§3276.12. What information must I give BLM in the monthly report for facility operations?

43 C.F.R. § 3276.12

(a)
For all electrical generation facilities, include in your monthly report of facility operations—
(1)
Mass of steam and/or hot water, in klbs, used or brought into the facility. For facilities using both steam and hot water, you must report the mass of each;
(2)
The temperature of the steam or hot water in deg. F;
(3)
The pressure of the steam or hot water in psi. You must also specify whether this is psig or psia;
(4)
Gross generation in kilowatt hours (kwh);
(5)
Net generation at the tailgate of the facility in kwh;
(6)
Temperature in deg. F and volume of the steam or hot water exiting the facility;
(7)
The number of hours the plant was on line;
(8)
A brief description of any outages; and
(9)
Any other information we may require.
(b)
For electrical generation facilities where Federal royalty is based on the sale of electricity to a utility, in addition to the information required under paragraph (a) of this section, you must include the following information in your monthly report of facility operations:
(1)
Amount of electricity delivered to the sales point in kwh, if the sales point is different from the tailgate of the facility;
(2)
Amount of electricity lost to transmission;
(3)
A report from the utility purchasing the electricity documenting the total number of kwh delivered to the sales point during the month, or monthly reporting period if it is not a calendar month, and the number of kwh delivered during diurnal and seasonal pricing periods; and
(4)
Any other information we may require.
Notes, amendments, and revision history

Authority

Authority: 30 U.S.C. 1001-1028; 43 U.S.C. 1701 et seq.; and Pub. L. 109-58.

Source

Source: 72 FR 24400, May 2, 2007, unless otherwise noted.