US Codex
C.F.R.
Browse by date
Notes

§63.302. Standards for by-product coke oven batteries. — Inbound Citations

40 C.F.R. § 63.302

Cited by 11 regulations in release Current.

Citations to 40 C.F.R. § 63.302 as a whole

  • (a) An owner or operator of an existing coke oven battery (including a cold-idle coke oven battery), a padup rebuild, or a brownfield coke oven battery, may elect an extension of the compliance date for emission limits to be promulgated pursuant to section 112(f) of the Act in accordance with section 112(i)(8). To receive an extension of the compliance date from January 1, 2003, until January 1, 2020, the owner or operator shall notify the Administrator as described in § 63.311(c) that the battery will comply with the emission limitations and requirements in this section in lieu of the applicable emission limitations in § 63.302 or 63.303.
  • (a) The owner or operator of a new or existing coke oven battery equipped with a shed for the capture of coke oven emissions from coke oven doors and an emission control device for the collection of the emissions may comply with an alternative to the applicable visible emission limitations for coke oven doors in §§ 63.302 and 63.304 according to the procedures and requirements in this section.
  • (1) Approval of alternatives to the requirements in §§ 63.300 and 63.302 through 63.308 (except the authorities in 63.306(a)(2) and (d)).

Citations to §63.302(a)

Citations to §63.302(a)(1)

Citations to §63.302(a)(2)

Citations to §63.302(a)(3)

Citations to §63.302(b)

  • (b) The provisions for new sources in §§ 63.302(b) and (c) and 63.303(b) apply to each greenfield coke oven battery and to each new or reconstructed coke oven battery at an existing coke plant if the changes to or addition of a coke oven battery results in an increase in the design capacity of the coke plant as of November 15, 1990, (including any capacity qualifying under § 63.304(b)(6), and the capacity of any coke oven battery subject to a construction permit on November 15, 1990, which commenced operation before October 27, 1993.

Citations to §63.302(c)

  • (b) The provisions for new sources in §§ 63.302(b) and (c) and 63.303(b) apply to each greenfield coke oven battery and to each new or reconstructed coke oven battery at an existing coke plant if the changes to or addition of a coke oven battery results in an increase in the design capacity of the coke plant as of November 15, 1990, (including any capacity qualifying under § 63.304(b)(6), and the capacity of any coke oven battery subject to a construction permit on November 15, 1990, which commenced operation before October 27, 1993.
  • (e) Except as provided in § 63.302(c), section 112(g) of the Act shall not apply to sources subject to this subpart.