§63.302. Standards for by-product coke oven batteries.

40 C.F.R. § 63.302

(a)
Except as provided in § 63.304 or § 63.305, on and after the dates specified in this paragraph, no owner or operator shall cause to be discharged or allow to be discharged to the atmosphere, coke oven emissions from each affected existing by-product coke oven battery that exceed any of the following emission limitations or requirements:
(1)
On and after December 31, 1995;
(i)
For coke oven doors;
(A)
6.0 percent leaking coke oven doors for each tall by-product coke oven battery, as determined according to the procedures in § 63.309(d)(1); and
(B)
5.5 percent leaking coke oven doors for each short by-product coke oven battery, as determined according to the procedures in § 63.309(d)(1);
(ii)
0.6 percent leaking topside port lids, as determined by the procedures in § 63.309(d)(1);
(iii)
3.0 percent leaking offtake system(s), as determined by the procedures in § 63.309(d)(1); and
(iv)
12 seconds of visible emissions per charge, as determined by the procedures in § 63.309(d)(2).
(2)
On and after January 1, 2003, unless the Administrator promulgates more stringent limits pursuant to section 112(f) of the Act;
(i)
5.5 percent leaking coke oven doors for each tall by-product coke oven battery, as determined by the procedures in § 63.309(d)(1); and
(ii)
5.0 percent leaking coke oven doors for each short by-product coke oven battery, as determined by the procedures in § 63.309(d)(1).
(3)
On and after July 14, 2005;
(i)
4.0 percent leaking coke oven doors for each tall by-product coke oven battery and for each by-product coke oven battery owned or operated by a foundry coke producer, as determined by the procedures in § 63.309(d)(1);
(ii)
3.3 percent leaking coke oven doors for each by-product coke oven battery not subject to the emission limitation in paragraph (a)(3)(i) of this section, as determined by the procedures in § 63.309(d)(1);
(iii)
0.4 percent leaking topside port lids, as determined by the procedures in § 63.309(d)(1);
(iv)
2.5 percent leaking offtake system(s), as determined by the procedures in § 63.309(d)(1); and
(v)
12 seconds of visible emissions per charge, as determined by the procedures in § 63.309(d)(2).
(4)
On and after July 7, 2025—
(i)
for facilities with coke production capacity more than or equal to 3 million tpy coke and as determined by the procedures in § 63.309(d)(1), 2.5 percent leaking coke oven doors for each tall by-product coke oven battery and 1.7 percent leaking coke oven doors for each not tall by-product coke oven battery;
(ii)
for facilities with coke production capacity less than 3 million tpy coke and as determined by the procedures in § 63.309(d)(1), 3.8 percent leaking coke oven doors for each tall by-product coke oven battery and 3.2 percent leaking coke oven doors for each not tall by-product coke oven battery;
(iii)
0.32 percent leaking topside port lids, as determined by the procedures in § 63.309(d)(1);
(iv)
2.1 percent leaking offtake system(s), as determined by the procedures in § 63.309(d)(1); and
(v)
12 seconds of visible emissions per charge, as determined by the procedures in § 63.309(d)(2).
(b)
Except as provided in paragraph (c) of this section, no owner or operator shall cause to be discharged or allow to be discharged to the atmosphere, coke oven emissions from a by-product coke oven battery subject to the applicability requirements in § 63.300(b) that exceed any of the following emission limitations:
(1)
0.0 percent leaking coke oven doors, as determined by the procedures in § 63.309(d)(1);
(2)
0.0 percent leaking topside port lids, as determined by the procedures in § 63.309(d)(1);
(3)
0.0 percent leaking offtake system(s), as determined by the procedures in § 63.309(d)(1); and
(4)
34 seconds of visible emissions per charge, as determined by the procedures in § 63.309(d)(2).
(c)
The emission limitations in paragraph (b) of this section do not apply to the owner or operator of a by-product coke oven battery that utilizes a new recovery technology, including but not limited to larger size ovens, operation under negative pressure, and processes with emission points different from those regulated under this subpart. An owner or operator constructing a new by-product coke oven battery or reconstructing an existing by-product recovery battery that utilizes a new recovery technology shall:
(1)
Notify the Administrator of the intention to do so, as required in § 63.311(c); and
(2)
Submit, for the determination under section 112(g)(2)(B) of the Act, and as part of the application for permission to construct or reconstruct, all information and data requested by the Administrator for the determination of applicable emission limitations and requirements for that by-product coke oven battery.
(d)
Emission limitations and requirements applied to each coke oven battery utilizing a new recovery technology shall be less than the following emission limitations or shall result in an overall annual emissions rate for coke oven emissions for the battery that is lower than that obtained by the following emission limitations on and after July 7, 2025:
(1)
Coke oven doors on by-product coke oven batteries at facilities with production capacity more than or equal to 3 million tpy coke:
(i)
2.5 percent leaking coke oven doors on tall by-product coke oven batteries, as defined in § 63.301 and as determined by the procedures in § 63.309(d)(1); and
(ii)
1.7 percent leaking coke oven doors for each not tall by-product coke oven battery, as determined by the procedures in § 63.309(d)(1);
(2)
For coke oven doors on by-product coke oven batteries at facilities with coke production capacity less than 3 million tpy coke:
(i)
3.8 percent leaking coke oven doors on tall by-product coke oven batteries, as determined by the procedures in § 63.309(d)(1); and
(ii)
3.2 percent leaking coke oven doors on not tall by-product coke oven batteries, as determined by the procedures in § 63.309(d)(1);
(3)
2.1 percent leaking offtake system(s), as determined by the procedures in § 63.309(d)(1);
(4)
0.32 percent leaking topside port lids, as determined by the procedures in § 63.309(d)(1); and
(5)
12 seconds of visible emissions per charge, as determined by the procedures in § 63.309(d)(2).
Notes, amendments, and revision history

Amendments

[58 FR 57911, Oct. 27, 1993, as amended at 70 FR 20013, Apr. 15, 2005; 89 FR 55733, July 5, 2024; 90 FR 30004, July 8, 2025; 90 FR 56012, Dec. 5, 2025]

Source

Source: 58 FR 57911, Oct. 27, 1993, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.

Source

Source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.

Amendments

[58 FR 57911, Oct. 27, 1993, as amended at 70 FR 20013, Apr. 15, 2005; 89 FR 55733, July 5, 2024; 90 FR 30004, July 8, 2025; 90 FR 56012, Dec. 5, 2025]

§63.303. Standards for nonrecovery coke oven batteries.

40 C.F.R. § 63.303

(a)
Except as provided in § 63.304, on and after December 31, 1995, no owner or operator shall cause to be discharged or allow to be discharged to the atmosphere coke oven emissions from each affected existing nonrecovery coke oven battery that exceed any of the following emission limitations or requirements:
(1)
For coke oven doors and common tunnels;
(i)
0.0 percent leaking coke oven doors, as determined by the procedures in § 63.309(d)(1); and
(ii)
The owner or operator shall monitor and record, once per day for each day of operation, the pressure in each oven or in each common battery tunnel during pushing, charging, and coking to ensure that the ovens are operated under a negative pressure.
(iii)
The date for compliance with paragraphs (a)(1)(i) and (ii) of this section is on and after July 7, 2025.
(2)
For charging operations, the owner or operator shall implement, for each day of operation, the work practices specified in § 63.306(b)(6) and record the performance of the work practices as required in § 63.306(b)(7).
(b)
No owner or operator shall cause to be discharged or allow to be discharged to the atmosphere coke oven emissions from each affected new nonrecovery coke oven battery subject to the applicability requirements in § 63.300(b) that exceed any of the following emission limitations or requirements:
(1)
For coke oven doors and common tunnels;
(i)
0.0 percent leaking coke oven doors, as determined by the procedures in § 63.309(d)(1); and
(ii)
The owner or operator shall monitor and record, once per day for each day of operation, the pressure in each oven or in each common battery tunnel during pushing, charging, and coking to ensure that the ovens are operated under a negative pressure.
(iii)
The date for compliance with paragraphs (b)(1)(i) and (ii) of this section is on and after July 7, 2025, or upon initial startup, whichever is later.
(2)
For charging operations, the owner or operator shall install, operate, and maintain an emission control system for the capture and collection of emissions in a manner consistent with good air pollution control practices for minimizing emissions from the charging operation;
(3)
For charging operations, the owner or operator shall implement, for each day of operation, the work practices specified in § 63.306(b)(6) and record the performance of the work practices as required in § 63.306(b)(7).
(4)
0.0 percent leaking topside port lids, as determined by the procedures in § 63.309(d)(1) (if applicable to the new nonrecovery coke oven battery); and
(5)
0.0 percent leaking offtake system(s), as determined by the procedures in § 63.309(d)(1) (if applicable to the new nonrecovery coke oven battery).
(c)
Except as provided in § 63.304(a), (b), and (d), the owner or operator of any nonrecovery coke oven battery shall meet the work practice standards in paragraphs (c)(1) and (2) of this section.
(1)
The owner or operator shall observe each coke oven door after charging and record the oven number of any door from which visible emissions occur. Emissions from coal spilled during charging or from material trapped within the seal area of the door are not considered to be a door leak if the owner or operator demonstrates that the oven is under negative pressure, and that no emissions are visible from the top of the door or from dampers on the door.
(2)
Except as provided in paragraphs (c)(2)(i) and (ii) of this section, if a coke oven door leak is observed at any time during the coking cycle, the owner or operator shall take corrective action and stop the leak within 15 minutes from the time the leak is first observed. No additional leaks are allowed from doors on that oven for the remainder of that oven's coking cycle.
(i)
Except as provided in paragraph (c)(2)(ii) of this section, the owner or operator may take corrective action and stop the leak within 45 minutes (instead of 15 minutes) from the time the leak is first observed for a maximum of two times per battery in any semiannual reporting period.
(ii)
If a worker must enter a cokeside shed to stop a leaking door under the cokeside shed, the owner or operator shall take corrective action and stop the door leak within 45 minutes (instead of 15 minutes) from the time the leak is first observed. The evacuation system and control device for the cokeside shed must be operated at all times there is a leaking door under the cokeside shed.
(d)
The owner or operator of a new nonrecovery coke oven battery shall meet the emission limitations and work practice standards in paragraphs (d)(1) through (4) of this section.
(1)
The owner or operator shall not discharge or cause to be discharged to the atmosphere from charging operations any fugitive emissions that exhibit an opacity greater than 20 percent, as determined by the procedures in § 63.309(j).
(2)
The owner or operator shall not discharge or cause to be discharged to the atmosphere any emissions of particulate matter (PM) from a charging emissions control device that exceed 0.0081 pounds per ton (lbs/ton) of dry coal charged, as determined by the procedures in § 63.309(k).
(3)
The owner or operator shall observe the exhaust stack of each charging emissions control device at least once each day of operation during charging to determine if visible emissions are present and shall record the results of each daily observation or the reason why conditions did not permit a daily observation. If any visible emissions are observed, the owner or operator must:
(i)
Take corrective action to eliminate the presence of visible emissions;
(ii)
Record the cause of the problem creating the visible emissions and the corrective action taken;
(iii)
Conduct visible emission observations according to the procedures in § 63.309(m) within 24 hours after detecting the visible emissions; and
(iv)
Report any 6-minute average, as determined according to the procedures in § 63.309(m), that exceeds 10 percent opacity as a deviation in the semiannual compliance report required by § 63.311(d).
(4)
The owner or operator shall develop and implement written procedures for adjusting the oven uptake damper to maximize oven draft during charging and for monitoring the oven damper setting during each charge to ensure that the damper is fully open.
Notes, amendments, and revision history

Amendments

[58 FR 57911, Oct. 27, 1993, as amended at 70 FR 20013, Apr. 15, 2005; 89 FR 55733, July 5, 2024; 90 FR 30004, July 8, 2025; 90 FR 56012, Dec. 5, 2025]

Source

Source: 58 FR 57911, Oct. 27, 1993, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.

Source

Source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.

Amendments

[58 FR 57911, Oct. 27, 1993, as amended at 70 FR 20013, Apr. 15, 2005; 89 FR 55733, July 5, 2024; 90 FR 30004, July 8, 2025; 90 FR 56012, Dec. 5, 2025]

§63.304. Standards for compliance date extension.

40 C.F.R. § 63.304

(a)
An owner or operator of an existing coke oven battery (including a cold-idle coke oven battery), a padup rebuild, or a brownfield coke oven battery, may elect an extension of the compliance date for emission limits to be promulgated pursuant to section 112(f) of the Act in accordance with section 112(i)(8). To receive an extension of the compliance date from January 1, 2003, until January 1, 2020, the owner or operator shall notify the Administrator as described in § 63.311(c) that the battery will comply with the emission limitations and requirements in this section in lieu of the applicable emission limitations in § 63.302 or 63.303.
(b)
Except as provided in paragraphs (b)(4), (b)(5), and (b)(7) of this section and in § 63.305, on and after the dates specified in this paragraph, no owner or operator shall cause to be discharged or allow to be discharged to the atmosphere coke oven emissions from a by-product coke oven battery that exceed any of the following emission limitations:
(1)
On and after November 15, 1993;
(i)
7.0 percent leaking coke oven doors, as determined by the procedures in § 63.309(d)(1);
(ii)
0.83 percent leaking topside port lids, as determined by the procedures in § 63.309(d)(1);
(iii)
4.2 percent leaking offtake system(s), as determined by the procedures in § 63.309(d)(1); and
(iv)
12 seconds of visible emissions per charge, as determined by the procedures in § 63.309(d)(2).
(2)
On and after January 1, 1998;
(i)
For coke oven doors—
(A)
4.3 percent leaking coke oven doors for each tall by-product coke oven battery and for each by-product coke oven battery owned or operated by a foundry coke producer, as determined by the procedures in § 63.309(d)(1); and
(B)
3.8 percent leaking coke oven doors on each by-product coke oven battery not subject to the emission limitation in paragraph (b)(2)(i)(A) of this section, as determined by the procedures in § 63.309(d)(1);
(ii)
0.4 percent leaking topside port lids, as determined by the procedures in § 63.309(d)(1);
(iii)
2.5 percent leaking offtake system(s), as determined by the procedures in § 63.309(d)(1); and
(iv)
12 seconds of visible emissions per charge, as determined by the procedures in § 63.309(d)(2).
(3)
On and after January 1, 2010, unless the Administrator promulgates more stringent limits pursuant to section 112(i)(8)(C) of the Act;
(i)
4.0 percent leaking coke oven doors on each tall by-product coke oven battery and for each by-product coke oven battery owned or operated by a foundry coke producer, as determined by the procedures in § 63.309(d)(1); and
(ii)
3.3 percent leaking coke oven doors for each by-product coke oven battery not subject to the emission limitation in paragraph (b)(3)(i) of this section, as determined by the procedures in § 63.309(d)(1).
(4)
No owner or operator shall cause to be discharged or allow to be discharged to the atmosphere coke oven emissions from a brownfield or padup rebuild by-product coke oven battery, other than those specified in paragraph (b)(4)(v) of this section, that exceed any of the following emission limitations:
(i)
For coke oven doors;
(A)
4.0 percent leaking coke oven doors for each tall by-product coke oven battery, as determined by the procedures in § 63.309(d)(1); and
(B)
3.3 percent leaking coke oven doors on each short by-product coke oven battery, as determined by the procedures in § 63.309(d)(1);
(ii)
0.4 percent leaking topside port lids, as determined by the procedures in § 63.309(d)(1);
(iii)
2.5 percent leaking offtake system(s), as determined by the procedures in § 63.309(d)(1); and
(iv)
12 seconds of visible emissions per charge, as determined by the procedures in § 63.309(d)(2).
(v)
The requirements of paragraph (b)(4) of this section shall not apply and the requirements of paragraphs (b)(1), (b)(2), and (b)(3) of this section do apply to the following brownfield or padup rebuild coke oven batteries:
(A)
Bethlehem Steel-Burns Harbor, Battery No. 2;
(B)
National Steel-Great Lakes, Battery No. 4; and
(C)
Koppers-Woodward, Battery No. 3.
(vi)
To retain the exclusion provided in paragraph (b)(4)(v) of this section, a coke oven battery specified in paragraph (b)(4)(v) of this section shall commence construction not later than July 1, 1996, or 1 year after obtaining a construction permit, whichever is earlier.
(5)
The owner or operator of a cold-idle coke oven battery that shut down on or after November 15, 1990, shall comply with the following emission limitations:
(i)
For a brownfield coke oven battery or a padup rebuild coke oven battery, coke oven emissions shall not exceed the emission limitations in paragraph (b)(4) of this section; and
(ii)
For a cold-idle battery other than a brownfield or padup rebuild coke oven battery, coke oven emissions shall not exceed the emission limitations in paragraphs (b)(1) through (b)(3) of this section.
(6)
The owner or operator of a cold-idle coke oven battery that shut down prior to November 15, 1990, shall submit a written request to the Administrator to include the battery in the design capacity of a coke plant as of November 15, 1990. A copy of the request shall also be sent to Director, Office of Air Quality Planning and Standards, U.S. Environmental Protection Agency, Research Triangle Park, NC 27711. The Administrator will review and approve or disapprove a request according to the following procedures:
(i)
Requests will be reviewed for completeness in the order received. A complete request shall include:
(A)
Battery identification;
(B)
Design information, including the design capacity and number and size of ovens; and
(C)
A brief description of the owner or operator's plans for the cold-idle battery, including a statement whether construction of a padup rebuild or a brownfield coke oven battery is contemplated.
(ii)
A complete request shall be approved if the design capacity of the battery and the design capacity of all previous approvals does not exceed the capacity limit in paragraph (b)(6)(i)(C) of this section.
(iii)
The total nationwide coke capacity of coke oven batteries that receive approval under paragraph (b)(6) of this section shall not exceed 2.7 million Mg/yr (3.0 million ton/yr).
(iv)
If a construction permit is required, an approval shall lapse if a construction permit is not issued within 3 years of the approval date, or if the construction permit lapses.
(v)
If a construction permit is not required, an approval will lapse if the battery is not restarted within 2 years of the approval date.
(7)
The owner or operator of a by-product coke oven battery with fewer than 30 ovens may elect to comply with an emission limitation of 2 or fewer leaking coke oven doors, as determined by the procedures in § 63.309(d)(4), as an alternative to the emission limitation for coke oven doors in paragraphs (b)(2)(i), (b)(3) (i) through (ii), (b)(4)(i), (b)(5), and (b)(6) of this section.
(8)
On and after July 7, 2025—
(i)
2.5 percent leaking coke oven doors on each tall by-product coke oven battery and for each by-product coke oven battery owned or operated by a foundry coke producer, as determined by the procedures in § 63.309(d)(1) for facilities with production capacity greater than 3 million tpy coke or 1.7 percent leaking coke oven doors for each not tall by-product coke oven battery and for each by-product coke oven battery owned or operated by a foundry coke producer, as determined by the procedures in § 63.309(d)(1) for facilities with production capacity greater than 3 million tpy coke; and
(ii)
3.8 percent leaking coke oven doors on each tall by-product coke oven battery and for each by-product coke oven battery owned or operated by a foundry coke producer, as determined by the procedures in § 63.309(d)(1) for facilities with production capacity less than 3 million tpy coke or 3.2 percent leaking coke oven doors for each not tall by-product coke oven battery and for each by-product coke oven battery owned or operated by a foundry coke producer, as determined by the procedures in § 63.309(d)(1) for facilities with production capacity less than 3 million tpy coke.
(c)
On and after November 15, 1993, no owner or operator shall cause to be discharged or allow to be discharged to the atmosphere coke oven emissions from an existing nonrecovery coke oven battery that exceed any of the emission limitations or requirements in § 63.303(a).
(d)
Each owner or operator of an existing coke oven battery qualifying for a compliance date extension pursuant to this section shall make available, no later than January 1, 2000, to the surrounding communities the results of any risk assessment performed by the Administrator to determine the appropriate level of any emission standard established by the Administrator according to section 112(f) of the Act.
Notes, amendments, and revision history

Amendments

[58 FR 57911, Oct. 27, 1993, as amended at 65 FR 62215, Oct. 17, 2000; 89 FR 55733, July 5, 2024; 90 FR 30004, July 8, 2025; 90 FR 56012, Dec. 5, 2025]

Source

Source: 58 FR 57911, Oct. 27, 1993, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.

Source

Source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.

Amendments

[58 FR 57911, Oct. 27, 1993, as amended at 65 FR 62215, Oct. 17, 2000; 89 FR 55733, July 5, 2024; 90 FR 30004, July 8, 2025; 90 FR 56012, Dec. 5, 2025]

§63.305. Alternative standards for coke oven doors equipped with sheds.

40 C.F.R. § 63.305

(a)
The owner or operator of a new or existing coke oven battery equipped with a shed for the capture of coke oven emissions from coke oven doors and an emission control device for the collection of the emissions may comply with an alternative to the applicable visible emission limitations for coke oven doors in §§ 63.302 and 63.304 according to the procedures and requirements in this section.
(b)
To qualify for approval of an alternative standard, the owner or operator shall submit to the Administrator a test plan for the measurement of emissions. A copy of the request shall also be sent to the Director, Office of Air Quality Planning and Standards, U.S. Environmental Protection Agency, Research Triangle Park, NC 27711. The plan shall describe the procedures to be used for the measurement of particulate matter; the parameters to be measured that affect the shed exhaust rate (e.g., damper settings, fan power) and the procedures for measuring such parameters; and if applicable under paragraph (c)(5)(ii) of this section, the procedures to be used for the measurement of benzene soluble organics, benzene, toluene, and xylene emitted from the control device for the shed. The owner or operator shall notify the Administrator at least 30 days before any performance test is conducted.
(c)
A complete test plan is deemed approved if no disapproval is received within 60 days of the submittal to the Administrator. After approval of the test plan, the owner or operator shall;
(1)
Determine the efficiency of the control device for removal of particulate matter by conducting measurements at the inlet and the outlet of the emission control device using Method 5 in appendix A to part 60 of this chapter, with the filter box operated at ambient temperature and in a manner to avoid condensation, with a backup filter;
(2)
Measure the visible emissions from coke oven doors that escape capture by the shed using Method 22 in appendix A to part 60 of this chapter. For the purpose of approval of an alternative standard, no visible emissions may escape capture from the shed.
(i)
Visible emission observations shall be taken during conditions representative of normal operations, except that pushing shall be suspended and pushing emissions shall have cleared the shed; and
(ii)
Method 22 observations shall be performed by an observer certified according to the requirements of Method 9 in appendix A to part 60 of this chapter. The observer shall allow pushing emissions to be evacuated (typically 1 to 2 minutes) before making observations;
(3)
Measure the opacity of emissions from the control device using Method 9 in appendix A to part 60 of this chapter during conditions representative of normal operations, including pushing; and
(i)
If the control device has multiple stacks, the owner or operator shall use an evaluation based on visible emissions and opacity to select the stack with the highest opacity for testing under this section;
(ii)
The highest opacity, expressed as a 6-minute average, shall be used as the opacity standard for the control device.
(iii)
Alternatively, ASTM D7520-16, (incorporated by reference, see § 63.14) may be used with the following conditions:
(A)
During the digital camera opacity technique (DCOT) certification procedure outlined in section 9.2 of ASTM D7520-16 (incorporated by reference, see § 63.14), the owner or operator or the DCOT vendor must present the plumes in front of various backgrounds of color and contrast representing conditions anticipated during field use such as blue sky, trees, and mixed backgrounds (clouds and/or a sparse tree stand).
(B)
The owner or operator must also have standard operating procedures in place including daily or other frequency quality checks to ensure the equipment is within manufacturing specifications as outlined in section 8.1 of ASTM D7520-16 (incorporated by reference, see § 63.14).
(C)
The owner or operator must follow the recordkeeping procedures outlined in § 63.10(b)(1) for the DCOT certification, compliance report, data sheets, and all raw unaltered JPEGs used for opacity and certification determination.
(D)
The owner or operator or the DCOT vendor must have a minimum of four independent technology users apply the software to determine the visible opacity of the 300 certification plumes. For each set of 25 plumes, the user may not exceed 15 percent opacity of anyone reading and the average error must not exceed 7.5 percent opacity.
(E)
Use of this approved alternative does not provide or imply a certification or validation of any vendor's hardware or software. The onus to maintain and verify the certification and/or training of the DCOT camera, software, and operator in accordance with ASTM D7520-16 (incorporated by reference, see § 63.14) and these requirements is on the facility, DCOT operator, and DCOT vendor.
(4)
Thoroughly inspect all compartments of each air cleaning device prior to the performance test for proper operation and for changes that signal the potential for malfunction, including the presence of tears, holes, and abrasions in filter bags; damaged seals; and for dust deposits on the clean side of bags; and
(5)
Determine the allowable percent leaking doors under the shed using either of the following procedures—
(i)
Calculate the allowable percent leaking doors using the following equation—
(ii)
Calculate the allowable percent leaking doors using the following procedures—
(A)
Measure the total emission rate of benzene, toluene, and xylene exiting the control device using Method 18 in appendix A-6 to 40 CFR part 60 and the emission rate of benzene soluble organics entering the control device as described in the test plan submitted pursuant to paragraph (b) of this section. The voluntary consensus standard ASTM D6420-18, (incorporated by reference, see § 63.14) is an acceptable alternative to EPA Method 18 for benzene, toluene, and xylene; or
(B)
Measure benzene, toluene, xylene, and benzene soluble organics in the gas in the collector main as described in the test plan submitted pursuant to paragraph (b) of this section; and
(C)
Calculate the ratio (R) of benzene, toluene, and xylene to benzene soluble organics for the gas in the collector main, or as the sum of the outlet emission rates of benzene, toluene, and xylene, divided by the emission rate of benzene soluble organics as measured at the inlet to the control device; and
(D)
Calculate the allowable percent leaking doors limit under the shed using the following equation—
(iii)
If the allowable percent leaking coke oven doors is calculated to exceed 15 percent leaking coke oven doors under paragraphs (c)(5)(i) or (c)(5)(ii) of this section, the owner or operator shall use 15 percent leaking coke oven doors for the purposes of this section.
(6)
Monitor the parameters that affect the shed exhaust flow rate.
(7)
The owner or operator may request alternative sampling procedures to those specified in paragraph (c)(5)(ii) (A) and (B) of this section by submitting details on the procedures and the rationale for their use to the Administrator. Alternative procedures shall not be used without approval from the Administrator.
(8)
The owner or operator shall inform the Administrator of the schedule for conducting testing under the approved test plan and give the Administrator the opportunity to observe the tests.
(d)
After calculating the alternative standard for allowable percent leaking coke oven doors, the owner or operator shall submit the following information to the Administrator:
(1)
Identity of the coke oven battery;
(2)
Visible emission limitation(s) for percent leaking doors currently applicable to the coke oven battery under this subpart and known future limitations for percent leaking coke oven doors;
(3)
A written report including—
(i)
Appropriate measurements and calculations used to derive the allowable percent leaking coke oven doors requested as the alternative standard;
(ii)
Appropriate visible emission observations for the shed and opacity observations for the control device for the shed, including an alternative opacity standard, if applicable, as described in paragraph (c)(3) of this section based on the highest 6-minute average; and
(iii)
The parameter or parameters (e.g., fan power, damper position, or other) to be monitored and recorded to demonstrate that the exhaust flow rate measured during the test required by paragraph (c)(1) of this section is maintained, and the monitoring plan for such parameter(s).
(iv)
If the application is for a new shed, one of the following demonstrations:
(A)
A demonstration, using modeling procedures acceptable to the Administrator, that the expected concentrations of particulate emissions (including benzene soluble organics) under the shed at the bench level, when the proposed alternative standard was being met, would not exceed the expected concentrations of particulate emissions (including benzene soluble organics) if the shed were not present, the regulations under this subpart were met, and the battery was in compliance with federally enforceable limitations on pushing emissions; or
(B)
A demonstration that the shed (including the evacuation system) has been designed in accordance with generally accepted engineering principles for the effective capture and control of particulate emissions (including benzene soluble organics) as measured at the shed's perimeter, its control device, and at the bench level.
(e)
The Administrator will review the information and data submitted according to paragraph (d) of this section and may request additional information and data within 60 days of receipt of a complete request.
(1)
Except for applications subject to paragraph (e)(3) of this section, the Administrator shall approve or disapprove an alternative standard as expeditiously as practicable. The Administrator shall approve an alternative standard, unless the Administrator determines that the approved test plan has not been followed, or any required calculations are incorrect, or any demonstration required under paragraph (d)(3)(iv) of this section does not satisfy the applicable criteria under that paragraph. If the alternative standard is disapproved, the Administrator will issue a written notification to the owner or operator within the 60-day period.
(2)
The owner or operator shall comply with the applicable visible emission limitation for coke oven doors and all other requirements in this subpart prior to approval of an alternative standard. The owner or operator may apply for an alternative standard at any time after December 4, 1992.
(3)
An application for an alternative standard to the standard in § 63.304(b)(1)(i) for any shed that is not a new shed that is filed on or before June 15, 1993, is deemed approved if a notice of disapproval has not been received 60 days after submission of a complete request. An approval under paragraph (e)(3) of this section shall be valid for a period of 1 year.
(4)
Notwithstanding the provisions of paragraph (e) of this section, no alternative standard shall be approved that exceeds 15 percent leaking coke oven doors (yard equivalent).
(f)
After approval of an alternative standard, the owner or operator shall comply with the following requirements:
(1)
The owner or operator shall not discharge or allow to be discharged to the atmosphere coke oven emissions from coke oven doors under sheds that exceed an approved alternative standard for percent leaking coke oven doors under sheds.
(i)
All visible emission observations for compliance determinations shall be performed by a certified observer.
(ii)
Compliance with the alternative standard for doors shall be determined by a weekly performance test conducted according to the procedures and requirements in § 63.309(d)(5) and Method 303 in appendix A to this part.
(iii)
If the visible emission limitation is achieved for 12 consecutive observations, compliance shall be determined by monthly rather than weekly performance tests. If any exceedance occurs during a performance test, weekly performance tests shall be resumed.
(iv)
Observations taken at times other than those specified in paragraphs (f)(1)(ii) and (f)(1)(iii) of this section shall be subject to the provisions of § 63.309(f).
(2)
The certified observer shall monitor the visible coke oven emissions escaping capture by the shed on a weekly basis. The provision in paragraph (f)(6) of this section is applicable if visible coke oven emissions are observed during periods when pushing emissions have cleared the shed.
(3)
The owner or operator shall not discharge or allow to be discharged to the atmosphere any visible emissions from the shed's control device exhibiting more than 0 percent opacity unless an alternative limit has been approved under paragraph (e) of this section.
(4)
The opacity of emissions from the control device for the shed shall be monitored in accordance with the requirements of either paragraph (f)(4)(i) or (ii) of this section, at the election of the owner or operator.
(i)
The owner or operator shall install, operate, and maintain a continuous opacity monitor, and record the output of the system, for the measurement of the opacity of emissions discharged from the emission control system per §§ 63.300(e) and 63.8(d)(1) and (2).
(A)
Each continuous opacity monitoring system shall meet the requirements of Performance Specification 1 in appendix B to 40 CFR part 60; and
(B)
Each continuous opacity monitoring system shall be operated, calibrated, and maintained according to the procedures and requirements specified in 40 CFR part 52; and
(C)
The owner or operator shall keep the written procedures required by § 63.8(d)(1) and (2) on record for the life of the affected source or until the affected source is no longer subject to the provisions of this part, to be made available for inspection, upon request, by the Administrator. If the performance evaluation plan is revised, the owner or operator shall keep previous (i.e., superseded) versions of the performance evaluation plan on record to be made available for inspection, upon request, by the Administrator, for a period of 5 years after each revision to the plan. The program of corrective action should be included in the plan required under § 63.8(d)(2); or
(ii)
A certified observer shall monitor and record at least once each day during daylight hours, opacity observations for the control device for the shed using Method 9 in appendix A-4 to 40 CFR part 60. Alternatively, ASTM D7520-16, (incorporated by reference, see § 63.14) may be used with the following conditions:
(A)
During the digital camera opacity technique (DCOT) certification procedure outlined in section 9.2 of ASTM D7520-16 (incorporated by reference, see § 63.14), the owner or operator or the DCOT vendor must present the plumes in front of various backgrounds of color and contrast representing conditions anticipated during field use such as blue sky, trees, and mixed backgrounds (clouds and/or a sparse tree stand).
(B)
The owner or operator must also have standard operating procedures in place including daily or other frequency quality checks to ensure the equipment is within manufacturing specifications as outlined in section 8.1 of ASTM D7520-16 (incorporated by reference, see § 63.14).
(C)
The owner or operator must follow the recordkeeping procedures outlined in § 63.10(b)(1) for the DCOT certification, compliance report, data sheets, and all raw unaltered JPEGs used for opacity and certification determination.
(D)
The owner or operator or the DCOT vendor must have a minimum of four independent technology users apply the software to determine the visible opacity of the 300 certification plumes. For each set of 25 plumes, the user may not exceed 15 percent opacity of anyone reading and the average error must not exceed 7.5 percent opacity.
(E)
Use of this approved alternative does not provide or imply a certification or validation of any vendor's hardware or software. The onus to maintain and verify the certification and/or training of the DCOT camera, software, and operator in accordance with ASTM D7520-16 (incorporated by reference, see § 63.14) and these requirements is on the facility, DCOT operator, and DCOT vendor.
(5)
The owner or operator shall visually inspect the structural integrity of the shed at least once a quarter for defects, such as deterioration of sheet metal (e.g., holes in the shed), that may allow the escape of visible emissions.
(i)
The owner or operator shall record the time and date a defect is first observed, the time and date the defect is corrected or repaired, and a brief description of repairs or corrective actions taken;
(ii)
The owner or operator shall temporarily repair the defect as soon as possible, but no later than 5 days after detection of the defect;
(iii)
Unless a major repair is required, the owner or operator shall perform a complete repair of the defect within 15 days of detection of the defect. If a major repair is required (e.g., replacement of large sections of the shed), the owner or operator shall submit a repair schedule to the enforcement agency.
(6)
If the no visible emission limit for the shed specified in paragraph (f)(2) of this section is exceeded, the Administrator may require another test for the shed according to the approved test plan as specified in paragraph (c) of this section. If the certified observer observes visible coke oven emissions from the shed, except during periods of pushing or when pushing emissions have not cleared the shed, the owner or operator shall check to ensure that the shed and control device are working properly.
(7)
The owner or operator shall monitor the parameter(s) affecting shed exhaust flow rate, and record data, in accordance with the approved monitoring plan for these parameters.
(8)
The owner or operator shall not operate the exhaust system of the shed at an exhaust flow rate lower than that measured during the test required under paragraph (c)(1) of this section, as indicated by the monitored parameters.
(g)
Each side of a battery subject to an alternative standard for doors under this section shall be treated separately for purposes of §§ 63.306(c) (plan implementation) and 63.306(d) (plan revisions) of this subpart. In making determinations under these provisions for the side of the battery subject to an alternative standard, the requirement that exceedances be independent shall not apply. During any period when work practices for doors for both sides of the battery are required to be implemented, § 63.306(a)(3) shall apply in the same manner as if the provisions of a plan for a single emissions point were required to be implemented. Exceedances of the alternative standard for percent leaking doors under a shed is the only provision in this section implicating implementation of work practice requirements.
(h)
Multiple exceedances of the visible emission limitation for door leaks and/or the provisions of an alternative standard under this section for door leaks at a battery on a single day shall be considered a single violation.
Notes, amendments, and revision history

Amendments

[58 FR 57911, Oct. 27, 1993, as amended at 89 FR 55734, July 5, 2024]

Source

Source: 58 FR 57911, Oct. 27, 1993, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.

Source

Source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.

Amendments

[58 FR 57911, Oct. 27, 1993, as amended at 89 FR 55734, July 5, 2024]

§63.306. Work practice standards.

40 C.F.R. § 63.306

(a)
Work practice plan. On or before November 15, 1993, each owner or operator shall prepare and submit a written emission control work practice plan for each coke oven battery. The plan shall be designed to achieve compliance with visible emission limitations for coke oven doors, topside port lids, offtake systems, and charging operations under this subpart, or, for a coke oven battery not subject to visible emission limitations under this subpart, other federally enforceable visible emission limitations for these emission points.
(1)
The work practice plan must address each of the topics specified in paragraph (b) of this section in sufficient detail and with sufficient specificity to allow the reviewing authority to evaluate the plan for completeness and enforceability.
(2)
The initial plan and any revisions shall be submitted to the Administrator or the delegated State, local, or Tribal authority. The Administrator (or delegated State, local, or Tribal authority) may require revisions to the initial plan only where the Administrator (or delegated State, local, or Tribal authority) finds either that the plan does not address each subject area listed in paragraph (b) of this section for each emission point subject to a visible emission standard under this subpart, or that the plan in unenforceable because it contains requirements that are unclear.
(3)
During any period of time that an owner or operator is required to implement the provisions of a plan for a particular emission point, the failure to implement one or more obligations under the plan and/or any recordkeeping requirement(s) under § 63.311(f)(4) for the emission point during a particular day is a single violation.
(b)
Plan components. The owner or operator shall organize the work practice plan to indicate clearly which parts of the plan pertain to each emission point subject to visible emission standards under this subpart. Each of the following provisions, at a minimum, shall be addressed in the plan:
(1)
An initial and refresher training program for all coke plant operating personnel with responsibilities that impact emissions, including contractors, in job requirements related to emission control and the requirements of this subpart, including work practice requirements. Contractors with responsibilities that impact emission control may be trained by the owner or operator or by qualified contractor personnel; however, the owner or operator shall ensure that the contractor training program complies with the requirements of this section. The training program in the plan must include:
(i)
A list, by job title, of all personnel that are required to be trained and the emission point(s) associated with each job title;
(ii)
An outline of the subjects to be covered in the initial and refresher training for each group of personnel;
(iii)
A description of the training method(s) that will be used (e.g., lecture, video tape);
(iv)
A statement of the duration of initial training and the duration and frequency of refresher training;
(v)
A description of the methods to be used at the completion of initial or refresher training to demonstrate and document successful completion of the initial and refresher training; and
(vi)
A description of the procedure to be used to document performance of plan requirements pertaining to daily operation of the coke oven battery and its emission control equipment, including a copy of the form to be used, if applicable, as required under the plan provisions implementing paragraph (b)(7) of this section.
(2)
Procedures for controlling emissions from coke oven doors on by-product coke oven batteries, including:
(i)
A program for the inspection, adjustment, repair, and replacement of coke oven doors and jambs, and any other equipment for controlling emissions from coke oven doors, including a defined frequency of inspections, the method to be used to evaluate conformance with operating specifications for each type of equipment, and the method to be used to audit the effectiveness of the inspection and repair program for preventing exceedances;
(ii)
Procedures for identifying leaks that indicate a failure of the emissions control equipment to function properly, including a clearly defined chain of command for communicating information on leaks and procedures for corrective action;
(iii)
Procedures for cleaning all sealing surfaces of each door and jamb, including identification of the equipment that will be used and a specified schedule or frequency for the cleaning of sealing surfaces;
(iv)
For batteries equipped with self-sealing doors, procedures for use of supplemental gasketing and luting materials, if the owner or operator elects to use such procedures as part of the program to prevent exceedances;
(v)
For batteries equipped with hand-luted doors, procedures for luting and reluting, as necessary to prevent exceedances;
(vi)
Procedures for maintaining an adequate inventory of the number of spare coke oven doors and jambs located onsite; and
(vii)
Procedures for monitoring and controlling collecting main back pressure, including corrective action if pressure control problems occur.
(3)
Procedures for controlling emissions from charging operations on by-product coke oven batteries, including:
(i)
Procedures for equipment inspection, including the frequency of inspections, and replacement or repair of equipment for controlling emissions from charging, the method to be used to evaluate conformance with operating specifications for each type of equipment, and the method to be used to audit the effectiveness of the inspection and repair program for preventing exceedances;
(ii)
Procedures for ensuring that the larry car hoppers are filled properly with coal;
(iii)
Procedures for the alignment of the larry car over the oven to be charged;
(iv)
Procedures for filling the oven (e.g., procedures for staged or sequential charging);
(v)
Procedures for ensuring that the coal is leveled properly in the oven; and
(vi)
Procedures and schedules for inspection and cleaning of offtake systems (including standpipes, standpipe caps, goosenecks, dampers, and mains), oven roofs, charging holes, topside port lids, the steam supply system, and liquor sprays.
(4)
Procedures for controlling emissions from topside port lids on by-product coke oven batteries, including:
(i)
Procedures for equipment inspection and replacement or repair of topside port lids and port lid mating and sealing surfaces, including the frequency of inspections, the method to be used to evaluate conformance with operating specifications for each type of equipment, and the method to be used to audit the effectiveness of the inspection and repair program for preventing exceedances; and
(ii)
Procedures for sealing topside port lids after charging, for identifying topside port lids that leak, and procedures for resealing.
(5)
Procedures for controlling emissions from offtake system(s) on by-product coke oven batteries, including:
(i)
Procedures for equipment inspection and replacement or repair of offtake system components, including the frequency of inspections, the method to be used to evaluate conformance with operating specifications for each type of equipment, and the method to be used to audit the effectiveness of the inspection and repair program for preventing exceedances;
(ii)
Procedures for identifying offtake system components that leak and procedures for sealing leaks that are detected; and
(iii)
Procedures for dampering off ovens prior to a push.
(6)
Procedures for controlling emissions from nonrecovery coke oven batteries including—
(i)
Procedures for charging coal into the oven, including any special procedures for minimizing air infiltration during charging, maximizing the draft on the oven, and for replacing the door promptly after charging;
(ii)
If applicable, procedures for the capture and control of charging emissions;
(iii)
Procedures for cleaning coke from the door sill area for both sides of the battery after completing the pushing operation and before replacing the coke oven door;
(iv)
Procedures for cleaning coal from the door sill area after charging and before replacing the push side door;
(v)
Procedures for filling gaps around the door perimeter with sealant material, if applicable; and
(vi)
Procedures for detecting and controlling emissions from smoldering coal.
(7)
Procedures for maintaining, for each emission point subject to visible emission limitations under this subpart, a daily record of the performance of plan requirements pertaining to the daily operation of the coke oven battery and its emission control equipment, including:
(i)
Procedures for recording the performance of such plan requirements; and
(ii)
Procedures for certifying the accuracy of such records by the owner or operator.
(8)
Any additional work practices or requirements specified by the Administrator according to paragraph (d) of this section.
(c)
Implementation of work practice plans. On and after November 15, 1993, the owner or operator of a coke oven battery shall implement the provisions of the coke oven emission control work practice plan according to the following requirements:
(1)
The owner or operator of a coke oven battery subject to visible emission limitations under this subpart on and after November 15, 1993, shall:
(i)
Implement the provisions of the work practice plan pertaining to a particular emission point following the second independent exceedance of the visible emission limitation for the emission point in any consecutive 6-month period, by no later than 3 days after receipt of written notification of the second such exceedance from the certified observer. For the purpose of this paragraph (c)(1)(i), the second exceedance is “independent” if either of the following criteria is met:
(A)
The second exceedance occurs 30 days or more after the first exceedance;
(B)
In the case of coke oven doors, topside port lids, and offtake systems, the 29-run average, calculated by excluding the highest value in the 30-day period, exceeds the value of the applicable emission limitation; or
(C)
In the case of charging emissions, the 29-day logarithmic average, calculated in accordance with Method 303 in appendix A to this part by excluding the valid daily set of observations in the 30-day period that had the highest arithmetic average, exceeds the value of the applicable emission limitation.
(ii)
Continue to implement such plan provisions until the visible emission limitation for the emission point is achieved for 90 consecutive days if work practice requirements are implemented pursuant to paragraph (c)(1)(i) of this section. After the visible emission limitation for a particular emission point is achieved for 90 consecutive days, any exceedances prior to the beginning of the 90 days are not included in making a determination under paragraph (c)(1)(i) of this section.
(2)
The owner or operator of a coke oven battery not subject to visible emission limitations under this subpart until December 31, 1995, shall:
(i)
Implement the provisions of the work practice plan pertaining to a particular emission point following the second exceedance in any consecutive 6-month period of a federally enforceable emission limitation for that emission point for coke oven doors, topside port lids, offtake systems, or charging operations by no later than 3 days after receipt of written notification from the applicable enforcement agency; and
(ii)
Continue to implement such plan provisions for 90 consecutive days after the most recent written notification from the enforcement agency of an exceedance of the visible emission limitation.
(d)
Revisions to plan. Revisions to the work practice emission control plan will be governed by the provisions in this paragraph (d) and in paragraph (a)(2) of this section. The reviewing authority is the Administrator or the delegated State, local, or Tribal authority.
(1)
The reviewing authority may request the owner or operator to review and revise as needed the work practice emission control plan for a particular emission point if there are 2 exceedances of the applicable visible emission limitation in the 6-month period that starts 30 days after the owner or operator is required to implement work practices under paragraph (c) of this section. In the case of a coke oven battery subject to visual emission limitations under this subpart, the second exceedance must be independent of the criteria in paragraph (c)(1)(i) of this section.
(2)
The reviewing authority may not request the owner or operator to review and revise the plan more than twice in any 12 consecutive month period for any particular emission point unless the reviewing authority disapproves the plan according to the provisions in paragraph (d)(6) of this section.
(3)
If the certified observer calculates that a second exceedance (or, if applicable, a second independent exceedance) has occurred, the certified observer shall notify the owner or operator. No later than 10 days after receipt of such a notification, the owner or operator shall notify the reviewing authority of any finding of whether work practices are related to the cause or the solution of the problem. The notification is subject to review by the reviewing authority according to the provisions in paragraph (d)(6) of this section.
(4)
The owner or operator shall submit a revised work practice plan within 60 days of notification from the reviewing authority under paragraph (d)(1) of this section, unless the reviewing authority grants an extension of time to submit the revised plan.
(5)
If the reviewing authority requires a plan revision, the reviewing authority may require the plan to address a subject area or areas in addition to those in paragraph (b) of this section, if the reviewing authority determines that without plan coverage of such an additional subject area, there is a reasonable probability of further exceedances of the visible emission limitation for the emission point for which a plan revision is required.
(6)
The reviewing authority may disapprove a plan revision required under paragraph (d) of this section if the reviewing authority determines that the revised plan is inadequate to prevent exceedances of the visible emission limitation under this subpart for the emission point for which a plan revision is required or, in the case of a battery not subject to visual emission limitations under this subpart, other federally enforceable emission limitations for such emission point. The reviewing authority may also disapprove the finding that may be submitted pursuant to paragraph (d)(3) of this section if the reviewing authority determines that a revised plan is needed to prevent exceedances of the applicable visible emission limitations.
Notes, amendments, and revision history

Amendments

[58 FR 57911, Oct. 27, 1993, as amended at 68 FR 37345, June 23, 2003]

Source

Source: 58 FR 57911, Oct. 27, 1993, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.

Source

Source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.

Amendments

[58 FR 57911, Oct. 27, 1993, as amended at 68 FR 37345, June 23, 2003]

§63.307. Standards for bypass/bleeder stacks.

40 C.F.R. § 63.307

(a)
(1)
Except as otherwise provided in this section, on or before March 31, 1994, the owner or operator of an existing by-product recovery battery for which a notification was not submitted under paragraph (e)(1) of this section shall install a bypass/bleeder stack flare system that is capable of controlling 120 percent of the normal gas flow generated by the battery, which shall thereafter be operated and maintained.
(2)
Coke oven emissions shall not be vented to the atmosphere through bypass/bleeder stacks, except through the flare system or the alternative control device as described in paragraph (d) of this section.
(3)
The owner or operator of a brownfield coke oven battery or a padup rebuild shall install such a flare system before startup, and shall properly operate and maintain the flare system.
(b)
Each flare installed pursuant to this section shall meet the following requirements:
(1)
Each flare shall be designed for a net heating value of 8.9 MJ/scm (240 Btu/scf) if a flare is steam-assisted or air-assisted, or a net value of 7.45 MJ/scm (200 Btu/scf) if the flare is non-assisted.
(2)
Each flare shall have either a continuously operable pilot flame or an electronic igniter that meets the requirements of paragraphs (b)(3) and (b)(4) of this section.
(3)
Each electronic igniter shall meet the following requirements:
(i)
Each flare shall be equipped with at least two igniter plugs with redundant igniter transformers;
(ii)
The ignition units shall be designed failsafe with respect to flame detection thermocouples (i.e., any flame detection thermocouples are used only to indicate the presence of a flame, are not interlocked with the ignition unit, and cannot deactivate the ignition system); and
(iii)
Integral battery backup shall be provided to maintain active ignition operation for a minimum of 15 minutes during a power failure.
(iv)
Each electronic igniter shall be operated to initiate ignition when the bleeder valve is not fully closed as indicated by an “OPEN” limit switch.
(4)
Each flare installed to meet the requirements of this paragraph (b) that does not have an electronic igniter shall be operated with a pilot flame present at all times as determined by § 63.309(h)(2).
(c)
Each flare installed to meet the requirements of this section shall be operated with no visible emissions, as determined by the methods specified in § 63.309(h)(1), except for periods not to exceed a total of 5 minutes during any 2 consecutive hours.
(d)
As an alternative to the installation, operation, and maintenance of a flare system as required in paragraph (a) of this section, the owner or operator may petition the Administrator for approval of an alternative control device or system that achieves at least 98 percent destruction or control of coke oven emissions vented to the alternative control device or system.
(e)
The owner or operator of a by-product coke oven battery is exempt from the requirements of this section if the owner or operator:
(1)
Submits to the Administrator, no later than November 10, 1993, a formal commitment to close the battery permanently; and
(2)
Closes the battery permanently no later than December 31, 1995. In no case may the owner or operator continue to operate a battery for which a closure commitment is submitted, past December 31, 1995.
(f)
Any emissions resulting from the installation of flares (or other pollution control devices or systems approved pursuant to paragraph (d) of this section) shall not be used in making new source review determinations under part C and part D of title I of the Act.
Notes, amendments, and revision history

Source

Source: 58 FR 57911, Oct. 27, 1993, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.

Source

Source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.

§63.308. Standards for collecting mains.

40 C.F.R. § 63.308

(a)
On and after November 15, 1993, the owner or operator of a by-product coke oven battery shall inspect the collecting main for leaks at least once daily according to the procedures in Method 303 in appendix A to this part.
(b)
The owner or operator shall record the time and date a leak is first observed, the time and date the leak is temporarily sealed, and the time and date of repair.
(c)
The owner or operator shall temporarily seal any leak in the collecting main as soon as possible after detection, but no later than 4 hours after detection of the leak.
(d)
The owner or operator shall initiate a collecting main repair as expeditiously as possible, but no later than 5 calendar days after initial detection of the leak. The repair shall be completed within 15 calendar days after initial detection of the leak unless an alternative schedule is approved by the Administrator.
Notes, amendments, and revision history

Source

Source: 58 FR 57911, Oct. 27, 1993, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.

Source

Source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.