§63.364. Monitoring requirements. — Inbound Citations

40 C.F.R. § 63.364

Cited by 20 regulations in release Current.

Citations to 40 U.S.C. § 63.364 as a whole

  • Terms and nomenclature used in this subpart are defined in the Clean Air Act (the Act) as amended in 1990, §§ 63.2 and 63.3, or in this section. For the purposes of this subpart, if the same term is defined in subpart A of this part and in this section, it shall have the meaning given in this section.
  • (a) You must demonstrate continuous compliance with the applicable emission standard(s) using an EtO CEMS, including a shared EtO CEMS, installed and operated in accordance with the requirements of Performance Specification 19 in appendix B and Procedure 7 in appendix F to part 60 of this chapter. Alternatively, if you own or operate a facility where EtO use is less than 100 pounds/yr, you may demonstrate continuous compliance by conducting annual performance tests using the performance testing requirements in § 63.7, according to the applicability in table 6 to this subpart, the procedures listed in this section, and the test methods listed in § 63.365. If you elect to demonstrate compliance through periodic performance testing, you must also demonstrate continuous compliance with each operating limit required under this section according to the methods specified in § 63.364. If you own or operate an area source facility where EtO use is less than 100 pounds/yr where an existing collection of Group 2 room air emission is operated in accordance with the PTE requirements of EPA Method 204 of appendix M to part 51 of this chapter, you may instead conduct these performance tests once every three years.
  • (e) If you are using performance testing to demonstrate compliance with removal efficiency standards, and if you are not demonstrating continual compliance with the applicable standard(s) using an EtO CEMS, you must also determine the operating limit(s) for each control device and then monitor the parameter(s) for each control device. The procedures in the following paragraphs shall be used to establish the parameter operating limits to be continually monitored in § 63.364.
    (1) The procedures in paragraph (e)(1) of this section shall be used to determine the operating limits for acid-water scrubbers.
    (i) For determining the ethylene glycol concentration operating limit, you must establish the maximum ethylene glycol concentration as the ethylene glycol concentration averaged over three test runs; use the sampling and analysis procedures in ASTM D3695-88 (incorporated by reference, see § 63.14) to determine the ethylene glycol concentration.
    (ii) During the performance test, you must monitor and record the scrubber liquor tank level to the nearest 1/4 inch at the end of each of the three test runs. Use the data collected during the most recent performance test to calculate the average scrubber liquor tank level. This scrubber liquor tank level is the maximum operating limit for your scrubber liquor tank. Repeat this procedure for every scrubber liquor tank that is included in the performance test.
    (iii) During the performance test, you must monitor and record the scrubber liquor pH at least once every 15 minutes during each of the three test runs. You must use pH monitors as described in § 63.364(b)(3). Use the data collected during the most recent performance test to calculate the average scrubber pH measured. This scrubber liquor pH is the maximum operating limit for your acid-water scrubber. Repeat this procedure for every scrubber liquor tank that is included in the performance test.
    (2) The procedures in this paragraph shall be used to determine the operating limits for thermal oxidizers.
    (i) During the performance test, you must monitor and record the temperature at least once every 15 minutes during each of the three test runs. You must monitor the temperature in the firebox of the thermal oxidizer or immediately downstream of the firebox. You must use temperature monitors as described in § 63.364(c)(4).
    (ii) Use the data collected during the performance test to calculate and record the average temperature for each test run maintained during the performance test. The average temperature of the test runs is the minimum operating limit for your thermal oxidizer, unless it exceeds the recommended maximum oxidation temperature provided by the oxidation unit manufacturer. If this occurs, the minimum operating limit for your thermal oxidizer consists of the recommended maximum oxidation temperature provided by the oxidation unit manufacturer.
    (iii) Paragraphs (e)(2)(i) and (ii) of this section must be completed for each thermal oxidizer that is involved in the performance test.
    (3) The procedures in this paragraph shall be used to determine the operating limits for catalytic oxidizers.
    (i) Prior to the start of the performance test, you must check the catalyst bed for channeling, abrasion, and settling. If problems are found during the inspection, you must replace the catalyst bed or take other correction action consistent with the manufacturer's recommendations.
    (ii) During the performance test, you must monitor and record the temperature at the inlet to the catalyst bed and the temperature difference across the catalyst bed at least once every 15 minutes during each of the three test runs. You must use temperature monitors as described in § 63.364(c)(4).
    (iii) Use the data collected during the performance test to calculate and record the average temperature at the inlet to the catalyst bed and the average temperature difference across the catalyst bed maintained for each test run, and then calculate the arithmetic averages of the test runs. These arithmetic averages of the test runs are the minimum operating limits for your catalytic oxidizer, unless it exceeds the recommended maximum oxidation temperature provided by the oxidation unit manufacturer. If this occurs, the minimum operating limit for your catalytic oxidizer consists of the recommended maximum oxidation temperature provided by the oxidation unit manufacturer.
    (iv) Paragraphs (e)(3)(i) through (iii) of this section must be completed for each catalytic oxidizer that is involved in the performance test.
    (4) During the performance test, you must monitor and record the gas/solid reactor pressure drop at least once every 15 minutes during each of the three test runs. Use the data collected during the most recent performance test to calculate the gas/solid reactor pressure measured. This gas/solid reactor pressure is the maximum operating limit for your gas/solid. Repeat this procedure for every gas/solid reactor that is included in the performance test.
    (5) If you seek to demonstrate compliance with a standard found at § 63.362 with a control device other than an acid-water scrubber, catalytic oxidizer, thermal oxidizer, or gas/solid reactor, you must provide to the Administrator the information requested under § 63.363(e). You must submit a monitoring plan that contains the following items: a description of the device; test results collected in accordance with § 63.363(e) verifying the performance of the device for controlling EtO emissions to the atmosphere to the levels required by the applicable standards; the appropriate operating parameters that will be monitored, identifying the ongoing QA procedures and performance specifications that will be conducted on the instruments; the frequency of conducting QA and performance checks; and the frequency of measuring and recording to establish continuous compliance with the standards. Your monitoring plan is subject to the Administrator's approval. Upon approval by the Administrator you must install, calibrate, operate, and maintain the monitor(s) approved by the Administrator based on the information submitted in your monitoring plan. You must include in your monitoring plan proposed performance specifications and quality assurance procedures for your monitors. The Administrator may request further information and shall approve appropriate test methods and procedures.

Citations to §63.364(b)(3)

  • (iii) During the performance test, you must monitor and record the scrubber liquor pH at least once every 15 minutes during each of the three test runs. You must use pH monitors as described in § 63.364(b)(3). Use the data collected during the most recent performance test to calculate the average scrubber pH measured. This scrubber liquor pH is the maximum operating limit for your acid-water scrubber. Repeat this procedure for every scrubber liquor tank that is included in the performance test.

Citations to §63.364(c)(4)

  • (i) During the performance test, you must monitor and record the temperature at least once every 15 minutes during each of the three test runs. You must monitor the temperature in the firebox of the thermal oxidizer or immediately downstream of the firebox. You must use temperature monitors as described in § 63.364(c)(4).

Citations to §63.364(f)

  • (b) The standards in paragraphs (c) through (k) of this section apply at all times. If using EtO CEMS to determine compliance with an applicable standard, this compliance demonstration is based on the previous 30-operating days of data. If using EtO CEMS to determine compliance with an applicable emission reduction standard in paragraphs (c) through (g) and (i) of this section for each operating day, you must determine the total inlet mass to and outlet mass from the control system using the procedures laid out in § 63.364(f) and appendix A to this subpart, and you must maintain the emission limit based on the inlet mass and the applicable emission reduction standard. If using EtO CEMS to determine compliance with an applicable emission reduction standard in paragraph (j) of this section, you must continuously comply with the requirements of that paragraph.

Citations to §63.364(f)(1)(i)

Citations to §63.364(f)(1)(i)(C)(1)

  • (2) If you elect to comply with a SWEL based upon emissions streams, you must follow requirements of paragraphs (j)(2)(i) through (iii) of this section to determine the applicable SWEL and demonstrate compliance. Under this approach, for each non-SCV affected source, you must determine the mass of EtO sent to controls and apply the applicable emission reduction standard. For each SCV affected source, you must determine the mass of EtO sent to controls as specified in § 63.364(f)(1)(i)(C)(1) and apply the applicable emission reduction standard. The SWEL is determined by summing across the result of this calculation for each affected source (both non-SCV and SCV). Then, for each CEMS at the outlet of the control system(s) at the facility, determine the 30-operating day rolling sum of emissions. Finally, determine the facility actual emissions by summing the 30-operating day rolling sums for each CEMS at the facility. You must maintain actual emissions at or below the SWEL.
    (iii) Compliance with the SWEL based upon emission streams shall be determined by demonstrating that EFac, as calculated in accordance with paragraph (j)(2)(ii) of this section, for each 30-operating day period is at or below SWELStreams, as calculated in paragraph (j)(2)(i) of this section.

Citations to §63.364(f)(4)

Citations to §63.364(f)(5)

Citations to §63.364(g)(3)(i)

  • (3) You must install, operate, calibrate, and maintain instruments, according to the requirements in paragraphs (g)(3)(i) through (ix) of this section, for continuously measuring and recording the stack gas flow rate to allow determination of compliance with the minimum volumetric flow rate through the affected stack operating limit(s).
    (i) You must install each sensor of the flow rate monitoring system in a location that provides representative measurement of the exhaust gas flow rate. The flow rate sensor is that portion of the system that senses the volumetric flow rate and generates an output proportional to that flow rate.
    (ii) The flow rate monitoring system must be designed to measure the exhaust flow rate over a range that extends from a value of at least 20 percent less than the lowest expected exhaust flow rate to a value of at least 20 percent greater than the highest expected exhaust flow rate.
    (iii) The flow rate monitoring system must be equipped with a data acquisition and recording system that is capable of recording values over the entire range specified in paragraph (g)(3)(ii) of this section.
    (iv) The signal conditioner, wiring, power supply, and data acquisition and recording system for the flow rate monitoring system must be compatible with the output signal of the flow rate sensors used in the monitoring system.
    (v) The flow rate monitoring system must be designed to complete a minimum of one cycle of operation for each successive 15-minute period.
    (vi) The flow rate sensor must have provisions to determine the daily zero and upscale calibration drift (CD) (see sections 3.1 and 8.3 of Performance Specification 2 in appendix B to Part 60 of this chapter for a discussion of CD).
    (A) Conduct the CD tests at two reference signal levels, zero (e.g., 0 to 20 percent of span) and upscale (e.g., 50 to 70 percent of span).
    (B) The absolute value of the difference between the flow monitor response and the reference signal must be equal to or less than 3 percent of the flow monitor span.
    (vii) You must perform an initial relative accuracy test of the flow rate monitoring system according to section 8.2 of Performance Specification 6 of appendix B to part 60 of the chapter with the exceptions in paragraphs (g)(3)(vii)(A) and (B) of this section.
    (A) The relative accuracy test is to evaluate the flow rate monitoring system alone rather than a continuous emission rate monitoring system.
    (B) The relative accuracy of the flow rate monitoring system shall be no greater than 10 percent of the mean value of the reference method data.
    (viii) You must verify the accuracy of the flow rate monitoring system at least once per year by repeating the relative accuracy test specified in paragraph (g)(3)(vii) of this section.
    (ix) You must operate the flow rate monitoring system and record data during all periods of operation of the affected facility including periods of startup, shutdown, and malfunction.

Citations to §63.364(g)(3)(ii)

  • (3) You must install, operate, calibrate, and maintain instruments, according to the requirements in paragraphs (g)(3)(i) through (ix) of this section, for continuously measuring and recording the stack gas flow rate to allow determination of compliance with the minimum volumetric flow rate through the affected stack operating limit(s).
    (i) You must install each sensor of the flow rate monitoring system in a location that provides representative measurement of the exhaust gas flow rate. The flow rate sensor is that portion of the system that senses the volumetric flow rate and generates an output proportional to that flow rate.
    (ii) The flow rate monitoring system must be designed to measure the exhaust flow rate over a range that extends from a value of at least 20 percent less than the lowest expected exhaust flow rate to a value of at least 20 percent greater than the highest expected exhaust flow rate.
    (iii) The flow rate monitoring system must be equipped with a data acquisition and recording system that is capable of recording values over the entire range specified in paragraph (g)(3)(ii) of this section.
    (iv) The signal conditioner, wiring, power supply, and data acquisition and recording system for the flow rate monitoring system must be compatible with the output signal of the flow rate sensors used in the monitoring system.
    (v) The flow rate monitoring system must be designed to complete a minimum of one cycle of operation for each successive 15-minute period.
    (vi) The flow rate sensor must have provisions to determine the daily zero and upscale calibration drift (CD) (see sections 3.1 and 8.3 of Performance Specification 2 in appendix B to Part 60 of this chapter for a discussion of CD).
    (A) Conduct the CD tests at two reference signal levels, zero (e.g., 0 to 20 percent of span) and upscale (e.g., 50 to 70 percent of span).
    (B) The absolute value of the difference between the flow monitor response and the reference signal must be equal to or less than 3 percent of the flow monitor span.
    (vii) You must perform an initial relative accuracy test of the flow rate monitoring system according to section 8.2 of Performance Specification 6 of appendix B to part 60 of the chapter with the exceptions in paragraphs (g)(3)(vii)(A) and (B) of this section.
    (A) The relative accuracy test is to evaluate the flow rate monitoring system alone rather than a continuous emission rate monitoring system.
    (B) The relative accuracy of the flow rate monitoring system shall be no greater than 10 percent of the mean value of the reference method data.
    (viii) You must verify the accuracy of the flow rate monitoring system at least once per year by repeating the relative accuracy test specified in paragraph (g)(3)(vii) of this section.
    (ix) You must operate the flow rate monitoring system and record data during all periods of operation of the affected facility including periods of startup, shutdown, and malfunction.

Citations to §63.364(g)(3)(iii)

  • (3) You must install, operate, calibrate, and maintain instruments, according to the requirements in paragraphs (g)(3)(i) through (ix) of this section, for continuously measuring and recording the stack gas flow rate to allow determination of compliance with the minimum volumetric flow rate through the affected stack operating limit(s).
    (i) You must install each sensor of the flow rate monitoring system in a location that provides representative measurement of the exhaust gas flow rate. The flow rate sensor is that portion of the system that senses the volumetric flow rate and generates an output proportional to that flow rate.
    (ii) The flow rate monitoring system must be designed to measure the exhaust flow rate over a range that extends from a value of at least 20 percent less than the lowest expected exhaust flow rate to a value of at least 20 percent greater than the highest expected exhaust flow rate.
    (iii) The flow rate monitoring system must be equipped with a data acquisition and recording system that is capable of recording values over the entire range specified in paragraph (g)(3)(ii) of this section.
    (iv) The signal conditioner, wiring, power supply, and data acquisition and recording system for the flow rate monitoring system must be compatible with the output signal of the flow rate sensors used in the monitoring system.
    (v) The flow rate monitoring system must be designed to complete a minimum of one cycle of operation for each successive 15-minute period.
    (vi) The flow rate sensor must have provisions to determine the daily zero and upscale calibration drift (CD) (see sections 3.1 and 8.3 of Performance Specification 2 in appendix B to Part 60 of this chapter for a discussion of CD).
    (A) Conduct the CD tests at two reference signal levels, zero (e.g., 0 to 20 percent of span) and upscale (e.g., 50 to 70 percent of span).
    (B) The absolute value of the difference between the flow monitor response and the reference signal must be equal to or less than 3 percent of the flow monitor span.
    (vii) You must perform an initial relative accuracy test of the flow rate monitoring system according to section 8.2 of Performance Specification 6 of appendix B to part 60 of the chapter with the exceptions in paragraphs (g)(3)(vii)(A) and (B) of this section.
    (A) The relative accuracy test is to evaluate the flow rate monitoring system alone rather than a continuous emission rate monitoring system.
    (B) The relative accuracy of the flow rate monitoring system shall be no greater than 10 percent of the mean value of the reference method data.
    (viii) You must verify the accuracy of the flow rate monitoring system at least once per year by repeating the relative accuracy test specified in paragraph (g)(3)(vii) of this section.
    (ix) You must operate the flow rate monitoring system and record data during all periods of operation of the affected facility including periods of startup, shutdown, and malfunction.

Citations to §63.364(g)(3)(iv)

  • (3) You must install, operate, calibrate, and maintain instruments, according to the requirements in paragraphs (g)(3)(i) through (ix) of this section, for continuously measuring and recording the stack gas flow rate to allow determination of compliance with the minimum volumetric flow rate through the affected stack operating limit(s).
    (i) You must install each sensor of the flow rate monitoring system in a location that provides representative measurement of the exhaust gas flow rate. The flow rate sensor is that portion of the system that senses the volumetric flow rate and generates an output proportional to that flow rate.
    (ii) The flow rate monitoring system must be designed to measure the exhaust flow rate over a range that extends from a value of at least 20 percent less than the lowest expected exhaust flow rate to a value of at least 20 percent greater than the highest expected exhaust flow rate.
    (iii) The flow rate monitoring system must be equipped with a data acquisition and recording system that is capable of recording values over the entire range specified in paragraph (g)(3)(ii) of this section.
    (iv) The signal conditioner, wiring, power supply, and data acquisition and recording system for the flow rate monitoring system must be compatible with the output signal of the flow rate sensors used in the monitoring system.
    (v) The flow rate monitoring system must be designed to complete a minimum of one cycle of operation for each successive 15-minute period.
    (vi) The flow rate sensor must have provisions to determine the daily zero and upscale calibration drift (CD) (see sections 3.1 and 8.3 of Performance Specification 2 in appendix B to Part 60 of this chapter for a discussion of CD).
    (A) Conduct the CD tests at two reference signal levels, zero (e.g., 0 to 20 percent of span) and upscale (e.g., 50 to 70 percent of span).
    (B) The absolute value of the difference between the flow monitor response and the reference signal must be equal to or less than 3 percent of the flow monitor span.
    (vii) You must perform an initial relative accuracy test of the flow rate monitoring system according to section 8.2 of Performance Specification 6 of appendix B to part 60 of the chapter with the exceptions in paragraphs (g)(3)(vii)(A) and (B) of this section.
    (A) The relative accuracy test is to evaluate the flow rate monitoring system alone rather than a continuous emission rate monitoring system.
    (B) The relative accuracy of the flow rate monitoring system shall be no greater than 10 percent of the mean value of the reference method data.
    (viii) You must verify the accuracy of the flow rate monitoring system at least once per year by repeating the relative accuracy test specified in paragraph (g)(3)(vii) of this section.
    (ix) You must operate the flow rate monitoring system and record data during all periods of operation of the affected facility including periods of startup, shutdown, and malfunction.

Citations to §63.364(g)(3)(ix)

  • (3) You must install, operate, calibrate, and maintain instruments, according to the requirements in paragraphs (g)(3)(i) through (ix) of this section, for continuously measuring and recording the stack gas flow rate to allow determination of compliance with the minimum volumetric flow rate through the affected stack operating limit(s).
    (i) You must install each sensor of the flow rate monitoring system in a location that provides representative measurement of the exhaust gas flow rate. The flow rate sensor is that portion of the system that senses the volumetric flow rate and generates an output proportional to that flow rate.
    (ii) The flow rate monitoring system must be designed to measure the exhaust flow rate over a range that extends from a value of at least 20 percent less than the lowest expected exhaust flow rate to a value of at least 20 percent greater than the highest expected exhaust flow rate.
    (iii) The flow rate monitoring system must be equipped with a data acquisition and recording system that is capable of recording values over the entire range specified in paragraph (g)(3)(ii) of this section.
    (iv) The signal conditioner, wiring, power supply, and data acquisition and recording system for the flow rate monitoring system must be compatible with the output signal of the flow rate sensors used in the monitoring system.
    (v) The flow rate monitoring system must be designed to complete a minimum of one cycle of operation for each successive 15-minute period.
    (vi) The flow rate sensor must have provisions to determine the daily zero and upscale calibration drift (CD) (see sections 3.1 and 8.3 of Performance Specification 2 in appendix B to Part 60 of this chapter for a discussion of CD).
    (A) Conduct the CD tests at two reference signal levels, zero (e.g., 0 to 20 percent of span) and upscale (e.g., 50 to 70 percent of span).
    (B) The absolute value of the difference between the flow monitor response and the reference signal must be equal to or less than 3 percent of the flow monitor span.
    (vii) You must perform an initial relative accuracy test of the flow rate monitoring system according to section 8.2 of Performance Specification 6 of appendix B to part 60 of the chapter with the exceptions in paragraphs (g)(3)(vii)(A) and (B) of this section.
    (A) The relative accuracy test is to evaluate the flow rate monitoring system alone rather than a continuous emission rate monitoring system.
    (B) The relative accuracy of the flow rate monitoring system shall be no greater than 10 percent of the mean value of the reference method data.
    (viii) You must verify the accuracy of the flow rate monitoring system at least once per year by repeating the relative accuracy test specified in paragraph (g)(3)(vii) of this section.
    (ix) You must operate the flow rate monitoring system and record data during all periods of operation of the affected facility including periods of startup, shutdown, and malfunction.

Citations to §63.364(g)(3)(v)

  • (3) You must install, operate, calibrate, and maintain instruments, according to the requirements in paragraphs (g)(3)(i) through (ix) of this section, for continuously measuring and recording the stack gas flow rate to allow determination of compliance with the minimum volumetric flow rate through the affected stack operating limit(s).
    (i) You must install each sensor of the flow rate monitoring system in a location that provides representative measurement of the exhaust gas flow rate. The flow rate sensor is that portion of the system that senses the volumetric flow rate and generates an output proportional to that flow rate.
    (ii) The flow rate monitoring system must be designed to measure the exhaust flow rate over a range that extends from a value of at least 20 percent less than the lowest expected exhaust flow rate to a value of at least 20 percent greater than the highest expected exhaust flow rate.
    (iii) The flow rate monitoring system must be equipped with a data acquisition and recording system that is capable of recording values over the entire range specified in paragraph (g)(3)(ii) of this section.
    (iv) The signal conditioner, wiring, power supply, and data acquisition and recording system for the flow rate monitoring system must be compatible with the output signal of the flow rate sensors used in the monitoring system.
    (v) The flow rate monitoring system must be designed to complete a minimum of one cycle of operation for each successive 15-minute period.
    (vi) The flow rate sensor must have provisions to determine the daily zero and upscale calibration drift (CD) (see sections 3.1 and 8.3 of Performance Specification 2 in appendix B to Part 60 of this chapter for a discussion of CD).
    (A) Conduct the CD tests at two reference signal levels, zero (e.g., 0 to 20 percent of span) and upscale (e.g., 50 to 70 percent of span).
    (B) The absolute value of the difference between the flow monitor response and the reference signal must be equal to or less than 3 percent of the flow monitor span.
    (vii) You must perform an initial relative accuracy test of the flow rate monitoring system according to section 8.2 of Performance Specification 6 of appendix B to part 60 of the chapter with the exceptions in paragraphs (g)(3)(vii)(A) and (B) of this section.
    (A) The relative accuracy test is to evaluate the flow rate monitoring system alone rather than a continuous emission rate monitoring system.
    (B) The relative accuracy of the flow rate monitoring system shall be no greater than 10 percent of the mean value of the reference method data.
    (viii) You must verify the accuracy of the flow rate monitoring system at least once per year by repeating the relative accuracy test specified in paragraph (g)(3)(vii) of this section.
    (ix) You must operate the flow rate monitoring system and record data during all periods of operation of the affected facility including periods of startup, shutdown, and malfunction.

Citations to §63.364(g)(3)(vi)

  • (3) You must install, operate, calibrate, and maintain instruments, according to the requirements in paragraphs (g)(3)(i) through (ix) of this section, for continuously measuring and recording the stack gas flow rate to allow determination of compliance with the minimum volumetric flow rate through the affected stack operating limit(s).
    (i) You must install each sensor of the flow rate monitoring system in a location that provides representative measurement of the exhaust gas flow rate. The flow rate sensor is that portion of the system that senses the volumetric flow rate and generates an output proportional to that flow rate.
    (ii) The flow rate monitoring system must be designed to measure the exhaust flow rate over a range that extends from a value of at least 20 percent less than the lowest expected exhaust flow rate to a value of at least 20 percent greater than the highest expected exhaust flow rate.
    (iii) The flow rate monitoring system must be equipped with a data acquisition and recording system that is capable of recording values over the entire range specified in paragraph (g)(3)(ii) of this section.
    (iv) The signal conditioner, wiring, power supply, and data acquisition and recording system for the flow rate monitoring system must be compatible with the output signal of the flow rate sensors used in the monitoring system.
    (v) The flow rate monitoring system must be designed to complete a minimum of one cycle of operation for each successive 15-minute period.
    (vi) The flow rate sensor must have provisions to determine the daily zero and upscale calibration drift (CD) (see sections 3.1 and 8.3 of Performance Specification 2 in appendix B to Part 60 of this chapter for a discussion of CD).
    (A) Conduct the CD tests at two reference signal levels, zero (e.g., 0 to 20 percent of span) and upscale (e.g., 50 to 70 percent of span).
    (B) The absolute value of the difference between the flow monitor response and the reference signal must be equal to or less than 3 percent of the flow monitor span.
    (vii) You must perform an initial relative accuracy test of the flow rate monitoring system according to section 8.2 of Performance Specification 6 of appendix B to part 60 of the chapter with the exceptions in paragraphs (g)(3)(vii)(A) and (B) of this section.
    (A) The relative accuracy test is to evaluate the flow rate monitoring system alone rather than a continuous emission rate monitoring system.
    (B) The relative accuracy of the flow rate monitoring system shall be no greater than 10 percent of the mean value of the reference method data.
    (viii) You must verify the accuracy of the flow rate monitoring system at least once per year by repeating the relative accuracy test specified in paragraph (g)(3)(vii) of this section.
    (ix) You must operate the flow rate monitoring system and record data during all periods of operation of the affected facility including periods of startup, shutdown, and malfunction.

Citations to §63.364(g)(3)(vii)

  • (3) You must install, operate, calibrate, and maintain instruments, according to the requirements in paragraphs (g)(3)(i) through (ix) of this section, for continuously measuring and recording the stack gas flow rate to allow determination of compliance with the minimum volumetric flow rate through the affected stack operating limit(s).
    (i) You must install each sensor of the flow rate monitoring system in a location that provides representative measurement of the exhaust gas flow rate. The flow rate sensor is that portion of the system that senses the volumetric flow rate and generates an output proportional to that flow rate.
    (ii) The flow rate monitoring system must be designed to measure the exhaust flow rate over a range that extends from a value of at least 20 percent less than the lowest expected exhaust flow rate to a value of at least 20 percent greater than the highest expected exhaust flow rate.
    (iii) The flow rate monitoring system must be equipped with a data acquisition and recording system that is capable of recording values over the entire range specified in paragraph (g)(3)(ii) of this section.
    (iv) The signal conditioner, wiring, power supply, and data acquisition and recording system for the flow rate monitoring system must be compatible with the output signal of the flow rate sensors used in the monitoring system.
    (v) The flow rate monitoring system must be designed to complete a minimum of one cycle of operation for each successive 15-minute period.
    (vi) The flow rate sensor must have provisions to determine the daily zero and upscale calibration drift (CD) (see sections 3.1 and 8.3 of Performance Specification 2 in appendix B to Part 60 of this chapter for a discussion of CD).
    (A) Conduct the CD tests at two reference signal levels, zero (e.g., 0 to 20 percent of span) and upscale (e.g., 50 to 70 percent of span).
    (B) The absolute value of the difference between the flow monitor response and the reference signal must be equal to or less than 3 percent of the flow monitor span.
    (vii) You must perform an initial relative accuracy test of the flow rate monitoring system according to section 8.2 of Performance Specification 6 of appendix B to part 60 of the chapter with the exceptions in paragraphs (g)(3)(vii)(A) and (B) of this section.
    (A) The relative accuracy test is to evaluate the flow rate monitoring system alone rather than a continuous emission rate monitoring system.
    (B) The relative accuracy of the flow rate monitoring system shall be no greater than 10 percent of the mean value of the reference method data.
    (viii) You must verify the accuracy of the flow rate monitoring system at least once per year by repeating the relative accuracy test specified in paragraph (g)(3)(vii) of this section.
    (ix) You must operate the flow rate monitoring system and record data during all periods of operation of the affected facility including periods of startup, shutdown, and malfunction.

Citations to §63.364(g)(3)(viii)

  • (3) You must install, operate, calibrate, and maintain instruments, according to the requirements in paragraphs (g)(3)(i) through (ix) of this section, for continuously measuring and recording the stack gas flow rate to allow determination of compliance with the minimum volumetric flow rate through the affected stack operating limit(s).
    (i) You must install each sensor of the flow rate monitoring system in a location that provides representative measurement of the exhaust gas flow rate. The flow rate sensor is that portion of the system that senses the volumetric flow rate and generates an output proportional to that flow rate.
    (ii) The flow rate monitoring system must be designed to measure the exhaust flow rate over a range that extends from a value of at least 20 percent less than the lowest expected exhaust flow rate to a value of at least 20 percent greater than the highest expected exhaust flow rate.
    (iii) The flow rate monitoring system must be equipped with a data acquisition and recording system that is capable of recording values over the entire range specified in paragraph (g)(3)(ii) of this section.
    (iv) The signal conditioner, wiring, power supply, and data acquisition and recording system for the flow rate monitoring system must be compatible with the output signal of the flow rate sensors used in the monitoring system.
    (v) The flow rate monitoring system must be designed to complete a minimum of one cycle of operation for each successive 15-minute period.
    (vi) The flow rate sensor must have provisions to determine the daily zero and upscale calibration drift (CD) (see sections 3.1 and 8.3 of Performance Specification 2 in appendix B to Part 60 of this chapter for a discussion of CD).
    (A) Conduct the CD tests at two reference signal levels, zero (e.g., 0 to 20 percent of span) and upscale (e.g., 50 to 70 percent of span).
    (B) The absolute value of the difference between the flow monitor response and the reference signal must be equal to or less than 3 percent of the flow monitor span.
    (vii) You must perform an initial relative accuracy test of the flow rate monitoring system according to section 8.2 of Performance Specification 6 of appendix B to part 60 of the chapter with the exceptions in paragraphs (g)(3)(vii)(A) and (B) of this section.
    (A) The relative accuracy test is to evaluate the flow rate monitoring system alone rather than a continuous emission rate monitoring system.
    (B) The relative accuracy of the flow rate monitoring system shall be no greater than 10 percent of the mean value of the reference method data.
    (viii) You must verify the accuracy of the flow rate monitoring system at least once per year by repeating the relative accuracy test specified in paragraph (g)(3)(vii) of this section.
    (ix) You must operate the flow rate monitoring system and record data during all periods of operation of the affected facility including periods of startup, shutdown, and malfunction.

Citations to §63.364(h)

  • (g) You must comply with the applicable standard in table 5 to this subpart, and you must meet each applicable requirement specified in § 63.363. If Group 2 room air emissions are combined with a stream from another emission source, you must comply with the appropriate emission standard as prescribed in paragraph (i) of this section. If you are required to limit the sterilization chamber concentration of EtO to 1 ppmv prior to opening the sterilization chamber door, you must meet the monitoring requirements specified in § 63.364(h).