§63.305. Alternative standards for coke oven doors equipped with sheds. — Inbound Citations

40 C.F.R. § 63.305

Cited by 9 regulations in release Current.

Citations to 40 U.S.C. § 63.305 as a whole

  • Terms used in this subpart are defined in the Act or in this section as follows:
  • (a) Except as provided in § 63.304 or § 63.305, on and after the dates specified in this paragraph, no owner or operator shall cause to be discharged or allow to be discharged to the atmosphere, coke oven emissions from each affected existing by-product coke oven battery that exceed any of the following emission limitations or requirements:
    (1) On and after December 31, 1995;
    (i) For coke oven doors;
    (A) 6.0 percent leaking coke oven doors for each tall by-product coke oven battery, as determined according to the procedures in § 63.309(d)(1); and
    (B) 5.5 percent leaking coke oven doors for each short by-product coke oven battery, as determined according to the procedures in § 63.309(d)(1);
    (ii) 0.6 percent leaking topside port lids, as determined by the procedures in § 63.309(d)(1);
    (iii) 3.0 percent leaking offtake system(s), as determined by the procedures in § 63.309(d)(1); and
    (iv) 12 seconds of visible emissions per charge, as determined by the procedures in § 63.309(d)(2).
    (2) On and after January 1, 2003, unless the Administrator promulgates more stringent limits pursuant to section 112(f) of the Act;
    (i) 5.5 percent leaking coke oven doors for each tall by-product coke oven battery, as determined by the procedures in § 63.309(d)(1); and
    (ii) 5.0 percent leaking coke oven doors for each short by-product coke oven battery, as determined by the procedures in § 63.309(d)(1).
    (3) On and after July 14, 2005;
    (i) 4.0 percent leaking coke oven doors for each tall by-product coke oven battery and for each by-product coke oven battery owned or operated by a foundry coke producer, as determined by the procedures in § 63.309(d)(1);
    (ii) 3.3 percent leaking coke oven doors for each by-product coke oven battery not subject to the emission limitation in paragraph (a)(3)(i) of this section, as determined by the procedures in § 63.309(d)(1);
    (iii) 0.4 percent leaking topside port lids, as determined by the procedures in § 63.309(d)(1);
    (iv) 2.5 percent leaking offtake system(s), as determined by the procedures in § 63.309(d)(1); and
    (v) 12 seconds of visible emissions per charge, as determined by the procedures in § 63.309(d)(2).
    (i) for facilities with coke production capacity more than or equal to 3 million tpy coke and as determined by the procedures in § 63.309(d)(1), 2.5 percent leaking coke oven doors for each tall by-product coke oven battery and 1.7 percent leaking coke oven doors for each not tall by-product coke oven battery;
    (ii) for facilities with coke production capacity less than 3 million tpy coke and as determined by the procedures in § 63.309(d)(1), 3.8 percent leaking coke oven doors for each tall by-product coke oven battery and 3.2 percent leaking coke oven doors for each not tall by-product coke oven battery;
    (iii) 0.32 percent leaking topside port lids, as determined by the procedures in § 63.309(d)(1);
    (iv) 2.1 percent leaking offtake system(s), as determined by the procedures in § 63.309(d)(1); and
    (v) 12 seconds of visible emissions per charge, as determined by the procedures in § 63.309(d)(2).
  • (b) Except as provided in paragraphs (b)(4), (b)(5), and (b)(7) of this section and in § 63.305, on and after the dates specified in this paragraph, no owner or operator shall cause to be discharged or allow to be discharged to the atmosphere coke oven emissions from a by-product coke oven battery that exceed any of the following emission limitations:
    (1) On and after November 15, 1993;
    (i) 7.0 percent leaking coke oven doors, as determined by the procedures in § 63.309(d)(1);
    (ii) 0.83 percent leaking topside port lids, as determined by the procedures in § 63.309(d)(1);
    (iii) 4.2 percent leaking offtake system(s), as determined by the procedures in § 63.309(d)(1); and
    (iv) 12 seconds of visible emissions per charge, as determined by the procedures in § 63.309(d)(2).
    (2) On and after January 1, 1998;
    (A) 4.3 percent leaking coke oven doors for each tall by-product coke oven battery and for each by-product coke oven battery owned or operated by a foundry coke producer, as determined by the procedures in § 63.309(d)(1); and
    (B) 3.8 percent leaking coke oven doors on each by-product coke oven battery not subject to the emission limitation in paragraph (b)(2)(i)(A) of this section, as determined by the procedures in § 63.309(d)(1);
    (ii) 0.4 percent leaking topside port lids, as determined by the procedures in § 63.309(d)(1);
    (iii) 2.5 percent leaking offtake system(s), as determined by the procedures in § 63.309(d)(1); and
    (iv) 12 seconds of visible emissions per charge, as determined by the procedures in § 63.309(d)(2).
    (3) On and after January 1, 2010, unless the Administrator promulgates more stringent limits pursuant to section 112(i)(8)(C) of the Act;
    (i) 4.0 percent leaking coke oven doors on each tall by-product coke oven battery and for each by-product coke oven battery owned or operated by a foundry coke producer, as determined by the procedures in § 63.309(d)(1); and
    (ii) 3.3 percent leaking coke oven doors for each by-product coke oven battery not subject to the emission limitation in paragraph (b)(3)(i) of this section, as determined by the procedures in § 63.309(d)(1).
    (4) No owner or operator shall cause to be discharged or allow to be discharged to the atmosphere coke oven emissions from a brownfield or padup rebuild by-product coke oven battery, other than those specified in paragraph (b)(4)(v) of this section, that exceed any of the following emission limitations:
    (i) For coke oven doors;
    (A) 4.0 percent leaking coke oven doors for each tall by-product coke oven battery, as determined by the procedures in § 63.309(d)(1); and
    (B) 3.3 percent leaking coke oven doors on each short by-product coke oven battery, as determined by the procedures in § 63.309(d)(1);
    (ii) 0.4 percent leaking topside port lids, as determined by the procedures in § 63.309(d)(1);
    (iii) 2.5 percent leaking offtake system(s), as determined by the procedures in § 63.309(d)(1); and
    (iv) 12 seconds of visible emissions per charge, as determined by the procedures in § 63.309(d)(2).
    (v) The requirements of paragraph (b)(4) of this section shall not apply and the requirements of paragraphs (b)(1), (b)(2), and (b)(3) of this section do apply to the following brownfield or padup rebuild coke oven batteries:
    (A) 2;
    (B) 4; and
    (C) 3.
    (vi) To retain the exclusion provided in paragraph (b)(4)(v) of this section, a coke oven battery specified in paragraph (b)(4)(v) of this section shall commence construction not later than July 1, 1996, or 1 year after obtaining a construction permit, whichever is earlier.
    (5) The owner or operator of a cold-idle coke oven battery that shut down on or after November 15, 1990, shall comply with the following emission limitations:
    (i) For a brownfield coke oven battery or a padup rebuild coke oven battery, coke oven emissions shall not exceed the emission limitations in paragraph (b)(4) of this section; and
    (ii) For a cold-idle battery other than a brownfield or padup rebuild coke oven battery, coke oven emissions shall not exceed the emission limitations in paragraphs (b)(1) through (b)(3) of this section.
    (6) The owner or operator of a cold-idle coke oven battery that shut down prior to November 15, 1990, shall submit a written request to the Administrator to include the battery in the design capacity of a coke plant as of November 15, 1990. A copy of the request shall also be sent to Director, Office of Air Quality Planning and Standards, U.S. Environmental Protection Agency, Research Triangle Park, NC 27711. The Administrator will review and approve or disapprove a request according to the following procedures:
    (i) Requests will be reviewed for completeness in the order received. A complete request shall include:
    (A) Battery identification;
    (B) Design information, including the design capacity and number and size of ovens; and
    (C) A brief description of the owner or operator's plans for the cold-idle battery, including a statement whether construction of a padup rebuild or a brownfield coke oven battery is contemplated.
    (ii) A complete request shall be approved if the design capacity of the battery and the design capacity of all previous approvals does not exceed the capacity limit in paragraph (b)(6)(i)(C) of this section.
    (iii) The total nationwide coke capacity of coke oven batteries that receive approval under paragraph (b)(6) of this section shall not exceed 2.7 million Mg/yr (3.0 million ton/yr).
    (iv) If a construction permit is required, an approval shall lapse if a construction permit is not issued within 3 years of the approval date, or if the construction permit lapses.
    (v) If a construction permit is not required, an approval will lapse if the battery is not restarted within 2 years of the approval date.
    (7) The owner or operator of a by-product coke oven battery with fewer than 30 ovens may elect to comply with an emission limitation of 2 or fewer leaking coke oven doors, as determined by the procedures in § 63.309(d)(4), as an alternative to the emission limitation for coke oven doors in paragraphs (b)(2)(i), (b)(3) (i) through (ii), (b)(4)(i), (b)(5), and (b)(6) of this section.
    (i) 2.5 percent leaking coke oven doors on each tall by-product coke oven battery and for each by-product coke oven battery owned or operated by a foundry coke producer, as determined by the procedures in § 63.309(d)(1) for facilities with production capacity greater than 3 million tpy coke or 1.7 percent leaking coke oven doors for each not tall by-product coke oven battery and for each by-product coke oven battery owned or operated by a foundry coke producer, as determined by the procedures in § 63.309(d)(1) for facilities with production capacity greater than 3 million tpy coke; and
    (ii) 3.8 percent leaking coke oven doors on each tall by-product coke oven battery and for each by-product coke oven battery owned or operated by a foundry coke producer, as determined by the procedures in § 63.309(d)(1) for facilities with production capacity less than 3 million tpy coke or 3.2 percent leaking coke oven doors for each not tall by-product coke oven battery and for each by-product coke oven battery owned or operated by a foundry coke producer, as determined by the procedures in § 63.309(d)(1) for facilities with production capacity less than 3 million tpy coke.
  • (1) The certified observer shall conduct one run each day to observe and record visible emissions from each coke oven door (except for doors covered by an alternative standard under § 63.305), topside port lid, and offtake system on each coke oven battery. The certified observer also shall conduct five runs to observe and record the seconds of visible emissions per charge for five consecutive charges from each coke oven battery. The observer may perform additional runs as needed to obtain and record a visible emissions value (or set of values) for an emission point that is valid under Method 303 or Method 303A in appendix A to this part. Observations from fewer than five consecutive charges shall constitute a valid set of charging observations only in accordance with the procedures and conditions specified in sections 3.8 and 3.9 of Method 303 in appendix A to this part.
  • (2) For an approved alternative emission limitation according to § 63.305;
    (i) Monitoring records for parameter(s) that indicate the exhaust flow rate is maintained;
    (ii) If applicable under § 63.305(f)(4)(i);
    (A) Beginning on January 2, 2025, if you failed to meet an applicable standard, the compliance report must include whether the failure occurred during a period of startup, shutdown, or malfunction of process, air pollution control, and monitoring equipment; the start date, start time, and duration (in hours) of each failure; and any corrective actions taken to return the affected unit to its normal or usual manner of operation. For each failure, beginning on January 2, 2025, the compliance report must include a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, and a description of the method used to estimate the emissions; and
    (B) Records that demonstrate the continuous opacity monitoring system meets the requirements of Performance Specification 1 in appendix B to part 60 of this chapter and the operation and maintenance requirements in part 52 of this chapter; and
    (iii) Records of quarterly visual inspections as specified in § 63.305(f)(5), including the time and date a defect is detected and repaired.
  • (1) Approval of alternatives to the requirements in §§ 63.300 and 63.302 through 63.308 (except the authorities in 63.306(a)(2) and (d)).

Citations to §63.305(f)

Citations to §63.305(f)(4)(i)

  • (ii) If applicable under § 63.305(f)(4)(i);
    (A) Beginning on January 2, 2025, if you failed to meet an applicable standard, the compliance report must include whether the failure occurred during a period of startup, shutdown, or malfunction of process, air pollution control, and monitoring equipment; the start date, start time, and duration (in hours) of each failure; and any corrective actions taken to return the affected unit to its normal or usual manner of operation. For each failure, beginning on January 2, 2025, the compliance report must include a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, and a description of the method used to estimate the emissions; and
    (B) Records that demonstrate the continuous opacity monitoring system meets the requirements of Performance Specification 1 in appendix B to part 60 of this chapter and the operation and maintenance requirements in part 52 of this chapter; and

Citations to §63.305(f)(5)