§63.1306. Reporting requirements. — Inbound Citations
40 C.F.R. § 63.1306
Statutory Authority
Cited by 7 regulations in release Current.
Citations to §63.1306(c)(1)
-
(c) Each affected source shall submit a notification of compliance status report no later than 180 days after the compliance date. For slabstock affected sources, this report shall contain the information listed in paragraphs (c)(1) through (3) of this section, as applicable. This report shall contain the information listed in paragraph (c)(4) of this section for molded foam processes and in paragraph (c)(5) of this section for rebond foam processes.(1) A list of diisocyanate storage vessels, along with a record of the type of control utilized for each storage vessel.(2) For transfer pumps in diisocyanate service, a record of the type of control utilized for each transfer pump.(3) A statement that the slabstock foam affected source is in compliance with §§ 63.1297 and 63.1298, or a statement that slabstock foam processes at an affected source are in compliance with §§ 63.1297 and 63.1298.
Citations to §63.1306(c)(2)
-
(c) Each affected source shall submit a notification of compliance status report no later than 180 days after the compliance date. For slabstock affected sources, this report shall contain the information listed in paragraphs (c)(1) through (3) of this section, as applicable. This report shall contain the information listed in paragraph (c)(4) of this section for molded foam processes and in paragraph (c)(5) of this section for rebond foam processes.(1) A list of diisocyanate storage vessels, along with a record of the type of control utilized for each storage vessel.(2) For transfer pumps in diisocyanate service, a record of the type of control utilized for each transfer pump.(3) A statement that the slabstock foam affected source is in compliance with §§ 63.1297 and 63.1298, or a statement that slabstock foam processes at an affected source are in compliance with §§ 63.1297 and 63.1298.
Citations to §63.1306(c)(3)
-
(c) Each affected source shall submit a notification of compliance status report no later than 180 days after the compliance date. For slabstock affected sources, this report shall contain the information listed in paragraphs (c)(1) through (3) of this section, as applicable. This report shall contain the information listed in paragraph (c)(4) of this section for molded foam processes and in paragraph (c)(5) of this section for rebond foam processes.(1) A list of diisocyanate storage vessels, along with a record of the type of control utilized for each storage vessel.(2) For transfer pumps in diisocyanate service, a record of the type of control utilized for each transfer pump.(3) A statement that the slabstock foam affected source is in compliance with §§ 63.1297 and 63.1298, or a statement that slabstock foam processes at an affected source are in compliance with §§ 63.1297 and 63.1298.
Citations to §63.1306(d)(1)
-
(d) Each slabstock affected source shall submit a report containing the information specified in paragraphs (d)(1) through (3) of this section semiannually no later than 60 days after the end of each 180 day period. The first report shall be submitted no later than 240 days after the date that the Notification of Compliance Status is due and shall cover the 6-month period beginning on the date that the Notification of Compliance Status Report is due.(1) For sources complying with the storage vessel provisions of § 63.1294(a) using a carbon adsorption system, unloading events that occurred after breakthrough was detected and before the carbon was replaced.(2) Any equipment leaks that were not repaired in accordance with §§ 63.1294(b)(2)(iii) and 63.1294(c).(3) Any leaks in vapor return lines that were not repaired in accordance with § 63.1294(a)(1)(ii).
Citations to §63.1306(d)(2)
-
(d) Each slabstock affected source shall submit a report containing the information specified in paragraphs (d)(1) through (3) of this section semiannually no later than 60 days after the end of each 180 day period. The first report shall be submitted no later than 240 days after the date that the Notification of Compliance Status is due and shall cover the 6-month period beginning on the date that the Notification of Compliance Status Report is due.(1) For sources complying with the storage vessel provisions of § 63.1294(a) using a carbon adsorption system, unloading events that occurred after breakthrough was detected and before the carbon was replaced.(2) Any equipment leaks that were not repaired in accordance with §§ 63.1294(b)(2)(iii) and 63.1294(c).(3) Any leaks in vapor return lines that were not repaired in accordance with § 63.1294(a)(1)(ii).
Citations to §63.1306(d)(3)
-
(d) Each slabstock affected source shall submit a report containing the information specified in paragraphs (d)(1) through (3) of this section semiannually no later than 60 days after the end of each 180 day period. The first report shall be submitted no later than 240 days after the date that the Notification of Compliance Status is due and shall cover the 6-month period beginning on the date that the Notification of Compliance Status Report is due.(1) For sources complying with the storage vessel provisions of § 63.1294(a) using a carbon adsorption system, unloading events that occurred after breakthrough was detected and before the carbon was replaced.(2) Any equipment leaks that were not repaired in accordance with §§ 63.1294(b)(2)(iii) and 63.1294(c).(3) Any leaks in vapor return lines that were not repaired in accordance with § 63.1294(a)(1)(ii).
Citations to §63.1306(g)
-
(2) The requirement to submit a compliance certification annually as required under § 63.1306(g).