)
Steam flow into the turbine in klbs; for dual flash facilities, you must separate the steam flow into high pressure steam and low pressure steam;
(b)
Condenser pressure in psia;
(c)
Condenser temperature in deg. F;
(d)
Auxiliary steam flow used for gas ejectors, steam seals, pumps, etc., in klbs;
(e)
Flow of condensate out of the plant (after the cooling towers) in klbs; and
(f)
Any other information we may require.