§63.11501. What are the notification, recordkeeping, and reporting requirements? — Inbound Citations
40 C.F.R. § 63.11501
Statutory Authority
Cited by 68 regulations in release Current.
Citations to §63.11501(b)
-
(ii) The requirements in § 63.2450(k)(6) to request approval of a procedure to monitor operating parameters does not apply for the purposes of this subpart. You must provide the required information in your NOCS report required by § 63.11501(b).
-
For any CMPU, heat exchange system, or wastewater system subject to the provisions of both this subpart and another rule, you may elect to comply only with the more stringent provisions as specified in paragraphs (a) through (d) of this section. You must consider all provisions of the rules, including monitoring, recordkeeping, and reporting. You must identify the subject CMPU, heat exchange system, and/or wastewater system, and the provisions with which you will comply in your NOCS report required by § 63.11501(b). You also must demonstrate in your NOCS report that each provision with which you will comply is at least as stringent as the otherwise applicable requirement in this subpart VVVVVV. You are responsible for making accurate determinations concerning the more stringent standards and noncompliance with this rule is not excused if it is later determined that your determination was in error and, as a result, you are violating this subpart. Compliance with this rule is your responsibility and the NOCS report does not alter or affect that responsibility.
Citations to §63.11501(b)(1)
-
(b) Beginning August 31, 2026, the owner or operator must submit all subsequent Notification of Compliance Status reports in PDF format to the EPA following the procedure specified in § 63.9(k). Your NOCS required by § 63.9(h) must include the following additional information specified in paragraphs (b)(1) through (5) of this section, as applicable. Within 150 days after the first applicable compliance date, you must also submit the information in paragraph (b)(6) of this section for equipment subject to the requirements of § 63.11495(a)(6).(i) “This facility complies with the management practices in § 63.11495.”(ii) “This facility complies with the requirements in § 63.11496 for HAP emissions from process vents.”(iii) “This facility complies with the requirements in § 63.11496 and § 63.11497 for surge control vessels, bottoms receivers, and storage tanks.”(iv) “This facility complies with the requirements in § 63.11498 to treat wastewater streams.”(v) “This facility complies with the requirements in § 63.11499 for heat exchange systems.”(2) If you comply with the alternative standard as specified in Table 2 to this subpart or Table 3 to this subpart, include the information specified in § 63.1258(b)(5), as applicable.(3) If you establish an operating limit for a parameter that will not be monitored continuously in accordance with §§ 63.11496(g)(4) and 63.2450(k)(6), provide the information as specified in §§ 63.11496(g)(4) and 63.2450(k)(6).(4) A list of all transferred liquids that are reactive or resinous materials, as defined in § 63.11502(b).(5) If you comply with provisions in an overlapping rule in accordance with § 63.11500, identify the affected CMPU, heat exchange system, and/or wastewater system; provide a list of the specific provisions with which you will comply; and demonstrate that the provisions with which you will comply are at least as stringent as the otherwise applicable requirements, including monitoring, recordkeeping, and reporting requirements, in this subpart VVVVVV.(6) For equipment subject to the requirements of § 63.11495(a)(6), you must also submit the information specified in paragraphs (b)(6)(i) through (iv) of this section.(i) CMPU identification,(ii) Number of each equipment type (e.g., valves, pumps) excluding equipment in vacuum service; and(iii) Method of compliance with the standard (e.g., “annual leak detection and repair” or “equipped with dual mechanical seals”).(iv) For pressure relief devices subject to the pressure release management work practice standards in § 63.165(e), you must submit the information listed in paragraphs (b)(6)(iv)(A) and (B) of this section.(A) A description of the monitoring system to be implemented, including the relief devices and process parameters to be monitored, and a description of the alarms or other methods by which operators will be notified of a pressure release.
Citations to §63.11501(b)(2)
-
(b) Beginning August 31, 2026, the owner or operator must submit all subsequent Notification of Compliance Status reports in PDF format to the EPA following the procedure specified in § 63.9(k). Your NOCS required by § 63.9(h) must include the following additional information specified in paragraphs (b)(1) through (5) of this section, as applicable. Within 150 days after the first applicable compliance date, you must also submit the information in paragraph (b)(6) of this section for equipment subject to the requirements of § 63.11495(a)(6).(i) “This facility complies with the management practices in § 63.11495.”(ii) “This facility complies with the requirements in § 63.11496 for HAP emissions from process vents.”(iii) “This facility complies with the requirements in § 63.11496 and § 63.11497 for surge control vessels, bottoms receivers, and storage tanks.”(iv) “This facility complies with the requirements in § 63.11498 to treat wastewater streams.”(v) “This facility complies with the requirements in § 63.11499 for heat exchange systems.”(2) If you comply with the alternative standard as specified in Table 2 to this subpart or Table 3 to this subpart, include the information specified in § 63.1258(b)(5), as applicable.(3) If you establish an operating limit for a parameter that will not be monitored continuously in accordance with §§ 63.11496(g)(4) and 63.2450(k)(6), provide the information as specified in §§ 63.11496(g)(4) and 63.2450(k)(6).(4) A list of all transferred liquids that are reactive or resinous materials, as defined in § 63.11502(b).(5) If you comply with provisions in an overlapping rule in accordance with § 63.11500, identify the affected CMPU, heat exchange system, and/or wastewater system; provide a list of the specific provisions with which you will comply; and demonstrate that the provisions with which you will comply are at least as stringent as the otherwise applicable requirements, including monitoring, recordkeeping, and reporting requirements, in this subpart VVVVVV.(6) For equipment subject to the requirements of § 63.11495(a)(6), you must also submit the information specified in paragraphs (b)(6)(i) through (iv) of this section.(i) CMPU identification,(ii) Number of each equipment type (e.g., valves, pumps) excluding equipment in vacuum service; and(iii) Method of compliance with the standard (e.g., “annual leak detection and repair” or “equipped with dual mechanical seals”).(iv) For pressure relief devices subject to the pressure release management work practice standards in § 63.165(e), you must submit the information listed in paragraphs (b)(6)(iv)(A) and (B) of this section.(A) A description of the monitoring system to be implemented, including the relief devices and process parameters to be monitored, and a description of the alarms or other methods by which operators will be notified of a pressure release.
Citations to §63.11501(b)(3)
-
(b) Beginning August 31, 2026, the owner or operator must submit all subsequent Notification of Compliance Status reports in PDF format to the EPA following the procedure specified in § 63.9(k). Your NOCS required by § 63.9(h) must include the following additional information specified in paragraphs (b)(1) through (5) of this section, as applicable. Within 150 days after the first applicable compliance date, you must also submit the information in paragraph (b)(6) of this section for equipment subject to the requirements of § 63.11495(a)(6).(i) “This facility complies with the management practices in § 63.11495.”(ii) “This facility complies with the requirements in § 63.11496 for HAP emissions from process vents.”(iii) “This facility complies with the requirements in § 63.11496 and § 63.11497 for surge control vessels, bottoms receivers, and storage tanks.”(iv) “This facility complies with the requirements in § 63.11498 to treat wastewater streams.”(v) “This facility complies with the requirements in § 63.11499 for heat exchange systems.”(2) If you comply with the alternative standard as specified in Table 2 to this subpart or Table 3 to this subpart, include the information specified in § 63.1258(b)(5), as applicable.(3) If you establish an operating limit for a parameter that will not be monitored continuously in accordance with §§ 63.11496(g)(4) and 63.2450(k)(6), provide the information as specified in §§ 63.11496(g)(4) and 63.2450(k)(6).(4) A list of all transferred liquids that are reactive or resinous materials, as defined in § 63.11502(b).(5) If you comply with provisions in an overlapping rule in accordance with § 63.11500, identify the affected CMPU, heat exchange system, and/or wastewater system; provide a list of the specific provisions with which you will comply; and demonstrate that the provisions with which you will comply are at least as stringent as the otherwise applicable requirements, including monitoring, recordkeeping, and reporting requirements, in this subpart VVVVVV.(6) For equipment subject to the requirements of § 63.11495(a)(6), you must also submit the information specified in paragraphs (b)(6)(i) through (iv) of this section.(i) CMPU identification,(ii) Number of each equipment type (e.g., valves, pumps) excluding equipment in vacuum service; and(iii) Method of compliance with the standard (e.g., “annual leak detection and repair” or “equipped with dual mechanical seals”).(iv) For pressure relief devices subject to the pressure release management work practice standards in § 63.165(e), you must submit the information listed in paragraphs (b)(6)(iv)(A) and (B) of this section.(A) A description of the monitoring system to be implemented, including the relief devices and process parameters to be monitored, and a description of the alarms or other methods by which operators will be notified of a pressure release.
Citations to §63.11501(b)(4)
-
(b) Beginning August 31, 2026, the owner or operator must submit all subsequent Notification of Compliance Status reports in PDF format to the EPA following the procedure specified in § 63.9(k). Your NOCS required by § 63.9(h) must include the following additional information specified in paragraphs (b)(1) through (5) of this section, as applicable. Within 150 days after the first applicable compliance date, you must also submit the information in paragraph (b)(6) of this section for equipment subject to the requirements of § 63.11495(a)(6).(i) “This facility complies with the management practices in § 63.11495.”(ii) “This facility complies with the requirements in § 63.11496 for HAP emissions from process vents.”(iii) “This facility complies with the requirements in § 63.11496 and § 63.11497 for surge control vessels, bottoms receivers, and storage tanks.”(iv) “This facility complies with the requirements in § 63.11498 to treat wastewater streams.”(v) “This facility complies with the requirements in § 63.11499 for heat exchange systems.”(2) If you comply with the alternative standard as specified in Table 2 to this subpart or Table 3 to this subpart, include the information specified in § 63.1258(b)(5), as applicable.(3) If you establish an operating limit for a parameter that will not be monitored continuously in accordance with §§ 63.11496(g)(4) and 63.2450(k)(6), provide the information as specified in §§ 63.11496(g)(4) and 63.2450(k)(6).(4) A list of all transferred liquids that are reactive or resinous materials, as defined in § 63.11502(b).(5) If you comply with provisions in an overlapping rule in accordance with § 63.11500, identify the affected CMPU, heat exchange system, and/or wastewater system; provide a list of the specific provisions with which you will comply; and demonstrate that the provisions with which you will comply are at least as stringent as the otherwise applicable requirements, including monitoring, recordkeeping, and reporting requirements, in this subpart VVVVVV.(6) For equipment subject to the requirements of § 63.11495(a)(6), you must also submit the information specified in paragraphs (b)(6)(i) through (iv) of this section.(i) CMPU identification,(ii) Number of each equipment type (e.g., valves, pumps) excluding equipment in vacuum service; and(iii) Method of compliance with the standard (e.g., “annual leak detection and repair” or “equipped with dual mechanical seals”).(iv) For pressure relief devices subject to the pressure release management work practice standards in § 63.165(e), you must submit the information listed in paragraphs (b)(6)(iv)(A) and (B) of this section.(A) A description of the monitoring system to be implemented, including the relief devices and process parameters to be monitored, and a description of the alarms or other methods by which operators will be notified of a pressure release.
Citations to §63.11501(b)(5)
-
(b) Beginning August 31, 2026, the owner or operator must submit all subsequent Notification of Compliance Status reports in PDF format to the EPA following the procedure specified in § 63.9(k). Your NOCS required by § 63.9(h) must include the following additional information specified in paragraphs (b)(1) through (5) of this section, as applicable. Within 150 days after the first applicable compliance date, you must also submit the information in paragraph (b)(6) of this section for equipment subject to the requirements of § 63.11495(a)(6).(i) “This facility complies with the management practices in § 63.11495.”(ii) “This facility complies with the requirements in § 63.11496 for HAP emissions from process vents.”(iii) “This facility complies with the requirements in § 63.11496 and § 63.11497 for surge control vessels, bottoms receivers, and storage tanks.”(iv) “This facility complies with the requirements in § 63.11498 to treat wastewater streams.”(v) “This facility complies with the requirements in § 63.11499 for heat exchange systems.”(2) If you comply with the alternative standard as specified in Table 2 to this subpart or Table 3 to this subpart, include the information specified in § 63.1258(b)(5), as applicable.(3) If you establish an operating limit for a parameter that will not be monitored continuously in accordance with §§ 63.11496(g)(4) and 63.2450(k)(6), provide the information as specified in §§ 63.11496(g)(4) and 63.2450(k)(6).(4) A list of all transferred liquids that are reactive or resinous materials, as defined in § 63.11502(b).(5) If you comply with provisions in an overlapping rule in accordance with § 63.11500, identify the affected CMPU, heat exchange system, and/or wastewater system; provide a list of the specific provisions with which you will comply; and demonstrate that the provisions with which you will comply are at least as stringent as the otherwise applicable requirements, including monitoring, recordkeeping, and reporting requirements, in this subpart VVVVVV.(6) For equipment subject to the requirements of § 63.11495(a)(6), you must also submit the information specified in paragraphs (b)(6)(i) through (iv) of this section.(i) CMPU identification,(ii) Number of each equipment type (e.g., valves, pumps) excluding equipment in vacuum service; and(iii) Method of compliance with the standard (e.g., “annual leak detection and repair” or “equipped with dual mechanical seals”).(iv) For pressure relief devices subject to the pressure release management work practice standards in § 63.165(e), you must submit the information listed in paragraphs (b)(6)(iv)(A) and (B) of this section.(A) A description of the monitoring system to be implemented, including the relief devices and process parameters to be monitored, and a description of the alarms or other methods by which operators will be notified of a pressure release.
Citations to §63.11501(b)(6)
-
(xiii) Submit the Notification of Compliance Status as specified in § 63.11501(b)(6).
Citations to §63.11501(b)(6)(i)
-
(6) For equipment subject to the requirements of § 63.11495(a)(6), you must also submit the information specified in paragraphs (b)(6)(i) through (iv) of this section.(i) CMPU identification,(ii) Number of each equipment type (e.g., valves, pumps) excluding equipment in vacuum service; and(iii) Method of compliance with the standard (e.g., “annual leak detection and repair” or “equipped with dual mechanical seals”).(iv) For pressure relief devices subject to the pressure release management work practice standards in § 63.165(e), you must submit the information listed in paragraphs (b)(6)(iv)(A) and (B) of this section.(A) A description of the monitoring system to be implemented, including the relief devices and process parameters to be monitored, and a description of the alarms or other methods by which operators will be notified of a pressure release.
Citations to §63.11501(b)(6)(ii)
-
(6) For equipment subject to the requirements of § 63.11495(a)(6), you must also submit the information specified in paragraphs (b)(6)(i) through (iv) of this section.(i) CMPU identification,(ii) Number of each equipment type (e.g., valves, pumps) excluding equipment in vacuum service; and(iii) Method of compliance with the standard (e.g., “annual leak detection and repair” or “equipped with dual mechanical seals”).(iv) For pressure relief devices subject to the pressure release management work practice standards in § 63.165(e), you must submit the information listed in paragraphs (b)(6)(iv)(A) and (B) of this section.(A) A description of the monitoring system to be implemented, including the relief devices and process parameters to be monitored, and a description of the alarms or other methods by which operators will be notified of a pressure release.
Citations to §63.11501(b)(6)(iii)
-
(6) For equipment subject to the requirements of § 63.11495(a)(6), you must also submit the information specified in paragraphs (b)(6)(i) through (iv) of this section.(i) CMPU identification,(ii) Number of each equipment type (e.g., valves, pumps) excluding equipment in vacuum service; and(iii) Method of compliance with the standard (e.g., “annual leak detection and repair” or “equipped with dual mechanical seals”).(iv) For pressure relief devices subject to the pressure release management work practice standards in § 63.165(e), you must submit the information listed in paragraphs (b)(6)(iv)(A) and (B) of this section.(A) A description of the monitoring system to be implemented, including the relief devices and process parameters to be monitored, and a description of the alarms or other methods by which operators will be notified of a pressure release.
Citations to §63.11501(b)(6)(iv)
-
(6) For equipment subject to the requirements of § 63.11495(a)(6), you must also submit the information specified in paragraphs (b)(6)(i) through (iv) of this section.(i) CMPU identification,(ii) Number of each equipment type (e.g., valves, pumps) excluding equipment in vacuum service; and(iii) Method of compliance with the standard (e.g., “annual leak detection and repair” or “equipped with dual mechanical seals”).(iv) For pressure relief devices subject to the pressure release management work practice standards in § 63.165(e), you must submit the information listed in paragraphs (b)(6)(iv)(A) and (B) of this section.(A) A description of the monitoring system to be implemented, including the relief devices and process parameters to be monitored, and a description of the alarms or other methods by which operators will be notified of a pressure release.
Citations to §63.11501(c)(1)
-
(c) You must maintain files of all information required by this subpart for at least 5 years following the date of each occurrence according to the requirements in § 63.10(b)(1). If you are subject, you must comply with the recordkeeping and reporting requirements of § 63.10(b)(2)(iii) and (vi) through (xiv), and the applicable requirements specified in paragraphs (c)(1) through (11) of this section.(1) For each CMPU subject to this subpart, you must keep the records specified in paragraphs (c)(1)(i) through (viii) of this section.(i) Except as specified in paragraph (c)(9) of this section, records of management practice inspections, repairs, and reasons for any delay of repair, as specified in § 63.11495(a)(5).(ii) Except as specified in paragraph (c)(11) of this section, records of small heat exchange system inspections, demonstrations of indications of leaks that do not constitute leaks, repairs, and reasons for any delay in repair as specified in § 63.11495(b).(iii) If batch process vent emissions are less than 10,000 lb/yr for a CMPU, records of batch process vent emission calculations, as specified in § 63.11496(a)(1), the number of batches operated each month, as specified in § 63.11496(a)(3), and any updated emissions calculations, as specified in § 63.11496(a)(3). Alternatively, keep records of the worst-case processes or organic HAP usage, as specified in § 63.11496(a)(2) and (4), respectively.(iv) Records of all TRE calculations for continuous process vents as specified in § 63.11496(b)(2).(v) Records of metal HAP emission calculations as specified in § 63.11496(f)(1) and (2). If total uncontrolled metal HAP process vent emissions from a CMPU subject to this subpart are estimated to be less than 400 lb/yr, also keep records of either the number of batches per month or operating hours, as specified in § 63.11496(f)(2).(vi) Records identifying wastewater streams and the type of treatment they receive, as specified in table 6 to this subpart.(vii) Before April 1, 2029, records of the date, time, and duration of each malfunction of operation of process equipment, control devices, recovery devices, or continuous monitoring systems used to comply with this subpart that causes a failure to meet a standard. The record must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. After April 1, 2029, for any deviation, records of the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, and a description of the method used to estimate the emissions.(viii) Before April 1, 2029, records of actions taken during periods of malfunction to minimize emissions in accordance with § 63.11495(d), including corrective actions to restore malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of operation. After April 1, 2029, for any deviation, records of actions taken to minimize emissions in accordance with § 63.11495(d), and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) For batch process vents subject to table 2 to this subpart and continuous process vents subject to table 3 to this subpart, you must keep records specified in paragraphs (c)(2)(i) or (ii) of this section, as applicable.(i) If you route emissions to a control device other than a flare, keep records of performance tests, if applicable, as specified in § 63.998(a)(2)(ii) and (4), keep records of the monitoring system and the monitored parameters, as specified in § 63.998(b) and (c), and keep records of the closed-vent system, as specified in § 63.998(d)(1). If you use a recovery device to maintain the TRE above 1.0 for a continuous process vent, keep records of monitoring parameters during the TRE index value determination, as specified in § 63.998(a)(3).(ii) If you route emissions to a flare, keep records of the flare compliance assessment, as specified in § 63.998(a)(1)(i), keep records of the pilot flame monitoring, as specified in § 63.998(a)(1)(ii) and (iii), and keep records of the closed-vent system, as specified in § 63.998(d)(1).(3) For metal HAP process vents subject to table 4 to this subpart, you must keep records specified in paragraph (c)(3)(i) or (ii) of this section, as applicable.(i) For a new source using a control device other than a baghouse and for any existing source, maintain a monitoring plan, as specified in § 63.11496(f)(3)(i), and keep records of monitoring results, as specified in § 63.11496(f)(3).(ii) For a new source using a baghouse to control metal HAP emissions, keep a site-specific monitoring plan, as specified in §§ 63.11496(f)(4) and 63.11410(g), and keep records of bag leak detection systems, as specified in §§ 63.11496(f)(4) and 63.11410(g)(4).(4) For each storage tank subject to table 5 to this subpart, you must keep records specified in paragraphs (c)(4)(i) through (vii) of this section, as applicable.(i) Keep records of the vessel dimensions, capacity, and liquid stored, as specified in § 63.1065(a).(ii) Keep records of each inspection of an internal floating roof, as specified in § 63.1065(b)(1).(iii) Keep records of each seal gap measurement for external floating roofs, as specified in § 63.1065(b)(2), and keep records of inspections of external floating roofs, as specified in § 63.1065(b)(1).(iv) If you vent emissions to a control device other than a flare, keep records of the operating plan and measured parameter values, as specified in §§ 63.985(c) and 63.998(d)(2).(v) If you vent emissions to a flare, keep records of all periods of operation during which the flare pilot flame is absent, as specified in §§ 63.987(c) and 63.998(a)(1), and keep records of closed-vent systems, as specified in § 63.998(d)(1).(vi) For periods of planned routine maintenance of a control device, keep records of the day and time at which each maintenance period begins and ends, and keep records of the type of maintenance performed, as specified in § 63.11497(b)(3).(vii) For each pressure vessel subject to the requirements of § 63.11497(f) you must keep records as specified in paragraphs (c)(4)(vii)(A) and (B) of this section.(A) The date of each performance test conducted according to § 63.11497(f)(2).(B) The record of each performance test conducted according to § 63.11497(f)(2), including the following:(1) Date each defect was detected and the instrument reading (in ppmv) during the performance test.(2) Date of the next performance test that shows the instrument reading is less than 500 ppmv and the instrument reading (in ppmv) during the performance test.(3) Start and end dates of each period after the date in paragraph (c)(4)(ix)(B)(1) of this section when the pressure vessel was completely empty.(4) Estimated emissions from each defect.(5) For each wastewater stream subject to item 2 in table 6 to this subpart, keep records of the wastewater stream identification and the disposition of the organic phase(s), as specified in item 2 to table 6 to this subpart.(6) Except as specified in paragraph (c)(11) of this section, for each large heat exchange system subject to table 8 to this subpart, you must keep records of detected leaks; the date the leak was detected; if demonstrated not to be a leak, the basis for that determination; the date of efforts to repair the leak; and the date the leak is repaired, as specified in table 8 to this subpart.(7) You must keep a record of all transferred liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) For continuous process vents subject to table 3 to this subpart, keep records of the occurrence and duration of each startup and shutdown of operation of process equipment, or of air pollution control and monitoring equipment.(9) If you are subject to the equipment leak requirements specified in § 63.11495(a)(6), then you must keep records as specified in paragraphs (c)(9)(i) through (vii) of this section instead of the records specified in paragraph (c)(1)(i) of this section.(i) Keep a list, summary description, or diagram(s) showing the location and identification number of all equipment in organic HAP service at the facility and the information in paragraphs (c)(9)(i)(A) through (D) of this section.(A) Identification of equipment designated as unsafe to monitor, difficult to monitor, unsafe to inspect, difficult to inspect, or unsafe to repair and the plan for monitoring or inspecting this equipment, as applicable.(B) Identification of the equipment in batch process units, for which you do not elect to pressure test the batch product process equipment train.(ii) For leak detection monitoring and inspections required by paragraphs § 63.11495(a)(6) (e.g., monitoring using Method 21 of appendix A-7 to part 60 of this chapter; visible, audible, or olfactory monitoring; closed vent system inspections; and batch process unit monitoring), record the date of the monitoring or inspection and include a statement of whether leaks were detected. If no leaks are detected, records of the monitoring and inspection results are not required.(iii) When each leak is detected as specified in § 63.11495(a)(6), the following information must be recorded:(A) The instrument and the equipment identification number and the operator name, initials, or identification number.(D) Maximum instrument reading measured by Method 21 of 40 CFR part 60, appendix A-7 of this chapter after it is successfully repaired or determined to be nonrepairable.(E) “Repair delayed” and the reason for the delay if a leak is not repaired within 15 calendar days after discovery of the leak.(1) You may develop a written procedure that identifies the conditions that justify a delay of repair. In such cases, reasons for delay of repair may be documented by citing the relevant sections of the written procedure.(2) If delay of repair was caused by depletion of stocked parts, there must be documentation that the spare parts were sufficiently stocked on-site before depletion and the reason for depletion.(iv) For each pressure relief device subject to the provisions in § 63.165(e), you must keep the records specified in paragraphs (c)(9)(iv)(A) through (C) of this section.(A) Records of the prevention measures implemented as required in § 63.165(e)(3)(ii).(C) For each release to the atmosphere, you must keep the records specified in paragraphs (c)(9)(iv)(C)(1) through (4) of this section.(1) The start and end time and date of each pressure release to the atmosphere.(2) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.(3) Records of the root cause analysis and corrective action analysis conducted as required in § 63.165(e)(3)(iii), including an identification of the affected facility, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under § 63.165(e)(7)(i).(4) For any corrective action analysis for which implementation of corrective actions are required in § 63.165(e)(7), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.(v) If you own or operate a batch product process and elect to pressure test the batch product process equipment train to demonstrate compliance with § 63.11495(a)(6), you are exempt from the requirements of paragraphs (c)(9)(i) through (iv) of this section. Instead, you must maintain records of the following information:(B) The dates of each pressure test required in § 63.178(b), the test pressure, and the pressure drop observed during the test.(C) When a batch product process equipment train does not pass two consecutive pressure tests, the following information must be recorded:(1) The date of each pressure test and the date of each leak repair attempt.(2) Repair methods applied in each attempt to repair the leak.(3) The reason for the delay of repair.(4) The expected date for delivery of the replacement equipment and the actual date of delivery of the replacement equipment.(5) The date of successful repair.(vi) You must maintain records of the information specified in paragraphs (c)(9)(vi)(A) through (C) of this section for closed vent systems and control devices subject to the provisions of § 63.172. The records specified in paragraph (c)(9)(vi)(A) of this section must be retained for the life of the equipment.(A) The design specifications and performance demonstrations specified in paragraphs (c)(9)(vi)(A)(1) through (4) of this section.(1) Detailed schematics, design specifications of the control device, and piping and instrumentation diagrams.(2) The dates and descriptions of any changes in the design specifications.(3) The flare design (i.e., steam-assisted, air-assisted, or non-assisted) and the results of the compliance demonstration required by subpart SS of this part.(4) A description of the parameter or parameters monitored, as required in § 63.172(e), to ensure that control devices are operated and maintained in conformance with their design and an explanation of why that parameter (or parameters) was selected for the monitoring.(B) Records of operation of closed vent systems and control devices, as specified in paragraphs (c)(9)(vi)(B)(1) through (3) of this section.(1) Dates and durations when the closed vent systems and control devices required in § 63.11495(a)(6) are not operated as designed as indicated by the monitored parameters, including periods when a flare pilot light system does not have a flame.(2) Dates and durations during which the monitoring system or monitoring device is inoperative.(3) Dates and durations of startups and shutdowns of control devices required in § 63.11495(a)(6).(C) Records of inspections of closed vent systems subject to the provisions of § 63.172, as specified in paragraphs (c)(9)(vi)(C)(1) and (2) of this section.(1) For each inspection conducted in accordance with the provisions of § 63.172(f)(1) or (2) during which leaks were detected, the information specified in paragraph (c)(9)(iii) of this section must be recorded.(2) For each flow event from a bypass line subject to the requirements in § 63.172(j), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements in § 63.11495(a)(6), you must include an estimate of the volume of gas, the concentration of organic HAP in the gas, and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(vii) If you choose to comply with the requirements of § 63.179, you must maintain the following records:(C) A description of the system used to create a negative pressure in the enclosure to ensure that all emissions are routed to the control device.(10) For each flow event from a bypass line subject to the requirements in § 63.11495(e), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements specified in §§ 63.11495 through 63.11499, you must include an estimate of the volume of gas, the concentration of organic HAP in the gas and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must keep records as specified in § 63.104(f)(3) instead of the heat exchange system records specified in paragraphs (c)(1)(ii) and (6) of this section.
Citations to §63.11501(c)(1)(i)
-
(1) For each CMPU subject to this subpart, you must keep the records specified in paragraphs (c)(1)(i) through (viii) of this section.(i) Except as specified in paragraph (c)(9) of this section, records of management practice inspections, repairs, and reasons for any delay of repair, as specified in § 63.11495(a)(5).(ii) Except as specified in paragraph (c)(11) of this section, records of small heat exchange system inspections, demonstrations of indications of leaks that do not constitute leaks, repairs, and reasons for any delay in repair as specified in § 63.11495(b).(iii) If batch process vent emissions are less than 10,000 lb/yr for a CMPU, records of batch process vent emission calculations, as specified in § 63.11496(a)(1), the number of batches operated each month, as specified in § 63.11496(a)(3), and any updated emissions calculations, as specified in § 63.11496(a)(3). Alternatively, keep records of the worst-case processes or organic HAP usage, as specified in § 63.11496(a)(2) and (4), respectively.(iv) Records of all TRE calculations for continuous process vents as specified in § 63.11496(b)(2).(v) Records of metal HAP emission calculations as specified in § 63.11496(f)(1) and (2). If total uncontrolled metal HAP process vent emissions from a CMPU subject to this subpart are estimated to be less than 400 lb/yr, also keep records of either the number of batches per month or operating hours, as specified in § 63.11496(f)(2).(vi) Records identifying wastewater streams and the type of treatment they receive, as specified in table 6 to this subpart.(vii) Before April 1, 2029, records of the date, time, and duration of each malfunction of operation of process equipment, control devices, recovery devices, or continuous monitoring systems used to comply with this subpart that causes a failure to meet a standard. The record must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. After April 1, 2029, for any deviation, records of the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, and a description of the method used to estimate the emissions.(viii) Before April 1, 2029, records of actions taken during periods of malfunction to minimize emissions in accordance with § 63.11495(d), including corrective actions to restore malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of operation. After April 1, 2029, for any deviation, records of actions taken to minimize emissions in accordance with § 63.11495(d), and any corrective action taken to return the affected unit to its normal or usual manner of operation.
Citations to §63.11501(c)(2)
-
(c) You must maintain files of all information required by this subpart for at least 5 years following the date of each occurrence according to the requirements in § 63.10(b)(1). If you are subject, you must comply with the recordkeeping and reporting requirements of § 63.10(b)(2)(iii) and (vi) through (xiv), and the applicable requirements specified in paragraphs (c)(1) through (11) of this section.(1) For each CMPU subject to this subpart, you must keep the records specified in paragraphs (c)(1)(i) through (viii) of this section.(i) Except as specified in paragraph (c)(9) of this section, records of management practice inspections, repairs, and reasons for any delay of repair, as specified in § 63.11495(a)(5).(ii) Except as specified in paragraph (c)(11) of this section, records of small heat exchange system inspections, demonstrations of indications of leaks that do not constitute leaks, repairs, and reasons for any delay in repair as specified in § 63.11495(b).(iii) If batch process vent emissions are less than 10,000 lb/yr for a CMPU, records of batch process vent emission calculations, as specified in § 63.11496(a)(1), the number of batches operated each month, as specified in § 63.11496(a)(3), and any updated emissions calculations, as specified in § 63.11496(a)(3). Alternatively, keep records of the worst-case processes or organic HAP usage, as specified in § 63.11496(a)(2) and (4), respectively.(iv) Records of all TRE calculations for continuous process vents as specified in § 63.11496(b)(2).(v) Records of metal HAP emission calculations as specified in § 63.11496(f)(1) and (2). If total uncontrolled metal HAP process vent emissions from a CMPU subject to this subpart are estimated to be less than 400 lb/yr, also keep records of either the number of batches per month or operating hours, as specified in § 63.11496(f)(2).(vi) Records identifying wastewater streams and the type of treatment they receive, as specified in table 6 to this subpart.(vii) Before April 1, 2029, records of the date, time, and duration of each malfunction of operation of process equipment, control devices, recovery devices, or continuous monitoring systems used to comply with this subpart that causes a failure to meet a standard. The record must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. After April 1, 2029, for any deviation, records of the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, and a description of the method used to estimate the emissions.(viii) Before April 1, 2029, records of actions taken during periods of malfunction to minimize emissions in accordance with § 63.11495(d), including corrective actions to restore malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of operation. After April 1, 2029, for any deviation, records of actions taken to minimize emissions in accordance with § 63.11495(d), and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) For batch process vents subject to table 2 to this subpart and continuous process vents subject to table 3 to this subpart, you must keep records specified in paragraphs (c)(2)(i) or (ii) of this section, as applicable.(i) If you route emissions to a control device other than a flare, keep records of performance tests, if applicable, as specified in § 63.998(a)(2)(ii) and (4), keep records of the monitoring system and the monitored parameters, as specified in § 63.998(b) and (c), and keep records of the closed-vent system, as specified in § 63.998(d)(1). If you use a recovery device to maintain the TRE above 1.0 for a continuous process vent, keep records of monitoring parameters during the TRE index value determination, as specified in § 63.998(a)(3).(ii) If you route emissions to a flare, keep records of the flare compliance assessment, as specified in § 63.998(a)(1)(i), keep records of the pilot flame monitoring, as specified in § 63.998(a)(1)(ii) and (iii), and keep records of the closed-vent system, as specified in § 63.998(d)(1).(3) For metal HAP process vents subject to table 4 to this subpart, you must keep records specified in paragraph (c)(3)(i) or (ii) of this section, as applicable.(i) For a new source using a control device other than a baghouse and for any existing source, maintain a monitoring plan, as specified in § 63.11496(f)(3)(i), and keep records of monitoring results, as specified in § 63.11496(f)(3).(ii) For a new source using a baghouse to control metal HAP emissions, keep a site-specific monitoring plan, as specified in §§ 63.11496(f)(4) and 63.11410(g), and keep records of bag leak detection systems, as specified in §§ 63.11496(f)(4) and 63.11410(g)(4).(4) For each storage tank subject to table 5 to this subpart, you must keep records specified in paragraphs (c)(4)(i) through (vii) of this section, as applicable.(i) Keep records of the vessel dimensions, capacity, and liquid stored, as specified in § 63.1065(a).(ii) Keep records of each inspection of an internal floating roof, as specified in § 63.1065(b)(1).(iii) Keep records of each seal gap measurement for external floating roofs, as specified in § 63.1065(b)(2), and keep records of inspections of external floating roofs, as specified in § 63.1065(b)(1).(iv) If you vent emissions to a control device other than a flare, keep records of the operating plan and measured parameter values, as specified in §§ 63.985(c) and 63.998(d)(2).(v) If you vent emissions to a flare, keep records of all periods of operation during which the flare pilot flame is absent, as specified in §§ 63.987(c) and 63.998(a)(1), and keep records of closed-vent systems, as specified in § 63.998(d)(1).(vi) For periods of planned routine maintenance of a control device, keep records of the day and time at which each maintenance period begins and ends, and keep records of the type of maintenance performed, as specified in § 63.11497(b)(3).(vii) For each pressure vessel subject to the requirements of § 63.11497(f) you must keep records as specified in paragraphs (c)(4)(vii)(A) and (B) of this section.(A) The date of each performance test conducted according to § 63.11497(f)(2).(B) The record of each performance test conducted according to § 63.11497(f)(2), including the following:(1) Date each defect was detected and the instrument reading (in ppmv) during the performance test.(2) Date of the next performance test that shows the instrument reading is less than 500 ppmv and the instrument reading (in ppmv) during the performance test.(3) Start and end dates of each period after the date in paragraph (c)(4)(ix)(B)(1) of this section when the pressure vessel was completely empty.(4) Estimated emissions from each defect.(5) For each wastewater stream subject to item 2 in table 6 to this subpart, keep records of the wastewater stream identification and the disposition of the organic phase(s), as specified in item 2 to table 6 to this subpart.(6) Except as specified in paragraph (c)(11) of this section, for each large heat exchange system subject to table 8 to this subpart, you must keep records of detected leaks; the date the leak was detected; if demonstrated not to be a leak, the basis for that determination; the date of efforts to repair the leak; and the date the leak is repaired, as specified in table 8 to this subpart.(7) You must keep a record of all transferred liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) For continuous process vents subject to table 3 to this subpart, keep records of the occurrence and duration of each startup and shutdown of operation of process equipment, or of air pollution control and monitoring equipment.(9) If you are subject to the equipment leak requirements specified in § 63.11495(a)(6), then you must keep records as specified in paragraphs (c)(9)(i) through (vii) of this section instead of the records specified in paragraph (c)(1)(i) of this section.(i) Keep a list, summary description, or diagram(s) showing the location and identification number of all equipment in organic HAP service at the facility and the information in paragraphs (c)(9)(i)(A) through (D) of this section.(A) Identification of equipment designated as unsafe to monitor, difficult to monitor, unsafe to inspect, difficult to inspect, or unsafe to repair and the plan for monitoring or inspecting this equipment, as applicable.(B) Identification of the equipment in batch process units, for which you do not elect to pressure test the batch product process equipment train.(ii) For leak detection monitoring and inspections required by paragraphs § 63.11495(a)(6) (e.g., monitoring using Method 21 of appendix A-7 to part 60 of this chapter; visible, audible, or olfactory monitoring; closed vent system inspections; and batch process unit monitoring), record the date of the monitoring or inspection and include a statement of whether leaks were detected. If no leaks are detected, records of the monitoring and inspection results are not required.(iii) When each leak is detected as specified in § 63.11495(a)(6), the following information must be recorded:(A) The instrument and the equipment identification number and the operator name, initials, or identification number.(D) Maximum instrument reading measured by Method 21 of 40 CFR part 60, appendix A-7 of this chapter after it is successfully repaired or determined to be nonrepairable.(E) “Repair delayed” and the reason for the delay if a leak is not repaired within 15 calendar days after discovery of the leak.(1) You may develop a written procedure that identifies the conditions that justify a delay of repair. In such cases, reasons for delay of repair may be documented by citing the relevant sections of the written procedure.(2) If delay of repair was caused by depletion of stocked parts, there must be documentation that the spare parts were sufficiently stocked on-site before depletion and the reason for depletion.(iv) For each pressure relief device subject to the provisions in § 63.165(e), you must keep the records specified in paragraphs (c)(9)(iv)(A) through (C) of this section.(A) Records of the prevention measures implemented as required in § 63.165(e)(3)(ii).(C) For each release to the atmosphere, you must keep the records specified in paragraphs (c)(9)(iv)(C)(1) through (4) of this section.(1) The start and end time and date of each pressure release to the atmosphere.(2) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.(3) Records of the root cause analysis and corrective action analysis conducted as required in § 63.165(e)(3)(iii), including an identification of the affected facility, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under § 63.165(e)(7)(i).(4) For any corrective action analysis for which implementation of corrective actions are required in § 63.165(e)(7), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.(v) If you own or operate a batch product process and elect to pressure test the batch product process equipment train to demonstrate compliance with § 63.11495(a)(6), you are exempt from the requirements of paragraphs (c)(9)(i) through (iv) of this section. Instead, you must maintain records of the following information:(B) The dates of each pressure test required in § 63.178(b), the test pressure, and the pressure drop observed during the test.(C) When a batch product process equipment train does not pass two consecutive pressure tests, the following information must be recorded:(1) The date of each pressure test and the date of each leak repair attempt.(2) Repair methods applied in each attempt to repair the leak.(3) The reason for the delay of repair.(4) The expected date for delivery of the replacement equipment and the actual date of delivery of the replacement equipment.(5) The date of successful repair.(vi) You must maintain records of the information specified in paragraphs (c)(9)(vi)(A) through (C) of this section for closed vent systems and control devices subject to the provisions of § 63.172. The records specified in paragraph (c)(9)(vi)(A) of this section must be retained for the life of the equipment.(A) The design specifications and performance demonstrations specified in paragraphs (c)(9)(vi)(A)(1) through (4) of this section.(1) Detailed schematics, design specifications of the control device, and piping and instrumentation diagrams.(2) The dates and descriptions of any changes in the design specifications.(3) The flare design (i.e., steam-assisted, air-assisted, or non-assisted) and the results of the compliance demonstration required by subpart SS of this part.(4) A description of the parameter or parameters monitored, as required in § 63.172(e), to ensure that control devices are operated and maintained in conformance with their design and an explanation of why that parameter (or parameters) was selected for the monitoring.(B) Records of operation of closed vent systems and control devices, as specified in paragraphs (c)(9)(vi)(B)(1) through (3) of this section.(1) Dates and durations when the closed vent systems and control devices required in § 63.11495(a)(6) are not operated as designed as indicated by the monitored parameters, including periods when a flare pilot light system does not have a flame.(2) Dates and durations during which the monitoring system or monitoring device is inoperative.(3) Dates and durations of startups and shutdowns of control devices required in § 63.11495(a)(6).(C) Records of inspections of closed vent systems subject to the provisions of § 63.172, as specified in paragraphs (c)(9)(vi)(C)(1) and (2) of this section.(1) For each inspection conducted in accordance with the provisions of § 63.172(f)(1) or (2) during which leaks were detected, the information specified in paragraph (c)(9)(iii) of this section must be recorded.(2) For each flow event from a bypass line subject to the requirements in § 63.172(j), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements in § 63.11495(a)(6), you must include an estimate of the volume of gas, the concentration of organic HAP in the gas, and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(vii) If you choose to comply with the requirements of § 63.179, you must maintain the following records:(C) A description of the system used to create a negative pressure in the enclosure to ensure that all emissions are routed to the control device.(10) For each flow event from a bypass line subject to the requirements in § 63.11495(e), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements specified in §§ 63.11495 through 63.11499, you must include an estimate of the volume of gas, the concentration of organic HAP in the gas and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must keep records as specified in § 63.104(f)(3) instead of the heat exchange system records specified in paragraphs (c)(1)(ii) and (6) of this section.
Citations to §63.11501(c)(3)
-
(c) You must maintain files of all information required by this subpart for at least 5 years following the date of each occurrence according to the requirements in § 63.10(b)(1). If you are subject, you must comply with the recordkeeping and reporting requirements of § 63.10(b)(2)(iii) and (vi) through (xiv), and the applicable requirements specified in paragraphs (c)(1) through (11) of this section.(1) For each CMPU subject to this subpart, you must keep the records specified in paragraphs (c)(1)(i) through (viii) of this section.(i) Except as specified in paragraph (c)(9) of this section, records of management practice inspections, repairs, and reasons for any delay of repair, as specified in § 63.11495(a)(5).(ii) Except as specified in paragraph (c)(11) of this section, records of small heat exchange system inspections, demonstrations of indications of leaks that do not constitute leaks, repairs, and reasons for any delay in repair as specified in § 63.11495(b).(iii) If batch process vent emissions are less than 10,000 lb/yr for a CMPU, records of batch process vent emission calculations, as specified in § 63.11496(a)(1), the number of batches operated each month, as specified in § 63.11496(a)(3), and any updated emissions calculations, as specified in § 63.11496(a)(3). Alternatively, keep records of the worst-case processes or organic HAP usage, as specified in § 63.11496(a)(2) and (4), respectively.(iv) Records of all TRE calculations for continuous process vents as specified in § 63.11496(b)(2).(v) Records of metal HAP emission calculations as specified in § 63.11496(f)(1) and (2). If total uncontrolled metal HAP process vent emissions from a CMPU subject to this subpart are estimated to be less than 400 lb/yr, also keep records of either the number of batches per month or operating hours, as specified in § 63.11496(f)(2).(vi) Records identifying wastewater streams and the type of treatment they receive, as specified in table 6 to this subpart.(vii) Before April 1, 2029, records of the date, time, and duration of each malfunction of operation of process equipment, control devices, recovery devices, or continuous monitoring systems used to comply with this subpart that causes a failure to meet a standard. The record must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. After April 1, 2029, for any deviation, records of the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, and a description of the method used to estimate the emissions.(viii) Before April 1, 2029, records of actions taken during periods of malfunction to minimize emissions in accordance with § 63.11495(d), including corrective actions to restore malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of operation. After April 1, 2029, for any deviation, records of actions taken to minimize emissions in accordance with § 63.11495(d), and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) For batch process vents subject to table 2 to this subpart and continuous process vents subject to table 3 to this subpart, you must keep records specified in paragraphs (c)(2)(i) or (ii) of this section, as applicable.(i) If you route emissions to a control device other than a flare, keep records of performance tests, if applicable, as specified in § 63.998(a)(2)(ii) and (4), keep records of the monitoring system and the monitored parameters, as specified in § 63.998(b) and (c), and keep records of the closed-vent system, as specified in § 63.998(d)(1). If you use a recovery device to maintain the TRE above 1.0 for a continuous process vent, keep records of monitoring parameters during the TRE index value determination, as specified in § 63.998(a)(3).(ii) If you route emissions to a flare, keep records of the flare compliance assessment, as specified in § 63.998(a)(1)(i), keep records of the pilot flame monitoring, as specified in § 63.998(a)(1)(ii) and (iii), and keep records of the closed-vent system, as specified in § 63.998(d)(1).(3) For metal HAP process vents subject to table 4 to this subpart, you must keep records specified in paragraph (c)(3)(i) or (ii) of this section, as applicable.(i) For a new source using a control device other than a baghouse and for any existing source, maintain a monitoring plan, as specified in § 63.11496(f)(3)(i), and keep records of monitoring results, as specified in § 63.11496(f)(3).(ii) For a new source using a baghouse to control metal HAP emissions, keep a site-specific monitoring plan, as specified in §§ 63.11496(f)(4) and 63.11410(g), and keep records of bag leak detection systems, as specified in §§ 63.11496(f)(4) and 63.11410(g)(4).(4) For each storage tank subject to table 5 to this subpart, you must keep records specified in paragraphs (c)(4)(i) through (vii) of this section, as applicable.(i) Keep records of the vessel dimensions, capacity, and liquid stored, as specified in § 63.1065(a).(ii) Keep records of each inspection of an internal floating roof, as specified in § 63.1065(b)(1).(iii) Keep records of each seal gap measurement for external floating roofs, as specified in § 63.1065(b)(2), and keep records of inspections of external floating roofs, as specified in § 63.1065(b)(1).(iv) If you vent emissions to a control device other than a flare, keep records of the operating plan and measured parameter values, as specified in §§ 63.985(c) and 63.998(d)(2).(v) If you vent emissions to a flare, keep records of all periods of operation during which the flare pilot flame is absent, as specified in §§ 63.987(c) and 63.998(a)(1), and keep records of closed-vent systems, as specified in § 63.998(d)(1).(vi) For periods of planned routine maintenance of a control device, keep records of the day and time at which each maintenance period begins and ends, and keep records of the type of maintenance performed, as specified in § 63.11497(b)(3).(vii) For each pressure vessel subject to the requirements of § 63.11497(f) you must keep records as specified in paragraphs (c)(4)(vii)(A) and (B) of this section.(A) The date of each performance test conducted according to § 63.11497(f)(2).(B) The record of each performance test conducted according to § 63.11497(f)(2), including the following:(1) Date each defect was detected and the instrument reading (in ppmv) during the performance test.(2) Date of the next performance test that shows the instrument reading is less than 500 ppmv and the instrument reading (in ppmv) during the performance test.(3) Start and end dates of each period after the date in paragraph (c)(4)(ix)(B)(1) of this section when the pressure vessel was completely empty.(4) Estimated emissions from each defect.(5) For each wastewater stream subject to item 2 in table 6 to this subpart, keep records of the wastewater stream identification and the disposition of the organic phase(s), as specified in item 2 to table 6 to this subpart.(6) Except as specified in paragraph (c)(11) of this section, for each large heat exchange system subject to table 8 to this subpart, you must keep records of detected leaks; the date the leak was detected; if demonstrated not to be a leak, the basis for that determination; the date of efforts to repair the leak; and the date the leak is repaired, as specified in table 8 to this subpart.(7) You must keep a record of all transferred liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) For continuous process vents subject to table 3 to this subpart, keep records of the occurrence and duration of each startup and shutdown of operation of process equipment, or of air pollution control and monitoring equipment.(9) If you are subject to the equipment leak requirements specified in § 63.11495(a)(6), then you must keep records as specified in paragraphs (c)(9)(i) through (vii) of this section instead of the records specified in paragraph (c)(1)(i) of this section.(i) Keep a list, summary description, or diagram(s) showing the location and identification number of all equipment in organic HAP service at the facility and the information in paragraphs (c)(9)(i)(A) through (D) of this section.(A) Identification of equipment designated as unsafe to monitor, difficult to monitor, unsafe to inspect, difficult to inspect, or unsafe to repair and the plan for monitoring or inspecting this equipment, as applicable.(B) Identification of the equipment in batch process units, for which you do not elect to pressure test the batch product process equipment train.(ii) For leak detection monitoring and inspections required by paragraphs § 63.11495(a)(6) (e.g., monitoring using Method 21 of appendix A-7 to part 60 of this chapter; visible, audible, or olfactory monitoring; closed vent system inspections; and batch process unit monitoring), record the date of the monitoring or inspection and include a statement of whether leaks were detected. If no leaks are detected, records of the monitoring and inspection results are not required.(iii) When each leak is detected as specified in § 63.11495(a)(6), the following information must be recorded:(A) The instrument and the equipment identification number and the operator name, initials, or identification number.(D) Maximum instrument reading measured by Method 21 of 40 CFR part 60, appendix A-7 of this chapter after it is successfully repaired or determined to be nonrepairable.(E) “Repair delayed” and the reason for the delay if a leak is not repaired within 15 calendar days after discovery of the leak.(1) You may develop a written procedure that identifies the conditions that justify a delay of repair. In such cases, reasons for delay of repair may be documented by citing the relevant sections of the written procedure.(2) If delay of repair was caused by depletion of stocked parts, there must be documentation that the spare parts were sufficiently stocked on-site before depletion and the reason for depletion.(iv) For each pressure relief device subject to the provisions in § 63.165(e), you must keep the records specified in paragraphs (c)(9)(iv)(A) through (C) of this section.(A) Records of the prevention measures implemented as required in § 63.165(e)(3)(ii).(C) For each release to the atmosphere, you must keep the records specified in paragraphs (c)(9)(iv)(C)(1) through (4) of this section.(1) The start and end time and date of each pressure release to the atmosphere.(2) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.(3) Records of the root cause analysis and corrective action analysis conducted as required in § 63.165(e)(3)(iii), including an identification of the affected facility, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under § 63.165(e)(7)(i).(4) For any corrective action analysis for which implementation of corrective actions are required in § 63.165(e)(7), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.(v) If you own or operate a batch product process and elect to pressure test the batch product process equipment train to demonstrate compliance with § 63.11495(a)(6), you are exempt from the requirements of paragraphs (c)(9)(i) through (iv) of this section. Instead, you must maintain records of the following information:(B) The dates of each pressure test required in § 63.178(b), the test pressure, and the pressure drop observed during the test.(C) When a batch product process equipment train does not pass two consecutive pressure tests, the following information must be recorded:(1) The date of each pressure test and the date of each leak repair attempt.(2) Repair methods applied in each attempt to repair the leak.(3) The reason for the delay of repair.(4) The expected date for delivery of the replacement equipment and the actual date of delivery of the replacement equipment.(5) The date of successful repair.(vi) You must maintain records of the information specified in paragraphs (c)(9)(vi)(A) through (C) of this section for closed vent systems and control devices subject to the provisions of § 63.172. The records specified in paragraph (c)(9)(vi)(A) of this section must be retained for the life of the equipment.(A) The design specifications and performance demonstrations specified in paragraphs (c)(9)(vi)(A)(1) through (4) of this section.(1) Detailed schematics, design specifications of the control device, and piping and instrumentation diagrams.(2) The dates and descriptions of any changes in the design specifications.(3) The flare design (i.e., steam-assisted, air-assisted, or non-assisted) and the results of the compliance demonstration required by subpart SS of this part.(4) A description of the parameter or parameters monitored, as required in § 63.172(e), to ensure that control devices are operated and maintained in conformance with their design and an explanation of why that parameter (or parameters) was selected for the monitoring.(B) Records of operation of closed vent systems and control devices, as specified in paragraphs (c)(9)(vi)(B)(1) through (3) of this section.(1) Dates and durations when the closed vent systems and control devices required in § 63.11495(a)(6) are not operated as designed as indicated by the monitored parameters, including periods when a flare pilot light system does not have a flame.(2) Dates and durations during which the monitoring system or monitoring device is inoperative.(3) Dates and durations of startups and shutdowns of control devices required in § 63.11495(a)(6).(C) Records of inspections of closed vent systems subject to the provisions of § 63.172, as specified in paragraphs (c)(9)(vi)(C)(1) and (2) of this section.(1) For each inspection conducted in accordance with the provisions of § 63.172(f)(1) or (2) during which leaks were detected, the information specified in paragraph (c)(9)(iii) of this section must be recorded.(2) For each flow event from a bypass line subject to the requirements in § 63.172(j), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements in § 63.11495(a)(6), you must include an estimate of the volume of gas, the concentration of organic HAP in the gas, and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(vii) If you choose to comply with the requirements of § 63.179, you must maintain the following records:(C) A description of the system used to create a negative pressure in the enclosure to ensure that all emissions are routed to the control device.(10) For each flow event from a bypass line subject to the requirements in § 63.11495(e), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements specified in §§ 63.11495 through 63.11499, you must include an estimate of the volume of gas, the concentration of organic HAP in the gas and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must keep records as specified in § 63.104(f)(3) instead of the heat exchange system records specified in paragraphs (c)(1)(ii) and (6) of this section.
Citations to §63.11501(c)(4)
-
(c) You must maintain files of all information required by this subpart for at least 5 years following the date of each occurrence according to the requirements in § 63.10(b)(1). If you are subject, you must comply with the recordkeeping and reporting requirements of § 63.10(b)(2)(iii) and (vi) through (xiv), and the applicable requirements specified in paragraphs (c)(1) through (11) of this section.(1) For each CMPU subject to this subpart, you must keep the records specified in paragraphs (c)(1)(i) through (viii) of this section.(i) Except as specified in paragraph (c)(9) of this section, records of management practice inspections, repairs, and reasons for any delay of repair, as specified in § 63.11495(a)(5).(ii) Except as specified in paragraph (c)(11) of this section, records of small heat exchange system inspections, demonstrations of indications of leaks that do not constitute leaks, repairs, and reasons for any delay in repair as specified in § 63.11495(b).(iii) If batch process vent emissions are less than 10,000 lb/yr for a CMPU, records of batch process vent emission calculations, as specified in § 63.11496(a)(1), the number of batches operated each month, as specified in § 63.11496(a)(3), and any updated emissions calculations, as specified in § 63.11496(a)(3). Alternatively, keep records of the worst-case processes or organic HAP usage, as specified in § 63.11496(a)(2) and (4), respectively.(iv) Records of all TRE calculations for continuous process vents as specified in § 63.11496(b)(2).(v) Records of metal HAP emission calculations as specified in § 63.11496(f)(1) and (2). If total uncontrolled metal HAP process vent emissions from a CMPU subject to this subpart are estimated to be less than 400 lb/yr, also keep records of either the number of batches per month or operating hours, as specified in § 63.11496(f)(2).(vi) Records identifying wastewater streams and the type of treatment they receive, as specified in table 6 to this subpart.(vii) Before April 1, 2029, records of the date, time, and duration of each malfunction of operation of process equipment, control devices, recovery devices, or continuous monitoring systems used to comply with this subpart that causes a failure to meet a standard. The record must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. After April 1, 2029, for any deviation, records of the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, and a description of the method used to estimate the emissions.(viii) Before April 1, 2029, records of actions taken during periods of malfunction to minimize emissions in accordance with § 63.11495(d), including corrective actions to restore malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of operation. After April 1, 2029, for any deviation, records of actions taken to minimize emissions in accordance with § 63.11495(d), and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) For batch process vents subject to table 2 to this subpart and continuous process vents subject to table 3 to this subpart, you must keep records specified in paragraphs (c)(2)(i) or (ii) of this section, as applicable.(i) If you route emissions to a control device other than a flare, keep records of performance tests, if applicable, as specified in § 63.998(a)(2)(ii) and (4), keep records of the monitoring system and the monitored parameters, as specified in § 63.998(b) and (c), and keep records of the closed-vent system, as specified in § 63.998(d)(1). If you use a recovery device to maintain the TRE above 1.0 for a continuous process vent, keep records of monitoring parameters during the TRE index value determination, as specified in § 63.998(a)(3).(ii) If you route emissions to a flare, keep records of the flare compliance assessment, as specified in § 63.998(a)(1)(i), keep records of the pilot flame monitoring, as specified in § 63.998(a)(1)(ii) and (iii), and keep records of the closed-vent system, as specified in § 63.998(d)(1).(3) For metal HAP process vents subject to table 4 to this subpart, you must keep records specified in paragraph (c)(3)(i) or (ii) of this section, as applicable.(i) For a new source using a control device other than a baghouse and for any existing source, maintain a monitoring plan, as specified in § 63.11496(f)(3)(i), and keep records of monitoring results, as specified in § 63.11496(f)(3).(ii) For a new source using a baghouse to control metal HAP emissions, keep a site-specific monitoring plan, as specified in §§ 63.11496(f)(4) and 63.11410(g), and keep records of bag leak detection systems, as specified in §§ 63.11496(f)(4) and 63.11410(g)(4).(4) For each storage tank subject to table 5 to this subpart, you must keep records specified in paragraphs (c)(4)(i) through (vii) of this section, as applicable.(i) Keep records of the vessel dimensions, capacity, and liquid stored, as specified in § 63.1065(a).(ii) Keep records of each inspection of an internal floating roof, as specified in § 63.1065(b)(1).(iii) Keep records of each seal gap measurement for external floating roofs, as specified in § 63.1065(b)(2), and keep records of inspections of external floating roofs, as specified in § 63.1065(b)(1).(iv) If you vent emissions to a control device other than a flare, keep records of the operating plan and measured parameter values, as specified in §§ 63.985(c) and 63.998(d)(2).(v) If you vent emissions to a flare, keep records of all periods of operation during which the flare pilot flame is absent, as specified in §§ 63.987(c) and 63.998(a)(1), and keep records of closed-vent systems, as specified in § 63.998(d)(1).(vi) For periods of planned routine maintenance of a control device, keep records of the day and time at which each maintenance period begins and ends, and keep records of the type of maintenance performed, as specified in § 63.11497(b)(3).(vii) For each pressure vessel subject to the requirements of § 63.11497(f) you must keep records as specified in paragraphs (c)(4)(vii)(A) and (B) of this section.(A) The date of each performance test conducted according to § 63.11497(f)(2).(B) The record of each performance test conducted according to § 63.11497(f)(2), including the following:(1) Date each defect was detected and the instrument reading (in ppmv) during the performance test.(2) Date of the next performance test that shows the instrument reading is less than 500 ppmv and the instrument reading (in ppmv) during the performance test.(3) Start and end dates of each period after the date in paragraph (c)(4)(ix)(B)(1) of this section when the pressure vessel was completely empty.(4) Estimated emissions from each defect.(5) For each wastewater stream subject to item 2 in table 6 to this subpart, keep records of the wastewater stream identification and the disposition of the organic phase(s), as specified in item 2 to table 6 to this subpart.(6) Except as specified in paragraph (c)(11) of this section, for each large heat exchange system subject to table 8 to this subpart, you must keep records of detected leaks; the date the leak was detected; if demonstrated not to be a leak, the basis for that determination; the date of efforts to repair the leak; and the date the leak is repaired, as specified in table 8 to this subpart.(7) You must keep a record of all transferred liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) For continuous process vents subject to table 3 to this subpart, keep records of the occurrence and duration of each startup and shutdown of operation of process equipment, or of air pollution control and monitoring equipment.(9) If you are subject to the equipment leak requirements specified in § 63.11495(a)(6), then you must keep records as specified in paragraphs (c)(9)(i) through (vii) of this section instead of the records specified in paragraph (c)(1)(i) of this section.(i) Keep a list, summary description, or diagram(s) showing the location and identification number of all equipment in organic HAP service at the facility and the information in paragraphs (c)(9)(i)(A) through (D) of this section.(A) Identification of equipment designated as unsafe to monitor, difficult to monitor, unsafe to inspect, difficult to inspect, or unsafe to repair and the plan for monitoring or inspecting this equipment, as applicable.(B) Identification of the equipment in batch process units, for which you do not elect to pressure test the batch product process equipment train.(ii) For leak detection monitoring and inspections required by paragraphs § 63.11495(a)(6) (e.g., monitoring using Method 21 of appendix A-7 to part 60 of this chapter; visible, audible, or olfactory monitoring; closed vent system inspections; and batch process unit monitoring), record the date of the monitoring or inspection and include a statement of whether leaks were detected. If no leaks are detected, records of the monitoring and inspection results are not required.(iii) When each leak is detected as specified in § 63.11495(a)(6), the following information must be recorded:(A) The instrument and the equipment identification number and the operator name, initials, or identification number.(D) Maximum instrument reading measured by Method 21 of 40 CFR part 60, appendix A-7 of this chapter after it is successfully repaired or determined to be nonrepairable.(E) “Repair delayed” and the reason for the delay if a leak is not repaired within 15 calendar days after discovery of the leak.(1) You may develop a written procedure that identifies the conditions that justify a delay of repair. In such cases, reasons for delay of repair may be documented by citing the relevant sections of the written procedure.(2) If delay of repair was caused by depletion of stocked parts, there must be documentation that the spare parts were sufficiently stocked on-site before depletion and the reason for depletion.(iv) For each pressure relief device subject to the provisions in § 63.165(e), you must keep the records specified in paragraphs (c)(9)(iv)(A) through (C) of this section.(A) Records of the prevention measures implemented as required in § 63.165(e)(3)(ii).(C) For each release to the atmosphere, you must keep the records specified in paragraphs (c)(9)(iv)(C)(1) through (4) of this section.(1) The start and end time and date of each pressure release to the atmosphere.(2) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.(3) Records of the root cause analysis and corrective action analysis conducted as required in § 63.165(e)(3)(iii), including an identification of the affected facility, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under § 63.165(e)(7)(i).(4) For any corrective action analysis for which implementation of corrective actions are required in § 63.165(e)(7), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.(v) If you own or operate a batch product process and elect to pressure test the batch product process equipment train to demonstrate compliance with § 63.11495(a)(6), you are exempt from the requirements of paragraphs (c)(9)(i) through (iv) of this section. Instead, you must maintain records of the following information:(B) The dates of each pressure test required in § 63.178(b), the test pressure, and the pressure drop observed during the test.(C) When a batch product process equipment train does not pass two consecutive pressure tests, the following information must be recorded:(1) The date of each pressure test and the date of each leak repair attempt.(2) Repair methods applied in each attempt to repair the leak.(3) The reason for the delay of repair.(4) The expected date for delivery of the replacement equipment and the actual date of delivery of the replacement equipment.(5) The date of successful repair.(vi) You must maintain records of the information specified in paragraphs (c)(9)(vi)(A) through (C) of this section for closed vent systems and control devices subject to the provisions of § 63.172. The records specified in paragraph (c)(9)(vi)(A) of this section must be retained for the life of the equipment.(A) The design specifications and performance demonstrations specified in paragraphs (c)(9)(vi)(A)(1) through (4) of this section.(1) Detailed schematics, design specifications of the control device, and piping and instrumentation diagrams.(2) The dates and descriptions of any changes in the design specifications.(3) The flare design (i.e., steam-assisted, air-assisted, or non-assisted) and the results of the compliance demonstration required by subpart SS of this part.(4) A description of the parameter or parameters monitored, as required in § 63.172(e), to ensure that control devices are operated and maintained in conformance with their design and an explanation of why that parameter (or parameters) was selected for the monitoring.(B) Records of operation of closed vent systems and control devices, as specified in paragraphs (c)(9)(vi)(B)(1) through (3) of this section.(1) Dates and durations when the closed vent systems and control devices required in § 63.11495(a)(6) are not operated as designed as indicated by the monitored parameters, including periods when a flare pilot light system does not have a flame.(2) Dates and durations during which the monitoring system or monitoring device is inoperative.(3) Dates and durations of startups and shutdowns of control devices required in § 63.11495(a)(6).(C) Records of inspections of closed vent systems subject to the provisions of § 63.172, as specified in paragraphs (c)(9)(vi)(C)(1) and (2) of this section.(1) For each inspection conducted in accordance with the provisions of § 63.172(f)(1) or (2) during which leaks were detected, the information specified in paragraph (c)(9)(iii) of this section must be recorded.(2) For each flow event from a bypass line subject to the requirements in § 63.172(j), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements in § 63.11495(a)(6), you must include an estimate of the volume of gas, the concentration of organic HAP in the gas, and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(vii) If you choose to comply with the requirements of § 63.179, you must maintain the following records:(C) A description of the system used to create a negative pressure in the enclosure to ensure that all emissions are routed to the control device.(10) For each flow event from a bypass line subject to the requirements in § 63.11495(e), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements specified in §§ 63.11495 through 63.11499, you must include an estimate of the volume of gas, the concentration of organic HAP in the gas and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must keep records as specified in § 63.104(f)(3) instead of the heat exchange system records specified in paragraphs (c)(1)(ii) and (6) of this section.
Citations to §63.11501(c)(4)(i)
-
(4) For each storage tank subject to table 5 to this subpart, you must keep records specified in paragraphs (c)(4)(i) through (vii) of this section, as applicable.(i) Keep records of the vessel dimensions, capacity, and liquid stored, as specified in § 63.1065(a).(ii) Keep records of each inspection of an internal floating roof, as specified in § 63.1065(b)(1).(iii) Keep records of each seal gap measurement for external floating roofs, as specified in § 63.1065(b)(2), and keep records of inspections of external floating roofs, as specified in § 63.1065(b)(1).(iv) If you vent emissions to a control device other than a flare, keep records of the operating plan and measured parameter values, as specified in §§ 63.985(c) and 63.998(d)(2).(v) If you vent emissions to a flare, keep records of all periods of operation during which the flare pilot flame is absent, as specified in §§ 63.987(c) and 63.998(a)(1), and keep records of closed-vent systems, as specified in § 63.998(d)(1).(vi) For periods of planned routine maintenance of a control device, keep records of the day and time at which each maintenance period begins and ends, and keep records of the type of maintenance performed, as specified in § 63.11497(b)(3).(vii) For each pressure vessel subject to the requirements of § 63.11497(f) you must keep records as specified in paragraphs (c)(4)(vii)(A) and (B) of this section.(A) The date of each performance test conducted according to § 63.11497(f)(2).(B) The record of each performance test conducted according to § 63.11497(f)(2), including the following:(1) Date each defect was detected and the instrument reading (in ppmv) during the performance test.(2) Date of the next performance test that shows the instrument reading is less than 500 ppmv and the instrument reading (in ppmv) during the performance test.(3) Start and end dates of each period after the date in paragraph (c)(4)(ix)(B)(1) of this section when the pressure vessel was completely empty.(4) Estimated emissions from each defect.
Citations to §63.11501(c)(5)
-
(c) You must maintain files of all information required by this subpart for at least 5 years following the date of each occurrence according to the requirements in § 63.10(b)(1). If you are subject, you must comply with the recordkeeping and reporting requirements of § 63.10(b)(2)(iii) and (vi) through (xiv), and the applicable requirements specified in paragraphs (c)(1) through (11) of this section.(1) For each CMPU subject to this subpart, you must keep the records specified in paragraphs (c)(1)(i) through (viii) of this section.(i) Except as specified in paragraph (c)(9) of this section, records of management practice inspections, repairs, and reasons for any delay of repair, as specified in § 63.11495(a)(5).(ii) Except as specified in paragraph (c)(11) of this section, records of small heat exchange system inspections, demonstrations of indications of leaks that do not constitute leaks, repairs, and reasons for any delay in repair as specified in § 63.11495(b).(iii) If batch process vent emissions are less than 10,000 lb/yr for a CMPU, records of batch process vent emission calculations, as specified in § 63.11496(a)(1), the number of batches operated each month, as specified in § 63.11496(a)(3), and any updated emissions calculations, as specified in § 63.11496(a)(3). Alternatively, keep records of the worst-case processes or organic HAP usage, as specified in § 63.11496(a)(2) and (4), respectively.(iv) Records of all TRE calculations for continuous process vents as specified in § 63.11496(b)(2).(v) Records of metal HAP emission calculations as specified in § 63.11496(f)(1) and (2). If total uncontrolled metal HAP process vent emissions from a CMPU subject to this subpart are estimated to be less than 400 lb/yr, also keep records of either the number of batches per month or operating hours, as specified in § 63.11496(f)(2).(vi) Records identifying wastewater streams and the type of treatment they receive, as specified in table 6 to this subpart.(vii) Before April 1, 2029, records of the date, time, and duration of each malfunction of operation of process equipment, control devices, recovery devices, or continuous monitoring systems used to comply with this subpart that causes a failure to meet a standard. The record must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. After April 1, 2029, for any deviation, records of the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, and a description of the method used to estimate the emissions.(viii) Before April 1, 2029, records of actions taken during periods of malfunction to minimize emissions in accordance with § 63.11495(d), including corrective actions to restore malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of operation. After April 1, 2029, for any deviation, records of actions taken to minimize emissions in accordance with § 63.11495(d), and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) For batch process vents subject to table 2 to this subpart and continuous process vents subject to table 3 to this subpart, you must keep records specified in paragraphs (c)(2)(i) or (ii) of this section, as applicable.(i) If you route emissions to a control device other than a flare, keep records of performance tests, if applicable, as specified in § 63.998(a)(2)(ii) and (4), keep records of the monitoring system and the monitored parameters, as specified in § 63.998(b) and (c), and keep records of the closed-vent system, as specified in § 63.998(d)(1). If you use a recovery device to maintain the TRE above 1.0 for a continuous process vent, keep records of monitoring parameters during the TRE index value determination, as specified in § 63.998(a)(3).(ii) If you route emissions to a flare, keep records of the flare compliance assessment, as specified in § 63.998(a)(1)(i), keep records of the pilot flame monitoring, as specified in § 63.998(a)(1)(ii) and (iii), and keep records of the closed-vent system, as specified in § 63.998(d)(1).(3) For metal HAP process vents subject to table 4 to this subpart, you must keep records specified in paragraph (c)(3)(i) or (ii) of this section, as applicable.(i) For a new source using a control device other than a baghouse and for any existing source, maintain a monitoring plan, as specified in § 63.11496(f)(3)(i), and keep records of monitoring results, as specified in § 63.11496(f)(3).(ii) For a new source using a baghouse to control metal HAP emissions, keep a site-specific monitoring plan, as specified in §§ 63.11496(f)(4) and 63.11410(g), and keep records of bag leak detection systems, as specified in §§ 63.11496(f)(4) and 63.11410(g)(4).(4) For each storage tank subject to table 5 to this subpart, you must keep records specified in paragraphs (c)(4)(i) through (vii) of this section, as applicable.(i) Keep records of the vessel dimensions, capacity, and liquid stored, as specified in § 63.1065(a).(ii) Keep records of each inspection of an internal floating roof, as specified in § 63.1065(b)(1).(iii) Keep records of each seal gap measurement for external floating roofs, as specified in § 63.1065(b)(2), and keep records of inspections of external floating roofs, as specified in § 63.1065(b)(1).(iv) If you vent emissions to a control device other than a flare, keep records of the operating plan and measured parameter values, as specified in §§ 63.985(c) and 63.998(d)(2).(v) If you vent emissions to a flare, keep records of all periods of operation during which the flare pilot flame is absent, as specified in §§ 63.987(c) and 63.998(a)(1), and keep records of closed-vent systems, as specified in § 63.998(d)(1).(vi) For periods of planned routine maintenance of a control device, keep records of the day and time at which each maintenance period begins and ends, and keep records of the type of maintenance performed, as specified in § 63.11497(b)(3).(vii) For each pressure vessel subject to the requirements of § 63.11497(f) you must keep records as specified in paragraphs (c)(4)(vii)(A) and (B) of this section.(A) The date of each performance test conducted according to § 63.11497(f)(2).(B) The record of each performance test conducted according to § 63.11497(f)(2), including the following:(1) Date each defect was detected and the instrument reading (in ppmv) during the performance test.(2) Date of the next performance test that shows the instrument reading is less than 500 ppmv and the instrument reading (in ppmv) during the performance test.(3) Start and end dates of each period after the date in paragraph (c)(4)(ix)(B)(1) of this section when the pressure vessel was completely empty.(4) Estimated emissions from each defect.(5) For each wastewater stream subject to item 2 in table 6 to this subpart, keep records of the wastewater stream identification and the disposition of the organic phase(s), as specified in item 2 to table 6 to this subpart.(6) Except as specified in paragraph (c)(11) of this section, for each large heat exchange system subject to table 8 to this subpart, you must keep records of detected leaks; the date the leak was detected; if demonstrated not to be a leak, the basis for that determination; the date of efforts to repair the leak; and the date the leak is repaired, as specified in table 8 to this subpart.(7) You must keep a record of all transferred liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) For continuous process vents subject to table 3 to this subpart, keep records of the occurrence and duration of each startup and shutdown of operation of process equipment, or of air pollution control and monitoring equipment.(9) If you are subject to the equipment leak requirements specified in § 63.11495(a)(6), then you must keep records as specified in paragraphs (c)(9)(i) through (vii) of this section instead of the records specified in paragraph (c)(1)(i) of this section.(i) Keep a list, summary description, or diagram(s) showing the location and identification number of all equipment in organic HAP service at the facility and the information in paragraphs (c)(9)(i)(A) through (D) of this section.(A) Identification of equipment designated as unsafe to monitor, difficult to monitor, unsafe to inspect, difficult to inspect, or unsafe to repair and the plan for monitoring or inspecting this equipment, as applicable.(B) Identification of the equipment in batch process units, for which you do not elect to pressure test the batch product process equipment train.(ii) For leak detection monitoring and inspections required by paragraphs § 63.11495(a)(6) (e.g., monitoring using Method 21 of appendix A-7 to part 60 of this chapter; visible, audible, or olfactory monitoring; closed vent system inspections; and batch process unit monitoring), record the date of the monitoring or inspection and include a statement of whether leaks were detected. If no leaks are detected, records of the monitoring and inspection results are not required.(iii) When each leak is detected as specified in § 63.11495(a)(6), the following information must be recorded:(A) The instrument and the equipment identification number and the operator name, initials, or identification number.(D) Maximum instrument reading measured by Method 21 of 40 CFR part 60, appendix A-7 of this chapter after it is successfully repaired or determined to be nonrepairable.(E) “Repair delayed” and the reason for the delay if a leak is not repaired within 15 calendar days after discovery of the leak.(1) You may develop a written procedure that identifies the conditions that justify a delay of repair. In such cases, reasons for delay of repair may be documented by citing the relevant sections of the written procedure.(2) If delay of repair was caused by depletion of stocked parts, there must be documentation that the spare parts were sufficiently stocked on-site before depletion and the reason for depletion.(iv) For each pressure relief device subject to the provisions in § 63.165(e), you must keep the records specified in paragraphs (c)(9)(iv)(A) through (C) of this section.(A) Records of the prevention measures implemented as required in § 63.165(e)(3)(ii).(C) For each release to the atmosphere, you must keep the records specified in paragraphs (c)(9)(iv)(C)(1) through (4) of this section.(1) The start and end time and date of each pressure release to the atmosphere.(2) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.(3) Records of the root cause analysis and corrective action analysis conducted as required in § 63.165(e)(3)(iii), including an identification of the affected facility, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under § 63.165(e)(7)(i).(4) For any corrective action analysis for which implementation of corrective actions are required in § 63.165(e)(7), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.(v) If you own or operate a batch product process and elect to pressure test the batch product process equipment train to demonstrate compliance with § 63.11495(a)(6), you are exempt from the requirements of paragraphs (c)(9)(i) through (iv) of this section. Instead, you must maintain records of the following information:(B) The dates of each pressure test required in § 63.178(b), the test pressure, and the pressure drop observed during the test.(C) When a batch product process equipment train does not pass two consecutive pressure tests, the following information must be recorded:(1) The date of each pressure test and the date of each leak repair attempt.(2) Repair methods applied in each attempt to repair the leak.(3) The reason for the delay of repair.(4) The expected date for delivery of the replacement equipment and the actual date of delivery of the replacement equipment.(5) The date of successful repair.(vi) You must maintain records of the information specified in paragraphs (c)(9)(vi)(A) through (C) of this section for closed vent systems and control devices subject to the provisions of § 63.172. The records specified in paragraph (c)(9)(vi)(A) of this section must be retained for the life of the equipment.(A) The design specifications and performance demonstrations specified in paragraphs (c)(9)(vi)(A)(1) through (4) of this section.(1) Detailed schematics, design specifications of the control device, and piping and instrumentation diagrams.(2) The dates and descriptions of any changes in the design specifications.(3) The flare design (i.e., steam-assisted, air-assisted, or non-assisted) and the results of the compliance demonstration required by subpart SS of this part.(4) A description of the parameter or parameters monitored, as required in § 63.172(e), to ensure that control devices are operated and maintained in conformance with their design and an explanation of why that parameter (or parameters) was selected for the monitoring.(B) Records of operation of closed vent systems and control devices, as specified in paragraphs (c)(9)(vi)(B)(1) through (3) of this section.(1) Dates and durations when the closed vent systems and control devices required in § 63.11495(a)(6) are not operated as designed as indicated by the monitored parameters, including periods when a flare pilot light system does not have a flame.(2) Dates and durations during which the monitoring system or monitoring device is inoperative.(3) Dates and durations of startups and shutdowns of control devices required in § 63.11495(a)(6).(C) Records of inspections of closed vent systems subject to the provisions of § 63.172, as specified in paragraphs (c)(9)(vi)(C)(1) and (2) of this section.(1) For each inspection conducted in accordance with the provisions of § 63.172(f)(1) or (2) during which leaks were detected, the information specified in paragraph (c)(9)(iii) of this section must be recorded.(2) For each flow event from a bypass line subject to the requirements in § 63.172(j), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements in § 63.11495(a)(6), you must include an estimate of the volume of gas, the concentration of organic HAP in the gas, and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(vii) If you choose to comply with the requirements of § 63.179, you must maintain the following records:(C) A description of the system used to create a negative pressure in the enclosure to ensure that all emissions are routed to the control device.(10) For each flow event from a bypass line subject to the requirements in § 63.11495(e), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements specified in §§ 63.11495 through 63.11499, you must include an estimate of the volume of gas, the concentration of organic HAP in the gas and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must keep records as specified in § 63.104(f)(3) instead of the heat exchange system records specified in paragraphs (c)(1)(ii) and (6) of this section.
Citations to §63.11501(c)(6)
-
(c) You must maintain files of all information required by this subpart for at least 5 years following the date of each occurrence according to the requirements in § 63.10(b)(1). If you are subject, you must comply with the recordkeeping and reporting requirements of § 63.10(b)(2)(iii) and (vi) through (xiv), and the applicable requirements specified in paragraphs (c)(1) through (11) of this section.(1) For each CMPU subject to this subpart, you must keep the records specified in paragraphs (c)(1)(i) through (viii) of this section.(i) Except as specified in paragraph (c)(9) of this section, records of management practice inspections, repairs, and reasons for any delay of repair, as specified in § 63.11495(a)(5).(ii) Except as specified in paragraph (c)(11) of this section, records of small heat exchange system inspections, demonstrations of indications of leaks that do not constitute leaks, repairs, and reasons for any delay in repair as specified in § 63.11495(b).(iii) If batch process vent emissions are less than 10,000 lb/yr for a CMPU, records of batch process vent emission calculations, as specified in § 63.11496(a)(1), the number of batches operated each month, as specified in § 63.11496(a)(3), and any updated emissions calculations, as specified in § 63.11496(a)(3). Alternatively, keep records of the worst-case processes or organic HAP usage, as specified in § 63.11496(a)(2) and (4), respectively.(iv) Records of all TRE calculations for continuous process vents as specified in § 63.11496(b)(2).(v) Records of metal HAP emission calculations as specified in § 63.11496(f)(1) and (2). If total uncontrolled metal HAP process vent emissions from a CMPU subject to this subpart are estimated to be less than 400 lb/yr, also keep records of either the number of batches per month or operating hours, as specified in § 63.11496(f)(2).(vi) Records identifying wastewater streams and the type of treatment they receive, as specified in table 6 to this subpart.(vii) Before April 1, 2029, records of the date, time, and duration of each malfunction of operation of process equipment, control devices, recovery devices, or continuous monitoring systems used to comply with this subpart that causes a failure to meet a standard. The record must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. After April 1, 2029, for any deviation, records of the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, and a description of the method used to estimate the emissions.(viii) Before April 1, 2029, records of actions taken during periods of malfunction to minimize emissions in accordance with § 63.11495(d), including corrective actions to restore malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of operation. After April 1, 2029, for any deviation, records of actions taken to minimize emissions in accordance with § 63.11495(d), and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) For batch process vents subject to table 2 to this subpart and continuous process vents subject to table 3 to this subpart, you must keep records specified in paragraphs (c)(2)(i) or (ii) of this section, as applicable.(i) If you route emissions to a control device other than a flare, keep records of performance tests, if applicable, as specified in § 63.998(a)(2)(ii) and (4), keep records of the monitoring system and the monitored parameters, as specified in § 63.998(b) and (c), and keep records of the closed-vent system, as specified in § 63.998(d)(1). If you use a recovery device to maintain the TRE above 1.0 for a continuous process vent, keep records of monitoring parameters during the TRE index value determination, as specified in § 63.998(a)(3).(ii) If you route emissions to a flare, keep records of the flare compliance assessment, as specified in § 63.998(a)(1)(i), keep records of the pilot flame monitoring, as specified in § 63.998(a)(1)(ii) and (iii), and keep records of the closed-vent system, as specified in § 63.998(d)(1).(3) For metal HAP process vents subject to table 4 to this subpart, you must keep records specified in paragraph (c)(3)(i) or (ii) of this section, as applicable.(i) For a new source using a control device other than a baghouse and for any existing source, maintain a monitoring plan, as specified in § 63.11496(f)(3)(i), and keep records of monitoring results, as specified in § 63.11496(f)(3).(ii) For a new source using a baghouse to control metal HAP emissions, keep a site-specific monitoring plan, as specified in §§ 63.11496(f)(4) and 63.11410(g), and keep records of bag leak detection systems, as specified in §§ 63.11496(f)(4) and 63.11410(g)(4).(4) For each storage tank subject to table 5 to this subpart, you must keep records specified in paragraphs (c)(4)(i) through (vii) of this section, as applicable.(i) Keep records of the vessel dimensions, capacity, and liquid stored, as specified in § 63.1065(a).(ii) Keep records of each inspection of an internal floating roof, as specified in § 63.1065(b)(1).(iii) Keep records of each seal gap measurement for external floating roofs, as specified in § 63.1065(b)(2), and keep records of inspections of external floating roofs, as specified in § 63.1065(b)(1).(iv) If you vent emissions to a control device other than a flare, keep records of the operating plan and measured parameter values, as specified in §§ 63.985(c) and 63.998(d)(2).(v) If you vent emissions to a flare, keep records of all periods of operation during which the flare pilot flame is absent, as specified in §§ 63.987(c) and 63.998(a)(1), and keep records of closed-vent systems, as specified in § 63.998(d)(1).(vi) For periods of planned routine maintenance of a control device, keep records of the day and time at which each maintenance period begins and ends, and keep records of the type of maintenance performed, as specified in § 63.11497(b)(3).(vii) For each pressure vessel subject to the requirements of § 63.11497(f) you must keep records as specified in paragraphs (c)(4)(vii)(A) and (B) of this section.(A) The date of each performance test conducted according to § 63.11497(f)(2).(B) The record of each performance test conducted according to § 63.11497(f)(2), including the following:(1) Date each defect was detected and the instrument reading (in ppmv) during the performance test.(2) Date of the next performance test that shows the instrument reading is less than 500 ppmv and the instrument reading (in ppmv) during the performance test.(3) Start and end dates of each period after the date in paragraph (c)(4)(ix)(B)(1) of this section when the pressure vessel was completely empty.(4) Estimated emissions from each defect.(5) For each wastewater stream subject to item 2 in table 6 to this subpart, keep records of the wastewater stream identification and the disposition of the organic phase(s), as specified in item 2 to table 6 to this subpart.(6) Except as specified in paragraph (c)(11) of this section, for each large heat exchange system subject to table 8 to this subpart, you must keep records of detected leaks; the date the leak was detected; if demonstrated not to be a leak, the basis for that determination; the date of efforts to repair the leak; and the date the leak is repaired, as specified in table 8 to this subpart.(7) You must keep a record of all transferred liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) For continuous process vents subject to table 3 to this subpart, keep records of the occurrence and duration of each startup and shutdown of operation of process equipment, or of air pollution control and monitoring equipment.(9) If you are subject to the equipment leak requirements specified in § 63.11495(a)(6), then you must keep records as specified in paragraphs (c)(9)(i) through (vii) of this section instead of the records specified in paragraph (c)(1)(i) of this section.(i) Keep a list, summary description, or diagram(s) showing the location and identification number of all equipment in organic HAP service at the facility and the information in paragraphs (c)(9)(i)(A) through (D) of this section.(A) Identification of equipment designated as unsafe to monitor, difficult to monitor, unsafe to inspect, difficult to inspect, or unsafe to repair and the plan for monitoring or inspecting this equipment, as applicable.(B) Identification of the equipment in batch process units, for which you do not elect to pressure test the batch product process equipment train.(ii) For leak detection monitoring and inspections required by paragraphs § 63.11495(a)(6) (e.g., monitoring using Method 21 of appendix A-7 to part 60 of this chapter; visible, audible, or olfactory monitoring; closed vent system inspections; and batch process unit monitoring), record the date of the monitoring or inspection and include a statement of whether leaks were detected. If no leaks are detected, records of the monitoring and inspection results are not required.(iii) When each leak is detected as specified in § 63.11495(a)(6), the following information must be recorded:(A) The instrument and the equipment identification number and the operator name, initials, or identification number.(D) Maximum instrument reading measured by Method 21 of 40 CFR part 60, appendix A-7 of this chapter after it is successfully repaired or determined to be nonrepairable.(E) “Repair delayed” and the reason for the delay if a leak is not repaired within 15 calendar days after discovery of the leak.(1) You may develop a written procedure that identifies the conditions that justify a delay of repair. In such cases, reasons for delay of repair may be documented by citing the relevant sections of the written procedure.(2) If delay of repair was caused by depletion of stocked parts, there must be documentation that the spare parts were sufficiently stocked on-site before depletion and the reason for depletion.(iv) For each pressure relief device subject to the provisions in § 63.165(e), you must keep the records specified in paragraphs (c)(9)(iv)(A) through (C) of this section.(A) Records of the prevention measures implemented as required in § 63.165(e)(3)(ii).(C) For each release to the atmosphere, you must keep the records specified in paragraphs (c)(9)(iv)(C)(1) through (4) of this section.(1) The start and end time and date of each pressure release to the atmosphere.(2) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.(3) Records of the root cause analysis and corrective action analysis conducted as required in § 63.165(e)(3)(iii), including an identification of the affected facility, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under § 63.165(e)(7)(i).(4) For any corrective action analysis for which implementation of corrective actions are required in § 63.165(e)(7), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.(v) If you own or operate a batch product process and elect to pressure test the batch product process equipment train to demonstrate compliance with § 63.11495(a)(6), you are exempt from the requirements of paragraphs (c)(9)(i) through (iv) of this section. Instead, you must maintain records of the following information:(B) The dates of each pressure test required in § 63.178(b), the test pressure, and the pressure drop observed during the test.(C) When a batch product process equipment train does not pass two consecutive pressure tests, the following information must be recorded:(1) The date of each pressure test and the date of each leak repair attempt.(2) Repair methods applied in each attempt to repair the leak.(3) The reason for the delay of repair.(4) The expected date for delivery of the replacement equipment and the actual date of delivery of the replacement equipment.(5) The date of successful repair.(vi) You must maintain records of the information specified in paragraphs (c)(9)(vi)(A) through (C) of this section for closed vent systems and control devices subject to the provisions of § 63.172. The records specified in paragraph (c)(9)(vi)(A) of this section must be retained for the life of the equipment.(A) The design specifications and performance demonstrations specified in paragraphs (c)(9)(vi)(A)(1) through (4) of this section.(1) Detailed schematics, design specifications of the control device, and piping and instrumentation diagrams.(2) The dates and descriptions of any changes in the design specifications.(3) The flare design (i.e., steam-assisted, air-assisted, or non-assisted) and the results of the compliance demonstration required by subpart SS of this part.(4) A description of the parameter or parameters monitored, as required in § 63.172(e), to ensure that control devices are operated and maintained in conformance with their design and an explanation of why that parameter (or parameters) was selected for the monitoring.(B) Records of operation of closed vent systems and control devices, as specified in paragraphs (c)(9)(vi)(B)(1) through (3) of this section.(1) Dates and durations when the closed vent systems and control devices required in § 63.11495(a)(6) are not operated as designed as indicated by the monitored parameters, including periods when a flare pilot light system does not have a flame.(2) Dates and durations during which the monitoring system or monitoring device is inoperative.(3) Dates and durations of startups and shutdowns of control devices required in § 63.11495(a)(6).(C) Records of inspections of closed vent systems subject to the provisions of § 63.172, as specified in paragraphs (c)(9)(vi)(C)(1) and (2) of this section.(1) For each inspection conducted in accordance with the provisions of § 63.172(f)(1) or (2) during which leaks were detected, the information specified in paragraph (c)(9)(iii) of this section must be recorded.(2) For each flow event from a bypass line subject to the requirements in § 63.172(j), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements in § 63.11495(a)(6), you must include an estimate of the volume of gas, the concentration of organic HAP in the gas, and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(vii) If you choose to comply with the requirements of § 63.179, you must maintain the following records:(C) A description of the system used to create a negative pressure in the enclosure to ensure that all emissions are routed to the control device.(10) For each flow event from a bypass line subject to the requirements in § 63.11495(e), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements specified in §§ 63.11495 through 63.11499, you must include an estimate of the volume of gas, the concentration of organic HAP in the gas and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must keep records as specified in § 63.104(f)(3) instead of the heat exchange system records specified in paragraphs (c)(1)(ii) and (6) of this section.
Citations to §63.11501(c)(7)
-
(c) You must maintain files of all information required by this subpart for at least 5 years following the date of each occurrence according to the requirements in § 63.10(b)(1). If you are subject, you must comply with the recordkeeping and reporting requirements of § 63.10(b)(2)(iii) and (vi) through (xiv), and the applicable requirements specified in paragraphs (c)(1) through (11) of this section.(1) For each CMPU subject to this subpart, you must keep the records specified in paragraphs (c)(1)(i) through (viii) of this section.(i) Except as specified in paragraph (c)(9) of this section, records of management practice inspections, repairs, and reasons for any delay of repair, as specified in § 63.11495(a)(5).(ii) Except as specified in paragraph (c)(11) of this section, records of small heat exchange system inspections, demonstrations of indications of leaks that do not constitute leaks, repairs, and reasons for any delay in repair as specified in § 63.11495(b).(iii) If batch process vent emissions are less than 10,000 lb/yr for a CMPU, records of batch process vent emission calculations, as specified in § 63.11496(a)(1), the number of batches operated each month, as specified in § 63.11496(a)(3), and any updated emissions calculations, as specified in § 63.11496(a)(3). Alternatively, keep records of the worst-case processes or organic HAP usage, as specified in § 63.11496(a)(2) and (4), respectively.(iv) Records of all TRE calculations for continuous process vents as specified in § 63.11496(b)(2).(v) Records of metal HAP emission calculations as specified in § 63.11496(f)(1) and (2). If total uncontrolled metal HAP process vent emissions from a CMPU subject to this subpart are estimated to be less than 400 lb/yr, also keep records of either the number of batches per month or operating hours, as specified in § 63.11496(f)(2).(vi) Records identifying wastewater streams and the type of treatment they receive, as specified in table 6 to this subpart.(vii) Before April 1, 2029, records of the date, time, and duration of each malfunction of operation of process equipment, control devices, recovery devices, or continuous monitoring systems used to comply with this subpart that causes a failure to meet a standard. The record must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. After April 1, 2029, for any deviation, records of the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, and a description of the method used to estimate the emissions.(viii) Before April 1, 2029, records of actions taken during periods of malfunction to minimize emissions in accordance with § 63.11495(d), including corrective actions to restore malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of operation. After April 1, 2029, for any deviation, records of actions taken to minimize emissions in accordance with § 63.11495(d), and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) For batch process vents subject to table 2 to this subpart and continuous process vents subject to table 3 to this subpart, you must keep records specified in paragraphs (c)(2)(i) or (ii) of this section, as applicable.(i) If you route emissions to a control device other than a flare, keep records of performance tests, if applicable, as specified in § 63.998(a)(2)(ii) and (4), keep records of the monitoring system and the monitored parameters, as specified in § 63.998(b) and (c), and keep records of the closed-vent system, as specified in § 63.998(d)(1). If you use a recovery device to maintain the TRE above 1.0 for a continuous process vent, keep records of monitoring parameters during the TRE index value determination, as specified in § 63.998(a)(3).(ii) If you route emissions to a flare, keep records of the flare compliance assessment, as specified in § 63.998(a)(1)(i), keep records of the pilot flame monitoring, as specified in § 63.998(a)(1)(ii) and (iii), and keep records of the closed-vent system, as specified in § 63.998(d)(1).(3) For metal HAP process vents subject to table 4 to this subpart, you must keep records specified in paragraph (c)(3)(i) or (ii) of this section, as applicable.(i) For a new source using a control device other than a baghouse and for any existing source, maintain a monitoring plan, as specified in § 63.11496(f)(3)(i), and keep records of monitoring results, as specified in § 63.11496(f)(3).(ii) For a new source using a baghouse to control metal HAP emissions, keep a site-specific monitoring plan, as specified in §§ 63.11496(f)(4) and 63.11410(g), and keep records of bag leak detection systems, as specified in §§ 63.11496(f)(4) and 63.11410(g)(4).(4) For each storage tank subject to table 5 to this subpart, you must keep records specified in paragraphs (c)(4)(i) through (vii) of this section, as applicable.(i) Keep records of the vessel dimensions, capacity, and liquid stored, as specified in § 63.1065(a).(ii) Keep records of each inspection of an internal floating roof, as specified in § 63.1065(b)(1).(iii) Keep records of each seal gap measurement for external floating roofs, as specified in § 63.1065(b)(2), and keep records of inspections of external floating roofs, as specified in § 63.1065(b)(1).(iv) If you vent emissions to a control device other than a flare, keep records of the operating plan and measured parameter values, as specified in §§ 63.985(c) and 63.998(d)(2).(v) If you vent emissions to a flare, keep records of all periods of operation during which the flare pilot flame is absent, as specified in §§ 63.987(c) and 63.998(a)(1), and keep records of closed-vent systems, as specified in § 63.998(d)(1).(vi) For periods of planned routine maintenance of a control device, keep records of the day and time at which each maintenance period begins and ends, and keep records of the type of maintenance performed, as specified in § 63.11497(b)(3).(vii) For each pressure vessel subject to the requirements of § 63.11497(f) you must keep records as specified in paragraphs (c)(4)(vii)(A) and (B) of this section.(A) The date of each performance test conducted according to § 63.11497(f)(2).(B) The record of each performance test conducted according to § 63.11497(f)(2), including the following:(1) Date each defect was detected and the instrument reading (in ppmv) during the performance test.(2) Date of the next performance test that shows the instrument reading is less than 500 ppmv and the instrument reading (in ppmv) during the performance test.(3) Start and end dates of each period after the date in paragraph (c)(4)(ix)(B)(1) of this section when the pressure vessel was completely empty.(4) Estimated emissions from each defect.(5) For each wastewater stream subject to item 2 in table 6 to this subpart, keep records of the wastewater stream identification and the disposition of the organic phase(s), as specified in item 2 to table 6 to this subpart.(6) Except as specified in paragraph (c)(11) of this section, for each large heat exchange system subject to table 8 to this subpart, you must keep records of detected leaks; the date the leak was detected; if demonstrated not to be a leak, the basis for that determination; the date of efforts to repair the leak; and the date the leak is repaired, as specified in table 8 to this subpart.(7) You must keep a record of all transferred liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) For continuous process vents subject to table 3 to this subpart, keep records of the occurrence and duration of each startup and shutdown of operation of process equipment, or of air pollution control and monitoring equipment.(9) If you are subject to the equipment leak requirements specified in § 63.11495(a)(6), then you must keep records as specified in paragraphs (c)(9)(i) through (vii) of this section instead of the records specified in paragraph (c)(1)(i) of this section.(i) Keep a list, summary description, or diagram(s) showing the location and identification number of all equipment in organic HAP service at the facility and the information in paragraphs (c)(9)(i)(A) through (D) of this section.(A) Identification of equipment designated as unsafe to monitor, difficult to monitor, unsafe to inspect, difficult to inspect, or unsafe to repair and the plan for monitoring or inspecting this equipment, as applicable.(B) Identification of the equipment in batch process units, for which you do not elect to pressure test the batch product process equipment train.(ii) For leak detection monitoring and inspections required by paragraphs § 63.11495(a)(6) (e.g., monitoring using Method 21 of appendix A-7 to part 60 of this chapter; visible, audible, or olfactory monitoring; closed vent system inspections; and batch process unit monitoring), record the date of the monitoring or inspection and include a statement of whether leaks were detected. If no leaks are detected, records of the monitoring and inspection results are not required.(iii) When each leak is detected as specified in § 63.11495(a)(6), the following information must be recorded:(A) The instrument and the equipment identification number and the operator name, initials, or identification number.(D) Maximum instrument reading measured by Method 21 of 40 CFR part 60, appendix A-7 of this chapter after it is successfully repaired or determined to be nonrepairable.(E) “Repair delayed” and the reason for the delay if a leak is not repaired within 15 calendar days after discovery of the leak.(1) You may develop a written procedure that identifies the conditions that justify a delay of repair. In such cases, reasons for delay of repair may be documented by citing the relevant sections of the written procedure.(2) If delay of repair was caused by depletion of stocked parts, there must be documentation that the spare parts were sufficiently stocked on-site before depletion and the reason for depletion.(iv) For each pressure relief device subject to the provisions in § 63.165(e), you must keep the records specified in paragraphs (c)(9)(iv)(A) through (C) of this section.(A) Records of the prevention measures implemented as required in § 63.165(e)(3)(ii).(C) For each release to the atmosphere, you must keep the records specified in paragraphs (c)(9)(iv)(C)(1) through (4) of this section.(1) The start and end time and date of each pressure release to the atmosphere.(2) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.(3) Records of the root cause analysis and corrective action analysis conducted as required in § 63.165(e)(3)(iii), including an identification of the affected facility, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under § 63.165(e)(7)(i).(4) For any corrective action analysis for which implementation of corrective actions are required in § 63.165(e)(7), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.(v) If you own or operate a batch product process and elect to pressure test the batch product process equipment train to demonstrate compliance with § 63.11495(a)(6), you are exempt from the requirements of paragraphs (c)(9)(i) through (iv) of this section. Instead, you must maintain records of the following information:(B) The dates of each pressure test required in § 63.178(b), the test pressure, and the pressure drop observed during the test.(C) When a batch product process equipment train does not pass two consecutive pressure tests, the following information must be recorded:(1) The date of each pressure test and the date of each leak repair attempt.(2) Repair methods applied in each attempt to repair the leak.(3) The reason for the delay of repair.(4) The expected date for delivery of the replacement equipment and the actual date of delivery of the replacement equipment.(5) The date of successful repair.(vi) You must maintain records of the information specified in paragraphs (c)(9)(vi)(A) through (C) of this section for closed vent systems and control devices subject to the provisions of § 63.172. The records specified in paragraph (c)(9)(vi)(A) of this section must be retained for the life of the equipment.(A) The design specifications and performance demonstrations specified in paragraphs (c)(9)(vi)(A)(1) through (4) of this section.(1) Detailed schematics, design specifications of the control device, and piping and instrumentation diagrams.(2) The dates and descriptions of any changes in the design specifications.(3) The flare design (i.e., steam-assisted, air-assisted, or non-assisted) and the results of the compliance demonstration required by subpart SS of this part.(4) A description of the parameter or parameters monitored, as required in § 63.172(e), to ensure that control devices are operated and maintained in conformance with their design and an explanation of why that parameter (or parameters) was selected for the monitoring.(B) Records of operation of closed vent systems and control devices, as specified in paragraphs (c)(9)(vi)(B)(1) through (3) of this section.(1) Dates and durations when the closed vent systems and control devices required in § 63.11495(a)(6) are not operated as designed as indicated by the monitored parameters, including periods when a flare pilot light system does not have a flame.(2) Dates and durations during which the monitoring system or monitoring device is inoperative.(3) Dates and durations of startups and shutdowns of control devices required in § 63.11495(a)(6).(C) Records of inspections of closed vent systems subject to the provisions of § 63.172, as specified in paragraphs (c)(9)(vi)(C)(1) and (2) of this section.(1) For each inspection conducted in accordance with the provisions of § 63.172(f)(1) or (2) during which leaks were detected, the information specified in paragraph (c)(9)(iii) of this section must be recorded.(2) For each flow event from a bypass line subject to the requirements in § 63.172(j), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements in § 63.11495(a)(6), you must include an estimate of the volume of gas, the concentration of organic HAP in the gas, and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(vii) If you choose to comply with the requirements of § 63.179, you must maintain the following records:(C) A description of the system used to create a negative pressure in the enclosure to ensure that all emissions are routed to the control device.(10) For each flow event from a bypass line subject to the requirements in § 63.11495(e), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements specified in §§ 63.11495 through 63.11499, you must include an estimate of the volume of gas, the concentration of organic HAP in the gas and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must keep records as specified in § 63.104(f)(3) instead of the heat exchange system records specified in paragraphs (c)(1)(ii) and (6) of this section.
Citations to §63.11501(c)(8)
-
(c) You must maintain files of all information required by this subpart for at least 5 years following the date of each occurrence according to the requirements in § 63.10(b)(1). If you are subject, you must comply with the recordkeeping and reporting requirements of § 63.10(b)(2)(iii) and (vi) through (xiv), and the applicable requirements specified in paragraphs (c)(1) through (11) of this section.(1) For each CMPU subject to this subpart, you must keep the records specified in paragraphs (c)(1)(i) through (viii) of this section.(i) Except as specified in paragraph (c)(9) of this section, records of management practice inspections, repairs, and reasons for any delay of repair, as specified in § 63.11495(a)(5).(ii) Except as specified in paragraph (c)(11) of this section, records of small heat exchange system inspections, demonstrations of indications of leaks that do not constitute leaks, repairs, and reasons for any delay in repair as specified in § 63.11495(b).(iii) If batch process vent emissions are less than 10,000 lb/yr for a CMPU, records of batch process vent emission calculations, as specified in § 63.11496(a)(1), the number of batches operated each month, as specified in § 63.11496(a)(3), and any updated emissions calculations, as specified in § 63.11496(a)(3). Alternatively, keep records of the worst-case processes or organic HAP usage, as specified in § 63.11496(a)(2) and (4), respectively.(iv) Records of all TRE calculations for continuous process vents as specified in § 63.11496(b)(2).(v) Records of metal HAP emission calculations as specified in § 63.11496(f)(1) and (2). If total uncontrolled metal HAP process vent emissions from a CMPU subject to this subpart are estimated to be less than 400 lb/yr, also keep records of either the number of batches per month or operating hours, as specified in § 63.11496(f)(2).(vi) Records identifying wastewater streams and the type of treatment they receive, as specified in table 6 to this subpart.(vii) Before April 1, 2029, records of the date, time, and duration of each malfunction of operation of process equipment, control devices, recovery devices, or continuous monitoring systems used to comply with this subpart that causes a failure to meet a standard. The record must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. After April 1, 2029, for any deviation, records of the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, and a description of the method used to estimate the emissions.(viii) Before April 1, 2029, records of actions taken during periods of malfunction to minimize emissions in accordance with § 63.11495(d), including corrective actions to restore malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of operation. After April 1, 2029, for any deviation, records of actions taken to minimize emissions in accordance with § 63.11495(d), and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) For batch process vents subject to table 2 to this subpart and continuous process vents subject to table 3 to this subpart, you must keep records specified in paragraphs (c)(2)(i) or (ii) of this section, as applicable.(i) If you route emissions to a control device other than a flare, keep records of performance tests, if applicable, as specified in § 63.998(a)(2)(ii) and (4), keep records of the monitoring system and the monitored parameters, as specified in § 63.998(b) and (c), and keep records of the closed-vent system, as specified in § 63.998(d)(1). If you use a recovery device to maintain the TRE above 1.0 for a continuous process vent, keep records of monitoring parameters during the TRE index value determination, as specified in § 63.998(a)(3).(ii) If you route emissions to a flare, keep records of the flare compliance assessment, as specified in § 63.998(a)(1)(i), keep records of the pilot flame monitoring, as specified in § 63.998(a)(1)(ii) and (iii), and keep records of the closed-vent system, as specified in § 63.998(d)(1).(3) For metal HAP process vents subject to table 4 to this subpart, you must keep records specified in paragraph (c)(3)(i) or (ii) of this section, as applicable.(i) For a new source using a control device other than a baghouse and for any existing source, maintain a monitoring plan, as specified in § 63.11496(f)(3)(i), and keep records of monitoring results, as specified in § 63.11496(f)(3).(ii) For a new source using a baghouse to control metal HAP emissions, keep a site-specific monitoring plan, as specified in §§ 63.11496(f)(4) and 63.11410(g), and keep records of bag leak detection systems, as specified in §§ 63.11496(f)(4) and 63.11410(g)(4).(4) For each storage tank subject to table 5 to this subpart, you must keep records specified in paragraphs (c)(4)(i) through (vii) of this section, as applicable.(i) Keep records of the vessel dimensions, capacity, and liquid stored, as specified in § 63.1065(a).(ii) Keep records of each inspection of an internal floating roof, as specified in § 63.1065(b)(1).(iii) Keep records of each seal gap measurement for external floating roofs, as specified in § 63.1065(b)(2), and keep records of inspections of external floating roofs, as specified in § 63.1065(b)(1).(iv) If you vent emissions to a control device other than a flare, keep records of the operating plan and measured parameter values, as specified in §§ 63.985(c) and 63.998(d)(2).(v) If you vent emissions to a flare, keep records of all periods of operation during which the flare pilot flame is absent, as specified in §§ 63.987(c) and 63.998(a)(1), and keep records of closed-vent systems, as specified in § 63.998(d)(1).(vi) For periods of planned routine maintenance of a control device, keep records of the day and time at which each maintenance period begins and ends, and keep records of the type of maintenance performed, as specified in § 63.11497(b)(3).(vii) For each pressure vessel subject to the requirements of § 63.11497(f) you must keep records as specified in paragraphs (c)(4)(vii)(A) and (B) of this section.(A) The date of each performance test conducted according to § 63.11497(f)(2).(B) The record of each performance test conducted according to § 63.11497(f)(2), including the following:(1) Date each defect was detected and the instrument reading (in ppmv) during the performance test.(2) Date of the next performance test that shows the instrument reading is less than 500 ppmv and the instrument reading (in ppmv) during the performance test.(3) Start and end dates of each period after the date in paragraph (c)(4)(ix)(B)(1) of this section when the pressure vessel was completely empty.(4) Estimated emissions from each defect.(5) For each wastewater stream subject to item 2 in table 6 to this subpart, keep records of the wastewater stream identification and the disposition of the organic phase(s), as specified in item 2 to table 6 to this subpart.(6) Except as specified in paragraph (c)(11) of this section, for each large heat exchange system subject to table 8 to this subpart, you must keep records of detected leaks; the date the leak was detected; if demonstrated not to be a leak, the basis for that determination; the date of efforts to repair the leak; and the date the leak is repaired, as specified in table 8 to this subpart.(7) You must keep a record of all transferred liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) For continuous process vents subject to table 3 to this subpart, keep records of the occurrence and duration of each startup and shutdown of operation of process equipment, or of air pollution control and monitoring equipment.(9) If you are subject to the equipment leak requirements specified in § 63.11495(a)(6), then you must keep records as specified in paragraphs (c)(9)(i) through (vii) of this section instead of the records specified in paragraph (c)(1)(i) of this section.(i) Keep a list, summary description, or diagram(s) showing the location and identification number of all equipment in organic HAP service at the facility and the information in paragraphs (c)(9)(i)(A) through (D) of this section.(A) Identification of equipment designated as unsafe to monitor, difficult to monitor, unsafe to inspect, difficult to inspect, or unsafe to repair and the plan for monitoring or inspecting this equipment, as applicable.(B) Identification of the equipment in batch process units, for which you do not elect to pressure test the batch product process equipment train.(ii) For leak detection monitoring and inspections required by paragraphs § 63.11495(a)(6) (e.g., monitoring using Method 21 of appendix A-7 to part 60 of this chapter; visible, audible, or olfactory monitoring; closed vent system inspections; and batch process unit monitoring), record the date of the monitoring or inspection and include a statement of whether leaks were detected. If no leaks are detected, records of the monitoring and inspection results are not required.(iii) When each leak is detected as specified in § 63.11495(a)(6), the following information must be recorded:(A) The instrument and the equipment identification number and the operator name, initials, or identification number.(D) Maximum instrument reading measured by Method 21 of 40 CFR part 60, appendix A-7 of this chapter after it is successfully repaired or determined to be nonrepairable.(E) “Repair delayed” and the reason for the delay if a leak is not repaired within 15 calendar days after discovery of the leak.(1) You may develop a written procedure that identifies the conditions that justify a delay of repair. In such cases, reasons for delay of repair may be documented by citing the relevant sections of the written procedure.(2) If delay of repair was caused by depletion of stocked parts, there must be documentation that the spare parts were sufficiently stocked on-site before depletion and the reason for depletion.(iv) For each pressure relief device subject to the provisions in § 63.165(e), you must keep the records specified in paragraphs (c)(9)(iv)(A) through (C) of this section.(A) Records of the prevention measures implemented as required in § 63.165(e)(3)(ii).(C) For each release to the atmosphere, you must keep the records specified in paragraphs (c)(9)(iv)(C)(1) through (4) of this section.(1) The start and end time and date of each pressure release to the atmosphere.(2) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.(3) Records of the root cause analysis and corrective action analysis conducted as required in § 63.165(e)(3)(iii), including an identification of the affected facility, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under § 63.165(e)(7)(i).(4) For any corrective action analysis for which implementation of corrective actions are required in § 63.165(e)(7), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.(v) If you own or operate a batch product process and elect to pressure test the batch product process equipment train to demonstrate compliance with § 63.11495(a)(6), you are exempt from the requirements of paragraphs (c)(9)(i) through (iv) of this section. Instead, you must maintain records of the following information:(B) The dates of each pressure test required in § 63.178(b), the test pressure, and the pressure drop observed during the test.(C) When a batch product process equipment train does not pass two consecutive pressure tests, the following information must be recorded:(1) The date of each pressure test and the date of each leak repair attempt.(2) Repair methods applied in each attempt to repair the leak.(3) The reason for the delay of repair.(4) The expected date for delivery of the replacement equipment and the actual date of delivery of the replacement equipment.(5) The date of successful repair.(vi) You must maintain records of the information specified in paragraphs (c)(9)(vi)(A) through (C) of this section for closed vent systems and control devices subject to the provisions of § 63.172. The records specified in paragraph (c)(9)(vi)(A) of this section must be retained for the life of the equipment.(A) The design specifications and performance demonstrations specified in paragraphs (c)(9)(vi)(A)(1) through (4) of this section.(1) Detailed schematics, design specifications of the control device, and piping and instrumentation diagrams.(2) The dates and descriptions of any changes in the design specifications.(3) The flare design (i.e., steam-assisted, air-assisted, or non-assisted) and the results of the compliance demonstration required by subpart SS of this part.(4) A description of the parameter or parameters monitored, as required in § 63.172(e), to ensure that control devices are operated and maintained in conformance with their design and an explanation of why that parameter (or parameters) was selected for the monitoring.(B) Records of operation of closed vent systems and control devices, as specified in paragraphs (c)(9)(vi)(B)(1) through (3) of this section.(1) Dates and durations when the closed vent systems and control devices required in § 63.11495(a)(6) are not operated as designed as indicated by the monitored parameters, including periods when a flare pilot light system does not have a flame.(2) Dates and durations during which the monitoring system or monitoring device is inoperative.(3) Dates and durations of startups and shutdowns of control devices required in § 63.11495(a)(6).(C) Records of inspections of closed vent systems subject to the provisions of § 63.172, as specified in paragraphs (c)(9)(vi)(C)(1) and (2) of this section.(1) For each inspection conducted in accordance with the provisions of § 63.172(f)(1) or (2) during which leaks were detected, the information specified in paragraph (c)(9)(iii) of this section must be recorded.(2) For each flow event from a bypass line subject to the requirements in § 63.172(j), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements in § 63.11495(a)(6), you must include an estimate of the volume of gas, the concentration of organic HAP in the gas, and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(vii) If you choose to comply with the requirements of § 63.179, you must maintain the following records:(C) A description of the system used to create a negative pressure in the enclosure to ensure that all emissions are routed to the control device.(10) For each flow event from a bypass line subject to the requirements in § 63.11495(e), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements specified in §§ 63.11495 through 63.11499, you must include an estimate of the volume of gas, the concentration of organic HAP in the gas and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must keep records as specified in § 63.104(f)(3) instead of the heat exchange system records specified in paragraphs (c)(1)(ii) and (6) of this section.
Citations to §63.11501(c)(9)
-
(B) Substitute “§ 63.181” with “§ 63.11501(c)(9)”.
-
(c) You must maintain files of all information required by this subpart for at least 5 years following the date of each occurrence according to the requirements in § 63.10(b)(1). If you are subject, you must comply with the recordkeeping and reporting requirements of § 63.10(b)(2)(iii) and (vi) through (xiv), and the applicable requirements specified in paragraphs (c)(1) through (11) of this section.(1) For each CMPU subject to this subpart, you must keep the records specified in paragraphs (c)(1)(i) through (viii) of this section.(i) Except as specified in paragraph (c)(9) of this section, records of management practice inspections, repairs, and reasons for any delay of repair, as specified in § 63.11495(a)(5).(ii) Except as specified in paragraph (c)(11) of this section, records of small heat exchange system inspections, demonstrations of indications of leaks that do not constitute leaks, repairs, and reasons for any delay in repair as specified in § 63.11495(b).(iii) If batch process vent emissions are less than 10,000 lb/yr for a CMPU, records of batch process vent emission calculations, as specified in § 63.11496(a)(1), the number of batches operated each month, as specified in § 63.11496(a)(3), and any updated emissions calculations, as specified in § 63.11496(a)(3). Alternatively, keep records of the worst-case processes or organic HAP usage, as specified in § 63.11496(a)(2) and (4), respectively.(iv) Records of all TRE calculations for continuous process vents as specified in § 63.11496(b)(2).(v) Records of metal HAP emission calculations as specified in § 63.11496(f)(1) and (2). If total uncontrolled metal HAP process vent emissions from a CMPU subject to this subpart are estimated to be less than 400 lb/yr, also keep records of either the number of batches per month or operating hours, as specified in § 63.11496(f)(2).(vi) Records identifying wastewater streams and the type of treatment they receive, as specified in table 6 to this subpart.(vii) Before April 1, 2029, records of the date, time, and duration of each malfunction of operation of process equipment, control devices, recovery devices, or continuous monitoring systems used to comply with this subpart that causes a failure to meet a standard. The record must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. After April 1, 2029, for any deviation, records of the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, and a description of the method used to estimate the emissions.(viii) Before April 1, 2029, records of actions taken during periods of malfunction to minimize emissions in accordance with § 63.11495(d), including corrective actions to restore malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of operation. After April 1, 2029, for any deviation, records of actions taken to minimize emissions in accordance with § 63.11495(d), and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) For batch process vents subject to table 2 to this subpart and continuous process vents subject to table 3 to this subpart, you must keep records specified in paragraphs (c)(2)(i) or (ii) of this section, as applicable.(i) If you route emissions to a control device other than a flare, keep records of performance tests, if applicable, as specified in § 63.998(a)(2)(ii) and (4), keep records of the monitoring system and the monitored parameters, as specified in § 63.998(b) and (c), and keep records of the closed-vent system, as specified in § 63.998(d)(1). If you use a recovery device to maintain the TRE above 1.0 for a continuous process vent, keep records of monitoring parameters during the TRE index value determination, as specified in § 63.998(a)(3).(ii) If you route emissions to a flare, keep records of the flare compliance assessment, as specified in § 63.998(a)(1)(i), keep records of the pilot flame monitoring, as specified in § 63.998(a)(1)(ii) and (iii), and keep records of the closed-vent system, as specified in § 63.998(d)(1).(3) For metal HAP process vents subject to table 4 to this subpart, you must keep records specified in paragraph (c)(3)(i) or (ii) of this section, as applicable.(i) For a new source using a control device other than a baghouse and for any existing source, maintain a monitoring plan, as specified in § 63.11496(f)(3)(i), and keep records of monitoring results, as specified in § 63.11496(f)(3).(ii) For a new source using a baghouse to control metal HAP emissions, keep a site-specific monitoring plan, as specified in §§ 63.11496(f)(4) and 63.11410(g), and keep records of bag leak detection systems, as specified in §§ 63.11496(f)(4) and 63.11410(g)(4).(4) For each storage tank subject to table 5 to this subpart, you must keep records specified in paragraphs (c)(4)(i) through (vii) of this section, as applicable.(i) Keep records of the vessel dimensions, capacity, and liquid stored, as specified in § 63.1065(a).(ii) Keep records of each inspection of an internal floating roof, as specified in § 63.1065(b)(1).(iii) Keep records of each seal gap measurement for external floating roofs, as specified in § 63.1065(b)(2), and keep records of inspections of external floating roofs, as specified in § 63.1065(b)(1).(iv) If you vent emissions to a control device other than a flare, keep records of the operating plan and measured parameter values, as specified in §§ 63.985(c) and 63.998(d)(2).(v) If you vent emissions to a flare, keep records of all periods of operation during which the flare pilot flame is absent, as specified in §§ 63.987(c) and 63.998(a)(1), and keep records of closed-vent systems, as specified in § 63.998(d)(1).(vi) For periods of planned routine maintenance of a control device, keep records of the day and time at which each maintenance period begins and ends, and keep records of the type of maintenance performed, as specified in § 63.11497(b)(3).(vii) For each pressure vessel subject to the requirements of § 63.11497(f) you must keep records as specified in paragraphs (c)(4)(vii)(A) and (B) of this section.(A) The date of each performance test conducted according to § 63.11497(f)(2).(B) The record of each performance test conducted according to § 63.11497(f)(2), including the following:(1) Date each defect was detected and the instrument reading (in ppmv) during the performance test.(2) Date of the next performance test that shows the instrument reading is less than 500 ppmv and the instrument reading (in ppmv) during the performance test.(3) Start and end dates of each period after the date in paragraph (c)(4)(ix)(B)(1) of this section when the pressure vessel was completely empty.(4) Estimated emissions from each defect.(5) For each wastewater stream subject to item 2 in table 6 to this subpart, keep records of the wastewater stream identification and the disposition of the organic phase(s), as specified in item 2 to table 6 to this subpart.(6) Except as specified in paragraph (c)(11) of this section, for each large heat exchange system subject to table 8 to this subpart, you must keep records of detected leaks; the date the leak was detected; if demonstrated not to be a leak, the basis for that determination; the date of efforts to repair the leak; and the date the leak is repaired, as specified in table 8 to this subpart.(7) You must keep a record of all transferred liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) For continuous process vents subject to table 3 to this subpart, keep records of the occurrence and duration of each startup and shutdown of operation of process equipment, or of air pollution control and monitoring equipment.(9) If you are subject to the equipment leak requirements specified in § 63.11495(a)(6), then you must keep records as specified in paragraphs (c)(9)(i) through (vii) of this section instead of the records specified in paragraph (c)(1)(i) of this section.(i) Keep a list, summary description, or diagram(s) showing the location and identification number of all equipment in organic HAP service at the facility and the information in paragraphs (c)(9)(i)(A) through (D) of this section.(A) Identification of equipment designated as unsafe to monitor, difficult to monitor, unsafe to inspect, difficult to inspect, or unsafe to repair and the plan for monitoring or inspecting this equipment, as applicable.(B) Identification of the equipment in batch process units, for which you do not elect to pressure test the batch product process equipment train.(ii) For leak detection monitoring and inspections required by paragraphs § 63.11495(a)(6) (e.g., monitoring using Method 21 of appendix A-7 to part 60 of this chapter; visible, audible, or olfactory monitoring; closed vent system inspections; and batch process unit monitoring), record the date of the monitoring or inspection and include a statement of whether leaks were detected. If no leaks are detected, records of the monitoring and inspection results are not required.(iii) When each leak is detected as specified in § 63.11495(a)(6), the following information must be recorded:(A) The instrument and the equipment identification number and the operator name, initials, or identification number.(D) Maximum instrument reading measured by Method 21 of 40 CFR part 60, appendix A-7 of this chapter after it is successfully repaired or determined to be nonrepairable.(E) “Repair delayed” and the reason for the delay if a leak is not repaired within 15 calendar days after discovery of the leak.(1) You may develop a written procedure that identifies the conditions that justify a delay of repair. In such cases, reasons for delay of repair may be documented by citing the relevant sections of the written procedure.(2) If delay of repair was caused by depletion of stocked parts, there must be documentation that the spare parts were sufficiently stocked on-site before depletion and the reason for depletion.(iv) For each pressure relief device subject to the provisions in § 63.165(e), you must keep the records specified in paragraphs (c)(9)(iv)(A) through (C) of this section.(A) Records of the prevention measures implemented as required in § 63.165(e)(3)(ii).(C) For each release to the atmosphere, you must keep the records specified in paragraphs (c)(9)(iv)(C)(1) through (4) of this section.(1) The start and end time and date of each pressure release to the atmosphere.(2) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.(3) Records of the root cause analysis and corrective action analysis conducted as required in § 63.165(e)(3)(iii), including an identification of the affected facility, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under § 63.165(e)(7)(i).(4) For any corrective action analysis for which implementation of corrective actions are required in § 63.165(e)(7), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.(v) If you own or operate a batch product process and elect to pressure test the batch product process equipment train to demonstrate compliance with § 63.11495(a)(6), you are exempt from the requirements of paragraphs (c)(9)(i) through (iv) of this section. Instead, you must maintain records of the following information:(B) The dates of each pressure test required in § 63.178(b), the test pressure, and the pressure drop observed during the test.(C) When a batch product process equipment train does not pass two consecutive pressure tests, the following information must be recorded:(1) The date of each pressure test and the date of each leak repair attempt.(2) Repair methods applied in each attempt to repair the leak.(3) The reason for the delay of repair.(4) The expected date for delivery of the replacement equipment and the actual date of delivery of the replacement equipment.(5) The date of successful repair.(vi) You must maintain records of the information specified in paragraphs (c)(9)(vi)(A) through (C) of this section for closed vent systems and control devices subject to the provisions of § 63.172. The records specified in paragraph (c)(9)(vi)(A) of this section must be retained for the life of the equipment.(A) The design specifications and performance demonstrations specified in paragraphs (c)(9)(vi)(A)(1) through (4) of this section.(1) Detailed schematics, design specifications of the control device, and piping and instrumentation diagrams.(2) The dates and descriptions of any changes in the design specifications.(3) The flare design (i.e., steam-assisted, air-assisted, or non-assisted) and the results of the compliance demonstration required by subpart SS of this part.(4) A description of the parameter or parameters monitored, as required in § 63.172(e), to ensure that control devices are operated and maintained in conformance with their design and an explanation of why that parameter (or parameters) was selected for the monitoring.(B) Records of operation of closed vent systems and control devices, as specified in paragraphs (c)(9)(vi)(B)(1) through (3) of this section.(1) Dates and durations when the closed vent systems and control devices required in § 63.11495(a)(6) are not operated as designed as indicated by the monitored parameters, including periods when a flare pilot light system does not have a flame.(2) Dates and durations during which the monitoring system or monitoring device is inoperative.(3) Dates and durations of startups and shutdowns of control devices required in § 63.11495(a)(6).(C) Records of inspections of closed vent systems subject to the provisions of § 63.172, as specified in paragraphs (c)(9)(vi)(C)(1) and (2) of this section.(1) For each inspection conducted in accordance with the provisions of § 63.172(f)(1) or (2) during which leaks were detected, the information specified in paragraph (c)(9)(iii) of this section must be recorded.(2) For each flow event from a bypass line subject to the requirements in § 63.172(j), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements in § 63.11495(a)(6), you must include an estimate of the volume of gas, the concentration of organic HAP in the gas, and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(vii) If you choose to comply with the requirements of § 63.179, you must maintain the following records:(C) A description of the system used to create a negative pressure in the enclosure to ensure that all emissions are routed to the control device.(10) For each flow event from a bypass line subject to the requirements in § 63.11495(e), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements specified in §§ 63.11495 through 63.11499, you must include an estimate of the volume of gas, the concentration of organic HAP in the gas and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must keep records as specified in § 63.104(f)(3) instead of the heat exchange system records specified in paragraphs (c)(1)(ii) and (6) of this section.
Citations to §63.11501(c)(9)(i)
-
(9) If you are subject to the equipment leak requirements specified in § 63.11495(a)(6), then you must keep records as specified in paragraphs (c)(9)(i) through (vii) of this section instead of the records specified in paragraph (c)(1)(i) of this section.(i) Keep a list, summary description, or diagram(s) showing the location and identification number of all equipment in organic HAP service at the facility and the information in paragraphs (c)(9)(i)(A) through (D) of this section.(A) Identification of equipment designated as unsafe to monitor, difficult to monitor, unsafe to inspect, difficult to inspect, or unsafe to repair and the plan for monitoring or inspecting this equipment, as applicable.(B) Identification of the equipment in batch process units, for which you do not elect to pressure test the batch product process equipment train.(ii) For leak detection monitoring and inspections required by paragraphs § 63.11495(a)(6) (e.g., monitoring using Method 21 of appendix A-7 to part 60 of this chapter; visible, audible, or olfactory monitoring; closed vent system inspections; and batch process unit monitoring), record the date of the monitoring or inspection and include a statement of whether leaks were detected. If no leaks are detected, records of the monitoring and inspection results are not required.(iii) When each leak is detected as specified in § 63.11495(a)(6), the following information must be recorded:(A) The instrument and the equipment identification number and the operator name, initials, or identification number.(D) Maximum instrument reading measured by Method 21 of 40 CFR part 60, appendix A-7 of this chapter after it is successfully repaired or determined to be nonrepairable.(E) “Repair delayed” and the reason for the delay if a leak is not repaired within 15 calendar days after discovery of the leak.(1) You may develop a written procedure that identifies the conditions that justify a delay of repair. In such cases, reasons for delay of repair may be documented by citing the relevant sections of the written procedure.(2) If delay of repair was caused by depletion of stocked parts, there must be documentation that the spare parts were sufficiently stocked on-site before depletion and the reason for depletion.(iv) For each pressure relief device subject to the provisions in § 63.165(e), you must keep the records specified in paragraphs (c)(9)(iv)(A) through (C) of this section.(A) Records of the prevention measures implemented as required in § 63.165(e)(3)(ii).(C) For each release to the atmosphere, you must keep the records specified in paragraphs (c)(9)(iv)(C)(1) through (4) of this section.(1) The start and end time and date of each pressure release to the atmosphere.(2) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.(3) Records of the root cause analysis and corrective action analysis conducted as required in § 63.165(e)(3)(iii), including an identification of the affected facility, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under § 63.165(e)(7)(i).(4) For any corrective action analysis for which implementation of corrective actions are required in § 63.165(e)(7), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.(v) If you own or operate a batch product process and elect to pressure test the batch product process equipment train to demonstrate compliance with § 63.11495(a)(6), you are exempt from the requirements of paragraphs (c)(9)(i) through (iv) of this section. Instead, you must maintain records of the following information:(B) The dates of each pressure test required in § 63.178(b), the test pressure, and the pressure drop observed during the test.(C) When a batch product process equipment train does not pass two consecutive pressure tests, the following information must be recorded:(1) The date of each pressure test and the date of each leak repair attempt.(2) Repair methods applied in each attempt to repair the leak.(3) The reason for the delay of repair.(4) The expected date for delivery of the replacement equipment and the actual date of delivery of the replacement equipment.(5) The date of successful repair.(vi) You must maintain records of the information specified in paragraphs (c)(9)(vi)(A) through (C) of this section for closed vent systems and control devices subject to the provisions of § 63.172. The records specified in paragraph (c)(9)(vi)(A) of this section must be retained for the life of the equipment.(A) The design specifications and performance demonstrations specified in paragraphs (c)(9)(vi)(A)(1) through (4) of this section.(1) Detailed schematics, design specifications of the control device, and piping and instrumentation diagrams.(2) The dates and descriptions of any changes in the design specifications.(3) The flare design (i.e., steam-assisted, air-assisted, or non-assisted) and the results of the compliance demonstration required by subpart SS of this part.(4) A description of the parameter or parameters monitored, as required in § 63.172(e), to ensure that control devices are operated and maintained in conformance with their design and an explanation of why that parameter (or parameters) was selected for the monitoring.(B) Records of operation of closed vent systems and control devices, as specified in paragraphs (c)(9)(vi)(B)(1) through (3) of this section.(1) Dates and durations when the closed vent systems and control devices required in § 63.11495(a)(6) are not operated as designed as indicated by the monitored parameters, including periods when a flare pilot light system does not have a flame.(2) Dates and durations during which the monitoring system or monitoring device is inoperative.(3) Dates and durations of startups and shutdowns of control devices required in § 63.11495(a)(6).(C) Records of inspections of closed vent systems subject to the provisions of § 63.172, as specified in paragraphs (c)(9)(vi)(C)(1) and (2) of this section.(1) For each inspection conducted in accordance with the provisions of § 63.172(f)(1) or (2) during which leaks were detected, the information specified in paragraph (c)(9)(iii) of this section must be recorded.(2) For each flow event from a bypass line subject to the requirements in § 63.172(j), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements in § 63.11495(a)(6), you must include an estimate of the volume of gas, the concentration of organic HAP in the gas, and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(vii) If you choose to comply with the requirements of § 63.179, you must maintain the following records:(C) A description of the system used to create a negative pressure in the enclosure to ensure that all emissions are routed to the control device.
Citations to §63.11501(c)(9)(i)(A)
-
(i) Keep a list, summary description, or diagram(s) showing the location and identification number of all equipment in organic HAP service at the facility and the information in paragraphs (c)(9)(i)(A) through (D) of this section.(A) Identification of equipment designated as unsafe to monitor, difficult to monitor, unsafe to inspect, difficult to inspect, or unsafe to repair and the plan for monitoring or inspecting this equipment, as applicable.(B) Identification of the equipment in batch process units, for which you do not elect to pressure test the batch product process equipment train.
Citations to §63.11501(c)(9)(i)(B)
-
(i) Keep a list, summary description, or diagram(s) showing the location and identification number of all equipment in organic HAP service at the facility and the information in paragraphs (c)(9)(i)(A) through (D) of this section.(A) Identification of equipment designated as unsafe to monitor, difficult to monitor, unsafe to inspect, difficult to inspect, or unsafe to repair and the plan for monitoring or inspecting this equipment, as applicable.(B) Identification of the equipment in batch process units, for which you do not elect to pressure test the batch product process equipment train.
Citations to §63.11501(c)(9)(i)(C)
-
(i) Keep a list, summary description, or diagram(s) showing the location and identification number of all equipment in organic HAP service at the facility and the information in paragraphs (c)(9)(i)(A) through (D) of this section.(A) Identification of equipment designated as unsafe to monitor, difficult to monitor, unsafe to inspect, difficult to inspect, or unsafe to repair and the plan for monitoring or inspecting this equipment, as applicable.(B) Identification of the equipment in batch process units, for which you do not elect to pressure test the batch product process equipment train.
Citations to §63.11501(c)(9)(i)(D)
-
(6) Beginning no later than the compliance dates specified in § 63.11494(i) for equipment in organic HAP service, as determined by § 63.180(d), paragraphs (a)(3) through (5) of this section no longer apply. Instead, you must comply with the requirements specified in paragraphs (a)(6)(i) through (xiv) of this section. Equipment that is in vacuum service is excluded from the requirements of this paragraph (a)(6). Equipment that is in organic HAP service less than 300 hours per calendar year is excluded from the requirements of this paragraph (a)(6) if it is identified as required in § 63.11501(c)(9)(i)(D).(i) Except as specified in paragraph (a)(6)(ii) of this section, conduct leak detection monitoring annually for all pumps in light liquid service, valves in gas/vapor service and in light liquid service, and connectors in gas/vapor service and in light liquid service as specified in paragraphs (a)(6)(i)(A) through (C) of this section.(A) Use the method specified in § 63.180(b)(1) through (3).(B) The calibration gases must be zero air (less than 10 ppm of hydrocarbon in air); and methane and air at a concentration of 10,000 ppm methane. At the end of each monitoring day, check the instrument using the same calibration gas that was used to calibrate the instrument before use. Follow the procedures specified in Method 21 of 40 CFR part 60, appendix A-7, section 10.1, except do not adjust the meter readout to correspond to the calibration gas value. If multiple scales are used, record the instrument reading for each scale used. Divide the arithmetic difference of the initial and post-test calibration response by the corresponding calibration gas value for each scale and multiply by 100 to express the calibration drift as a percentage. If a calibration drift assessment shows a negative drift of more than 10 percent, then re-monitor all equipment monitored since the last calibration with instrument readings between the leak definition and the leak definition multiplied by (100 minus the percent of negative drift) divided by 100. If any calibration drift assessment shows a positive drift of more than 10 percent from the initial calibration value, then, at your discretion, all equipment with instrument readings above the leak definition and below the leak definition multiplied by (100 plus the percent of positive drift) divided by 100 monitored since the last calibration may be re-monitored.(C) When a leak is detected, the following requirements apply:(1) Clearly identify the leaking equipment. A weatherproof and readily visible identification, marked with the equipment identification number, must be attached to the leaking equipment. The identification on the equipment may be removed after it is repaired.(2) A first attempt at repair must be made no later than 5 calendar days after the leak is detected.(3) The piece of equipment must be repaired as soon as practicable, but no later than 15 calendar days after the leak is detected, except as provided in paragraph (a)(6)(viii) of this section.(4) The leak is repaired when instrument re-monitoring of the equipment does not detect a leak.(5) It is a deviation to fail to take action to repair the leaks within the specified time. If action is taken to repair the leaks within the specified time, failure of that action to successfully repair the leak is not a deviation. However, if the repairs are unsuccessful, a leak is detected and you must take further action as required by applicable provisions of this paragraph (a)(6).(ii) The following types of equipment are exempt from the monitoring requirements specified in paragraph (a)(6)(i) of this section if the equipment meets one of the requirements in paragraphs (a)(6)(ii)(A) through (E) of this section.(A) Any pump in light liquid service, valve in gas/vapor service or light liquid service, or connector in gas/vapor service or light liquid service that is designated as unsafe-to-monitor if:(1) You determine that the pump, valve, or connector is unsafe to monitor because monitoring personnel would be exposed to an immediate danger as a consequence of complying with paragraph (a)(6)(i) of this section; and(2) You have a written plan that requires monitoring of the pump, valve, or connector as frequently as practical during safe-to-monitor times, but not more frequently than the annual leak detection monitoring.(B) Any pump in light liquid service if it meets one of the requirements in § 63.163(e)(1) through (6), (f), or (g). If the pump is located within the boundary of an unmanned plant site then it is exempt from the weekly visual inspection requirement of § 63.163(e)(4), and the daily requirements of § 63.163(e)(5), provided that each pump is visually inspected as often as practicable and at least monthly.(C) Any valve in gas/vapor service or light liquid service that is designated as a difficult-to-monitor valve if:(1) You determine that the valve cannot be monitored without elevating the monitoring personnel more than 2 meters above a support surface or it is not accessible at anytime in a safe manner;(2) The CMPU within which the valve is located is an existing source or you designate less than 3 percent of the total number of valves in a new source as difficult-to-monitor; and(3) You follow a written plan that requires monitoring of the valve as frequently as practical, but not more frequently than the annual leak detection monitoring.(D) Any connector in gas/vapor service or light liquid service that is designated as an unsafe-to-repair connector if:(1) You determine that repair personnel would be exposed to an immediate danger as a consequence of complying with paragraph (a)(6)(i) of this section; and(2) The connector will be repaired before the end of the next scheduled CMPU shutdown.(E) Any connector in gas/vapor service or light liquid service that is inaccessible or is ceramic or ceramic-lined (e.g., porcelain, glass, or glass-lined); however, if any inaccessible or ceramic or ceramic-lined connector is observed by visual, audible, olfactory, or other means to be leaking, a first attempt at repair must be made no later than 5 calendar days after the leak is detected. The leak must be repaired as soon as practicable, but no later than 15 calendar days after the leak is detected, except as provided in paragraphs (a)(6)(viii) and (a)(6)(ii)(D) of this section. An inaccessible connector is defined in § 63.11502(b).(iii) For compressors, comply with the requirements in § 63.164.(iv) For pressure relief devices in gas/vapor service or light liquid service, comply with the requirements in § 63.165(e)(1) through (8), except as specified in paragraphs (a)(6)(iv)(A) through (D) of this section.(B) Section 63.165(e)(3)(v)(D) does not apply.(v) For sampling connection systems, comply with the requirements in § 63.166.(vi) For open-ended valves or lines, comply with the requirements in § 63.167.(vii) For pumps, valves, connectors, and agitators in heavy liquid service; instrumentation systems; and pressure relief devices in liquid service, comply with the requirements in § 63.169 except a leak is detected if the instrument reading equals or exceeds 10,000 ppmv for pumps, valves, and connectors instead of the leak definitions specified in § 63.169(b).(viii) For delay of repair, comply with the requirements in § 63.171 except the phrase “Except as specified in paragraph (f) of this section,” and § 63.171(f) do not apply.(ix) For closed vent systems and control devices, comply with the requirements in § 63.172 except as specified in paragraphs (a)(6)(ix)(A) through (G) of this section.(A) Substitute “§ 63.162(b) of this subpart” with “paragraph (a)(6)(xi) of this section”.(B) Section 63.172(d) does not apply.(C) Flares used to comply with this paragraph (a)(6) must comply with the requirements in subpart SS of this part.(E) Substitute “For each source as defined in § 63.101, and for each source as defined in § 63.191, beginning no later than the compliance dates specified in § 63.100(k)(10)” with “For each affected source as described in § 63.11494(d), beginning no later than the compliance dates specified in § 63.11494(i)”.(F) Substitute “After the compliance dates specified in § 63.100 of subpart F of this part” with “After the compliance dates specified in § 63.11494(i)”.(G) Substitute “periodic report required by § 63.182(d)” with “semiannual compliance report required by paragraph (a)(6)(xiv) of this section”.(x) For agitators in gas/vapor service and in light liquid service, comply with the requirements in § 63.173.(xi) You may use the alternative means of emission limitation provided in §§ 63.178 and 63.179. You may also request a determination of alternative means of emission limitation to the requirements in this paragraph (a)(6) as provided in § 63.177. If the Administrator makes a determination that an alternative means of emission limitation is permissible, you must comply with the alternative.(A) Substitute “§§ 63.163 through 63.171 and §§ 63.173 through 63.176” and “§ 63.163, through 63.171, and §§ 63.173 and 63.174 of this subpart” with “paragraphs (a)(6)(i) through (viii) and (x) of this section”.(B) Substitute “§ 63.181” with “§ 63.11501(c)(9)”.(C) Substitute “§ 63.163, §§ 63.168 and 63.169, and §§ 63.173 through 63.176 of this subpart” with “paragraphs (a)(6)(i), (ii), and (vii) through (x) of this section”.(D) Substitute “§ 63.180(b) of this subpart” with “paragraph (a)(6)(i)(A) and (B) of this section”.(E) Substitute “§§ 63.163 through 63.170, and §§ 63.172 through 63.176 of this subpart” with “paragraphs (a)(6)(i) through (vii), (ix), and (x) of this section”.(F) Substitute “§ 63.174 of this subpart” with “paragraph (a)(6)(i) of this section”.(G) Section 63.178(c)(3)(iii) and (iv) does not apply.(H) Substitute “§ 63.172 of this subpart” with “paragraph (a)(6)(ix) of this section”.(xii) Keep records as specified in § 63.11501(c)(9).(xiii) Submit the Notification of Compliance Status as specified in § 63.11501(b)(6).(xiv) Submit the Semiannual Compliance Report as specified in § 63.11501(d)(9).
-
(i) Keep a list, summary description, or diagram(s) showing the location and identification number of all equipment in organic HAP service at the facility and the information in paragraphs (c)(9)(i)(A) through (D) of this section.(A) Identification of equipment designated as unsafe to monitor, difficult to monitor, unsafe to inspect, difficult to inspect, or unsafe to repair and the plan for monitoring or inspecting this equipment, as applicable.(B) Identification of the equipment in batch process units, for which you do not elect to pressure test the batch product process equipment train.
Citations to §63.11501(c)(9)(iv)(A)
-
(iv) For each pressure relief device subject to the provisions in § 63.165(e), you must keep the records specified in paragraphs (c)(9)(iv)(A) through (C) of this section.(A) Records of the prevention measures implemented as required in § 63.165(e)(3)(ii).(C) For each release to the atmosphere, you must keep the records specified in paragraphs (c)(9)(iv)(C)(1) through (4) of this section.(1) The start and end time and date of each pressure release to the atmosphere.(2) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.(3) Records of the root cause analysis and corrective action analysis conducted as required in § 63.165(e)(3)(iii), including an identification of the affected facility, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under § 63.165(e)(7)(i).(4) For any corrective action analysis for which implementation of corrective actions are required in § 63.165(e)(7), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.
Citations to §63.11501(c)(9)(iv)(B)
-
(iv) For each pressure relief device subject to the provisions in § 63.165(e), you must keep the records specified in paragraphs (c)(9)(iv)(A) through (C) of this section.(A) Records of the prevention measures implemented as required in § 63.165(e)(3)(ii).(C) For each release to the atmosphere, you must keep the records specified in paragraphs (c)(9)(iv)(C)(1) through (4) of this section.(1) The start and end time and date of each pressure release to the atmosphere.(2) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.(3) Records of the root cause analysis and corrective action analysis conducted as required in § 63.165(e)(3)(iii), including an identification of the affected facility, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under § 63.165(e)(7)(i).(4) For any corrective action analysis for which implementation of corrective actions are required in § 63.165(e)(7), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.
Citations to §63.11501(c)(9)(iv)(C)
-
(iv) For each pressure relief device subject to the provisions in § 63.165(e), you must keep the records specified in paragraphs (c)(9)(iv)(A) through (C) of this section.(A) Records of the prevention measures implemented as required in § 63.165(e)(3)(ii).(C) For each release to the atmosphere, you must keep the records specified in paragraphs (c)(9)(iv)(C)(1) through (4) of this section.(1) The start and end time and date of each pressure release to the atmosphere.(2) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.(3) Records of the root cause analysis and corrective action analysis conducted as required in § 63.165(e)(3)(iii), including an identification of the affected facility, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under § 63.165(e)(7)(i).(4) For any corrective action analysis for which implementation of corrective actions are required in § 63.165(e)(7), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.
Citations to §63.11501(c)(9)(iv)(C)(1)
-
(C) For each release to the atmosphere, you must keep the records specified in paragraphs (c)(9)(iv)(C)(1) through (4) of this section.(1) The start and end time and date of each pressure release to the atmosphere.(2) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.(3) Records of the root cause analysis and corrective action analysis conducted as required in § 63.165(e)(3)(iii), including an identification of the affected facility, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under § 63.165(e)(7)(i).(4) For any corrective action analysis for which implementation of corrective actions are required in § 63.165(e)(7), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.
Citations to §63.11501(c)(9)(vi)(A)
-
(vi) You must maintain records of the information specified in paragraphs (c)(9)(vi)(A) through (C) of this section for closed vent systems and control devices subject to the provisions of § 63.172. The records specified in paragraph (c)(9)(vi)(A) of this section must be retained for the life of the equipment.(A) The design specifications and performance demonstrations specified in paragraphs (c)(9)(vi)(A)(1) through (4) of this section.(1) Detailed schematics, design specifications of the control device, and piping and instrumentation diagrams.(2) The dates and descriptions of any changes in the design specifications.(3) The flare design (i.e., steam-assisted, air-assisted, or non-assisted) and the results of the compliance demonstration required by subpart SS of this part.(4) A description of the parameter or parameters monitored, as required in § 63.172(e), to ensure that control devices are operated and maintained in conformance with their design and an explanation of why that parameter (or parameters) was selected for the monitoring.(B) Records of operation of closed vent systems and control devices, as specified in paragraphs (c)(9)(vi)(B)(1) through (3) of this section.(1) Dates and durations when the closed vent systems and control devices required in § 63.11495(a)(6) are not operated as designed as indicated by the monitored parameters, including periods when a flare pilot light system does not have a flame.(2) Dates and durations during which the monitoring system or monitoring device is inoperative.(3) Dates and durations of startups and shutdowns of control devices required in § 63.11495(a)(6).(C) Records of inspections of closed vent systems subject to the provisions of § 63.172, as specified in paragraphs (c)(9)(vi)(C)(1) and (2) of this section.(1) For each inspection conducted in accordance with the provisions of § 63.172(f)(1) or (2) during which leaks were detected, the information specified in paragraph (c)(9)(iii) of this section must be recorded.(2) For each flow event from a bypass line subject to the requirements in § 63.172(j), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements in § 63.11495(a)(6), you must include an estimate of the volume of gas, the concentration of organic HAP in the gas, and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.
Citations to §63.11501(c)(9)(vi)(A)(1)
-
(A) The design specifications and performance demonstrations specified in paragraphs (c)(9)(vi)(A)(1) through (4) of this section.(1) Detailed schematics, design specifications of the control device, and piping and instrumentation diagrams.(2) The dates and descriptions of any changes in the design specifications.(3) The flare design (i.e., steam-assisted, air-assisted, or non-assisted) and the results of the compliance demonstration required by subpart SS of this part.(4) A description of the parameter or parameters monitored, as required in § 63.172(e), to ensure that control devices are operated and maintained in conformance with their design and an explanation of why that parameter (or parameters) was selected for the monitoring.
Citations to §63.11501(c)(9)(vi)(B)
-
(vi) You must maintain records of the information specified in paragraphs (c)(9)(vi)(A) through (C) of this section for closed vent systems and control devices subject to the provisions of § 63.172. The records specified in paragraph (c)(9)(vi)(A) of this section must be retained for the life of the equipment.(A) The design specifications and performance demonstrations specified in paragraphs (c)(9)(vi)(A)(1) through (4) of this section.(1) Detailed schematics, design specifications of the control device, and piping and instrumentation diagrams.(2) The dates and descriptions of any changes in the design specifications.(3) The flare design (i.e., steam-assisted, air-assisted, or non-assisted) and the results of the compliance demonstration required by subpart SS of this part.(4) A description of the parameter or parameters monitored, as required in § 63.172(e), to ensure that control devices are operated and maintained in conformance with their design and an explanation of why that parameter (or parameters) was selected for the monitoring.(B) Records of operation of closed vent systems and control devices, as specified in paragraphs (c)(9)(vi)(B)(1) through (3) of this section.(1) Dates and durations when the closed vent systems and control devices required in § 63.11495(a)(6) are not operated as designed as indicated by the monitored parameters, including periods when a flare pilot light system does not have a flame.(2) Dates and durations during which the monitoring system or monitoring device is inoperative.(3) Dates and durations of startups and shutdowns of control devices required in § 63.11495(a)(6).(C) Records of inspections of closed vent systems subject to the provisions of § 63.172, as specified in paragraphs (c)(9)(vi)(C)(1) and (2) of this section.(1) For each inspection conducted in accordance with the provisions of § 63.172(f)(1) or (2) during which leaks were detected, the information specified in paragraph (c)(9)(iii) of this section must be recorded.(2) For each flow event from a bypass line subject to the requirements in § 63.172(j), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements in § 63.11495(a)(6), you must include an estimate of the volume of gas, the concentration of organic HAP in the gas, and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.
Citations to §63.11501(c)(9)(vi)(B)(1)
-
(B) Records of operation of closed vent systems and control devices, as specified in paragraphs (c)(9)(vi)(B)(1) through (3) of this section.(1) Dates and durations when the closed vent systems and control devices required in § 63.11495(a)(6) are not operated as designed as indicated by the monitored parameters, including periods when a flare pilot light system does not have a flame.(2) Dates and durations during which the monitoring system or monitoring device is inoperative.(3) Dates and durations of startups and shutdowns of control devices required in § 63.11495(a)(6).
Citations to §63.11501(c)(9)(vi)(C)
-
(vi) You must maintain records of the information specified in paragraphs (c)(9)(vi)(A) through (C) of this section for closed vent systems and control devices subject to the provisions of § 63.172. The records specified in paragraph (c)(9)(vi)(A) of this section must be retained for the life of the equipment.(A) The design specifications and performance demonstrations specified in paragraphs (c)(9)(vi)(A)(1) through (4) of this section.(1) Detailed schematics, design specifications of the control device, and piping and instrumentation diagrams.(2) The dates and descriptions of any changes in the design specifications.(3) The flare design (i.e., steam-assisted, air-assisted, or non-assisted) and the results of the compliance demonstration required by subpart SS of this part.(4) A description of the parameter or parameters monitored, as required in § 63.172(e), to ensure that control devices are operated and maintained in conformance with their design and an explanation of why that parameter (or parameters) was selected for the monitoring.(B) Records of operation of closed vent systems and control devices, as specified in paragraphs (c)(9)(vi)(B)(1) through (3) of this section.(1) Dates and durations when the closed vent systems and control devices required in § 63.11495(a)(6) are not operated as designed as indicated by the monitored parameters, including periods when a flare pilot light system does not have a flame.(2) Dates and durations during which the monitoring system or monitoring device is inoperative.(3) Dates and durations of startups and shutdowns of control devices required in § 63.11495(a)(6).(C) Records of inspections of closed vent systems subject to the provisions of § 63.172, as specified in paragraphs (c)(9)(vi)(C)(1) and (2) of this section.(1) For each inspection conducted in accordance with the provisions of § 63.172(f)(1) or (2) during which leaks were detected, the information specified in paragraph (c)(9)(iii) of this section must be recorded.(2) For each flow event from a bypass line subject to the requirements in § 63.172(j), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements in § 63.11495(a)(6), you must include an estimate of the volume of gas, the concentration of organic HAP in the gas, and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.
Citations to §63.11501(c)(10)
-
(c) You must maintain files of all information required by this subpart for at least 5 years following the date of each occurrence according to the requirements in § 63.10(b)(1). If you are subject, you must comply with the recordkeeping and reporting requirements of § 63.10(b)(2)(iii) and (vi) through (xiv), and the applicable requirements specified in paragraphs (c)(1) through (11) of this section.(1) For each CMPU subject to this subpart, you must keep the records specified in paragraphs (c)(1)(i) through (viii) of this section.(i) Except as specified in paragraph (c)(9) of this section, records of management practice inspections, repairs, and reasons for any delay of repair, as specified in § 63.11495(a)(5).(ii) Except as specified in paragraph (c)(11) of this section, records of small heat exchange system inspections, demonstrations of indications of leaks that do not constitute leaks, repairs, and reasons for any delay in repair as specified in § 63.11495(b).(iii) If batch process vent emissions are less than 10,000 lb/yr for a CMPU, records of batch process vent emission calculations, as specified in § 63.11496(a)(1), the number of batches operated each month, as specified in § 63.11496(a)(3), and any updated emissions calculations, as specified in § 63.11496(a)(3). Alternatively, keep records of the worst-case processes or organic HAP usage, as specified in § 63.11496(a)(2) and (4), respectively.(iv) Records of all TRE calculations for continuous process vents as specified in § 63.11496(b)(2).(v) Records of metal HAP emission calculations as specified in § 63.11496(f)(1) and (2). If total uncontrolled metal HAP process vent emissions from a CMPU subject to this subpart are estimated to be less than 400 lb/yr, also keep records of either the number of batches per month or operating hours, as specified in § 63.11496(f)(2).(vi) Records identifying wastewater streams and the type of treatment they receive, as specified in table 6 to this subpart.(vii) Before April 1, 2029, records of the date, time, and duration of each malfunction of operation of process equipment, control devices, recovery devices, or continuous monitoring systems used to comply with this subpart that causes a failure to meet a standard. The record must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. After April 1, 2029, for any deviation, records of the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, and a description of the method used to estimate the emissions.(viii) Before April 1, 2029, records of actions taken during periods of malfunction to minimize emissions in accordance with § 63.11495(d), including corrective actions to restore malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of operation. After April 1, 2029, for any deviation, records of actions taken to minimize emissions in accordance with § 63.11495(d), and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) For batch process vents subject to table 2 to this subpart and continuous process vents subject to table 3 to this subpart, you must keep records specified in paragraphs (c)(2)(i) or (ii) of this section, as applicable.(i) If you route emissions to a control device other than a flare, keep records of performance tests, if applicable, as specified in § 63.998(a)(2)(ii) and (4), keep records of the monitoring system and the monitored parameters, as specified in § 63.998(b) and (c), and keep records of the closed-vent system, as specified in § 63.998(d)(1). If you use a recovery device to maintain the TRE above 1.0 for a continuous process vent, keep records of monitoring parameters during the TRE index value determination, as specified in § 63.998(a)(3).(ii) If you route emissions to a flare, keep records of the flare compliance assessment, as specified in § 63.998(a)(1)(i), keep records of the pilot flame monitoring, as specified in § 63.998(a)(1)(ii) and (iii), and keep records of the closed-vent system, as specified in § 63.998(d)(1).(3) For metal HAP process vents subject to table 4 to this subpart, you must keep records specified in paragraph (c)(3)(i) or (ii) of this section, as applicable.(i) For a new source using a control device other than a baghouse and for any existing source, maintain a monitoring plan, as specified in § 63.11496(f)(3)(i), and keep records of monitoring results, as specified in § 63.11496(f)(3).(ii) For a new source using a baghouse to control metal HAP emissions, keep a site-specific monitoring plan, as specified in §§ 63.11496(f)(4) and 63.11410(g), and keep records of bag leak detection systems, as specified in §§ 63.11496(f)(4) and 63.11410(g)(4).(4) For each storage tank subject to table 5 to this subpart, you must keep records specified in paragraphs (c)(4)(i) through (vii) of this section, as applicable.(i) Keep records of the vessel dimensions, capacity, and liquid stored, as specified in § 63.1065(a).(ii) Keep records of each inspection of an internal floating roof, as specified in § 63.1065(b)(1).(iii) Keep records of each seal gap measurement for external floating roofs, as specified in § 63.1065(b)(2), and keep records of inspections of external floating roofs, as specified in § 63.1065(b)(1).(iv) If you vent emissions to a control device other than a flare, keep records of the operating plan and measured parameter values, as specified in §§ 63.985(c) and 63.998(d)(2).(v) If you vent emissions to a flare, keep records of all periods of operation during which the flare pilot flame is absent, as specified in §§ 63.987(c) and 63.998(a)(1), and keep records of closed-vent systems, as specified in § 63.998(d)(1).(vi) For periods of planned routine maintenance of a control device, keep records of the day and time at which each maintenance period begins and ends, and keep records of the type of maintenance performed, as specified in § 63.11497(b)(3).(vii) For each pressure vessel subject to the requirements of § 63.11497(f) you must keep records as specified in paragraphs (c)(4)(vii)(A) and (B) of this section.(A) The date of each performance test conducted according to § 63.11497(f)(2).(B) The record of each performance test conducted according to § 63.11497(f)(2), including the following:(1) Date each defect was detected and the instrument reading (in ppmv) during the performance test.(2) Date of the next performance test that shows the instrument reading is less than 500 ppmv and the instrument reading (in ppmv) during the performance test.(3) Start and end dates of each period after the date in paragraph (c)(4)(ix)(B)(1) of this section when the pressure vessel was completely empty.(4) Estimated emissions from each defect.(5) For each wastewater stream subject to item 2 in table 6 to this subpart, keep records of the wastewater stream identification and the disposition of the organic phase(s), as specified in item 2 to table 6 to this subpart.(6) Except as specified in paragraph (c)(11) of this section, for each large heat exchange system subject to table 8 to this subpart, you must keep records of detected leaks; the date the leak was detected; if demonstrated not to be a leak, the basis for that determination; the date of efforts to repair the leak; and the date the leak is repaired, as specified in table 8 to this subpart.(7) You must keep a record of all transferred liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) For continuous process vents subject to table 3 to this subpart, keep records of the occurrence and duration of each startup and shutdown of operation of process equipment, or of air pollution control and monitoring equipment.(9) If you are subject to the equipment leak requirements specified in § 63.11495(a)(6), then you must keep records as specified in paragraphs (c)(9)(i) through (vii) of this section instead of the records specified in paragraph (c)(1)(i) of this section.(i) Keep a list, summary description, or diagram(s) showing the location and identification number of all equipment in organic HAP service at the facility and the information in paragraphs (c)(9)(i)(A) through (D) of this section.(A) Identification of equipment designated as unsafe to monitor, difficult to monitor, unsafe to inspect, difficult to inspect, or unsafe to repair and the plan for monitoring or inspecting this equipment, as applicable.(B) Identification of the equipment in batch process units, for which you do not elect to pressure test the batch product process equipment train.(ii) For leak detection monitoring and inspections required by paragraphs § 63.11495(a)(6) (e.g., monitoring using Method 21 of appendix A-7 to part 60 of this chapter; visible, audible, or olfactory monitoring; closed vent system inspections; and batch process unit monitoring), record the date of the monitoring or inspection and include a statement of whether leaks were detected. If no leaks are detected, records of the monitoring and inspection results are not required.(iii) When each leak is detected as specified in § 63.11495(a)(6), the following information must be recorded:(A) The instrument and the equipment identification number and the operator name, initials, or identification number.(D) Maximum instrument reading measured by Method 21 of 40 CFR part 60, appendix A-7 of this chapter after it is successfully repaired or determined to be nonrepairable.(E) “Repair delayed” and the reason for the delay if a leak is not repaired within 15 calendar days after discovery of the leak.(1) You may develop a written procedure that identifies the conditions that justify a delay of repair. In such cases, reasons for delay of repair may be documented by citing the relevant sections of the written procedure.(2) If delay of repair was caused by depletion of stocked parts, there must be documentation that the spare parts were sufficiently stocked on-site before depletion and the reason for depletion.(iv) For each pressure relief device subject to the provisions in § 63.165(e), you must keep the records specified in paragraphs (c)(9)(iv)(A) through (C) of this section.(A) Records of the prevention measures implemented as required in § 63.165(e)(3)(ii).(C) For each release to the atmosphere, you must keep the records specified in paragraphs (c)(9)(iv)(C)(1) through (4) of this section.(1) The start and end time and date of each pressure release to the atmosphere.(2) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.(3) Records of the root cause analysis and corrective action analysis conducted as required in § 63.165(e)(3)(iii), including an identification of the affected facility, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under § 63.165(e)(7)(i).(4) For any corrective action analysis for which implementation of corrective actions are required in § 63.165(e)(7), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.(v) If you own or operate a batch product process and elect to pressure test the batch product process equipment train to demonstrate compliance with § 63.11495(a)(6), you are exempt from the requirements of paragraphs (c)(9)(i) through (iv) of this section. Instead, you must maintain records of the following information:(B) The dates of each pressure test required in § 63.178(b), the test pressure, and the pressure drop observed during the test.(C) When a batch product process equipment train does not pass two consecutive pressure tests, the following information must be recorded:(1) The date of each pressure test and the date of each leak repair attempt.(2) Repair methods applied in each attempt to repair the leak.(3) The reason for the delay of repair.(4) The expected date for delivery of the replacement equipment and the actual date of delivery of the replacement equipment.(5) The date of successful repair.(vi) You must maintain records of the information specified in paragraphs (c)(9)(vi)(A) through (C) of this section for closed vent systems and control devices subject to the provisions of § 63.172. The records specified in paragraph (c)(9)(vi)(A) of this section must be retained for the life of the equipment.(A) The design specifications and performance demonstrations specified in paragraphs (c)(9)(vi)(A)(1) through (4) of this section.(1) Detailed schematics, design specifications of the control device, and piping and instrumentation diagrams.(2) The dates and descriptions of any changes in the design specifications.(3) The flare design (i.e., steam-assisted, air-assisted, or non-assisted) and the results of the compliance demonstration required by subpart SS of this part.(4) A description of the parameter or parameters monitored, as required in § 63.172(e), to ensure that control devices are operated and maintained in conformance with their design and an explanation of why that parameter (or parameters) was selected for the monitoring.(B) Records of operation of closed vent systems and control devices, as specified in paragraphs (c)(9)(vi)(B)(1) through (3) of this section.(1) Dates and durations when the closed vent systems and control devices required in § 63.11495(a)(6) are not operated as designed as indicated by the monitored parameters, including periods when a flare pilot light system does not have a flame.(2) Dates and durations during which the monitoring system or monitoring device is inoperative.(3) Dates and durations of startups and shutdowns of control devices required in § 63.11495(a)(6).(C) Records of inspections of closed vent systems subject to the provisions of § 63.172, as specified in paragraphs (c)(9)(vi)(C)(1) and (2) of this section.(1) For each inspection conducted in accordance with the provisions of § 63.172(f)(1) or (2) during which leaks were detected, the information specified in paragraph (c)(9)(iii) of this section must be recorded.(2) For each flow event from a bypass line subject to the requirements in § 63.172(j), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements in § 63.11495(a)(6), you must include an estimate of the volume of gas, the concentration of organic HAP in the gas, and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(vii) If you choose to comply with the requirements of § 63.179, you must maintain the following records:(C) A description of the system used to create a negative pressure in the enclosure to ensure that all emissions are routed to the control device.(10) For each flow event from a bypass line subject to the requirements in § 63.11495(e), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements specified in §§ 63.11495 through 63.11499, you must include an estimate of the volume of gas, the concentration of organic HAP in the gas and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must keep records as specified in § 63.104(f)(3) instead of the heat exchange system records specified in paragraphs (c)(1)(ii) and (6) of this section.
Citations to §63.11501(c)(11)
-
(c) You must maintain files of all information required by this subpart for at least 5 years following the date of each occurrence according to the requirements in § 63.10(b)(1). If you are subject, you must comply with the recordkeeping and reporting requirements of § 63.10(b)(2)(iii) and (vi) through (xiv), and the applicable requirements specified in paragraphs (c)(1) through (11) of this section.(1) For each CMPU subject to this subpart, you must keep the records specified in paragraphs (c)(1)(i) through (viii) of this section.(i) Except as specified in paragraph (c)(9) of this section, records of management practice inspections, repairs, and reasons for any delay of repair, as specified in § 63.11495(a)(5).(ii) Except as specified in paragraph (c)(11) of this section, records of small heat exchange system inspections, demonstrations of indications of leaks that do not constitute leaks, repairs, and reasons for any delay in repair as specified in § 63.11495(b).(iii) If batch process vent emissions are less than 10,000 lb/yr for a CMPU, records of batch process vent emission calculations, as specified in § 63.11496(a)(1), the number of batches operated each month, as specified in § 63.11496(a)(3), and any updated emissions calculations, as specified in § 63.11496(a)(3). Alternatively, keep records of the worst-case processes or organic HAP usage, as specified in § 63.11496(a)(2) and (4), respectively.(iv) Records of all TRE calculations for continuous process vents as specified in § 63.11496(b)(2).(v) Records of metal HAP emission calculations as specified in § 63.11496(f)(1) and (2). If total uncontrolled metal HAP process vent emissions from a CMPU subject to this subpart are estimated to be less than 400 lb/yr, also keep records of either the number of batches per month or operating hours, as specified in § 63.11496(f)(2).(vi) Records identifying wastewater streams and the type of treatment they receive, as specified in table 6 to this subpart.(vii) Before April 1, 2029, records of the date, time, and duration of each malfunction of operation of process equipment, control devices, recovery devices, or continuous monitoring systems used to comply with this subpart that causes a failure to meet a standard. The record must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. After April 1, 2029, for any deviation, records of the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, and a description of the method used to estimate the emissions.(viii) Before April 1, 2029, records of actions taken during periods of malfunction to minimize emissions in accordance with § 63.11495(d), including corrective actions to restore malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of operation. After April 1, 2029, for any deviation, records of actions taken to minimize emissions in accordance with § 63.11495(d), and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) For batch process vents subject to table 2 to this subpart and continuous process vents subject to table 3 to this subpart, you must keep records specified in paragraphs (c)(2)(i) or (ii) of this section, as applicable.(i) If you route emissions to a control device other than a flare, keep records of performance tests, if applicable, as specified in § 63.998(a)(2)(ii) and (4), keep records of the monitoring system and the monitored parameters, as specified in § 63.998(b) and (c), and keep records of the closed-vent system, as specified in § 63.998(d)(1). If you use a recovery device to maintain the TRE above 1.0 for a continuous process vent, keep records of monitoring parameters during the TRE index value determination, as specified in § 63.998(a)(3).(ii) If you route emissions to a flare, keep records of the flare compliance assessment, as specified in § 63.998(a)(1)(i), keep records of the pilot flame monitoring, as specified in § 63.998(a)(1)(ii) and (iii), and keep records of the closed-vent system, as specified in § 63.998(d)(1).(3) For metal HAP process vents subject to table 4 to this subpart, you must keep records specified in paragraph (c)(3)(i) or (ii) of this section, as applicable.(i) For a new source using a control device other than a baghouse and for any existing source, maintain a monitoring plan, as specified in § 63.11496(f)(3)(i), and keep records of monitoring results, as specified in § 63.11496(f)(3).(ii) For a new source using a baghouse to control metal HAP emissions, keep a site-specific monitoring plan, as specified in §§ 63.11496(f)(4) and 63.11410(g), and keep records of bag leak detection systems, as specified in §§ 63.11496(f)(4) and 63.11410(g)(4).(4) For each storage tank subject to table 5 to this subpart, you must keep records specified in paragraphs (c)(4)(i) through (vii) of this section, as applicable.(i) Keep records of the vessel dimensions, capacity, and liquid stored, as specified in § 63.1065(a).(ii) Keep records of each inspection of an internal floating roof, as specified in § 63.1065(b)(1).(iii) Keep records of each seal gap measurement for external floating roofs, as specified in § 63.1065(b)(2), and keep records of inspections of external floating roofs, as specified in § 63.1065(b)(1).(iv) If you vent emissions to a control device other than a flare, keep records of the operating plan and measured parameter values, as specified in §§ 63.985(c) and 63.998(d)(2).(v) If you vent emissions to a flare, keep records of all periods of operation during which the flare pilot flame is absent, as specified in §§ 63.987(c) and 63.998(a)(1), and keep records of closed-vent systems, as specified in § 63.998(d)(1).(vi) For periods of planned routine maintenance of a control device, keep records of the day and time at which each maintenance period begins and ends, and keep records of the type of maintenance performed, as specified in § 63.11497(b)(3).(vii) For each pressure vessel subject to the requirements of § 63.11497(f) you must keep records as specified in paragraphs (c)(4)(vii)(A) and (B) of this section.(A) The date of each performance test conducted according to § 63.11497(f)(2).(B) The record of each performance test conducted according to § 63.11497(f)(2), including the following:(1) Date each defect was detected and the instrument reading (in ppmv) during the performance test.(2) Date of the next performance test that shows the instrument reading is less than 500 ppmv and the instrument reading (in ppmv) during the performance test.(3) Start and end dates of each period after the date in paragraph (c)(4)(ix)(B)(1) of this section when the pressure vessel was completely empty.(4) Estimated emissions from each defect.(5) For each wastewater stream subject to item 2 in table 6 to this subpart, keep records of the wastewater stream identification and the disposition of the organic phase(s), as specified in item 2 to table 6 to this subpart.(6) Except as specified in paragraph (c)(11) of this section, for each large heat exchange system subject to table 8 to this subpart, you must keep records of detected leaks; the date the leak was detected; if demonstrated not to be a leak, the basis for that determination; the date of efforts to repair the leak; and the date the leak is repaired, as specified in table 8 to this subpart.(7) You must keep a record of all transferred liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) For continuous process vents subject to table 3 to this subpart, keep records of the occurrence and duration of each startup and shutdown of operation of process equipment, or of air pollution control and monitoring equipment.(9) If you are subject to the equipment leak requirements specified in § 63.11495(a)(6), then you must keep records as specified in paragraphs (c)(9)(i) through (vii) of this section instead of the records specified in paragraph (c)(1)(i) of this section.(i) Keep a list, summary description, or diagram(s) showing the location and identification number of all equipment in organic HAP service at the facility and the information in paragraphs (c)(9)(i)(A) through (D) of this section.(A) Identification of equipment designated as unsafe to monitor, difficult to monitor, unsafe to inspect, difficult to inspect, or unsafe to repair and the plan for monitoring or inspecting this equipment, as applicable.(B) Identification of the equipment in batch process units, for which you do not elect to pressure test the batch product process equipment train.(ii) For leak detection monitoring and inspections required by paragraphs § 63.11495(a)(6) (e.g., monitoring using Method 21 of appendix A-7 to part 60 of this chapter; visible, audible, or olfactory monitoring; closed vent system inspections; and batch process unit monitoring), record the date of the monitoring or inspection and include a statement of whether leaks were detected. If no leaks are detected, records of the monitoring and inspection results are not required.(iii) When each leak is detected as specified in § 63.11495(a)(6), the following information must be recorded:(A) The instrument and the equipment identification number and the operator name, initials, or identification number.(D) Maximum instrument reading measured by Method 21 of 40 CFR part 60, appendix A-7 of this chapter after it is successfully repaired or determined to be nonrepairable.(E) “Repair delayed” and the reason for the delay if a leak is not repaired within 15 calendar days after discovery of the leak.(1) You may develop a written procedure that identifies the conditions that justify a delay of repair. In such cases, reasons for delay of repair may be documented by citing the relevant sections of the written procedure.(2) If delay of repair was caused by depletion of stocked parts, there must be documentation that the spare parts were sufficiently stocked on-site before depletion and the reason for depletion.(iv) For each pressure relief device subject to the provisions in § 63.165(e), you must keep the records specified in paragraphs (c)(9)(iv)(A) through (C) of this section.(A) Records of the prevention measures implemented as required in § 63.165(e)(3)(ii).(C) For each release to the atmosphere, you must keep the records specified in paragraphs (c)(9)(iv)(C)(1) through (4) of this section.(1) The start and end time and date of each pressure release to the atmosphere.(2) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.(3) Records of the root cause analysis and corrective action analysis conducted as required in § 63.165(e)(3)(iii), including an identification of the affected facility, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under § 63.165(e)(7)(i).(4) For any corrective action analysis for which implementation of corrective actions are required in § 63.165(e)(7), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.(v) If you own or operate a batch product process and elect to pressure test the batch product process equipment train to demonstrate compliance with § 63.11495(a)(6), you are exempt from the requirements of paragraphs (c)(9)(i) through (iv) of this section. Instead, you must maintain records of the following information:(B) The dates of each pressure test required in § 63.178(b), the test pressure, and the pressure drop observed during the test.(C) When a batch product process equipment train does not pass two consecutive pressure tests, the following information must be recorded:(1) The date of each pressure test and the date of each leak repair attempt.(2) Repair methods applied in each attempt to repair the leak.(3) The reason for the delay of repair.(4) The expected date for delivery of the replacement equipment and the actual date of delivery of the replacement equipment.(5) The date of successful repair.(vi) You must maintain records of the information specified in paragraphs (c)(9)(vi)(A) through (C) of this section for closed vent systems and control devices subject to the provisions of § 63.172. The records specified in paragraph (c)(9)(vi)(A) of this section must be retained for the life of the equipment.(A) The design specifications and performance demonstrations specified in paragraphs (c)(9)(vi)(A)(1) through (4) of this section.(1) Detailed schematics, design specifications of the control device, and piping and instrumentation diagrams.(2) The dates and descriptions of any changes in the design specifications.(3) The flare design (i.e., steam-assisted, air-assisted, or non-assisted) and the results of the compliance demonstration required by subpart SS of this part.(4) A description of the parameter or parameters monitored, as required in § 63.172(e), to ensure that control devices are operated and maintained in conformance with their design and an explanation of why that parameter (or parameters) was selected for the monitoring.(B) Records of operation of closed vent systems and control devices, as specified in paragraphs (c)(9)(vi)(B)(1) through (3) of this section.(1) Dates and durations when the closed vent systems and control devices required in § 63.11495(a)(6) are not operated as designed as indicated by the monitored parameters, including periods when a flare pilot light system does not have a flame.(2) Dates and durations during which the monitoring system or monitoring device is inoperative.(3) Dates and durations of startups and shutdowns of control devices required in § 63.11495(a)(6).(C) Records of inspections of closed vent systems subject to the provisions of § 63.172, as specified in paragraphs (c)(9)(vi)(C)(1) and (2) of this section.(1) For each inspection conducted in accordance with the provisions of § 63.172(f)(1) or (2) during which leaks were detected, the information specified in paragraph (c)(9)(iii) of this section must be recorded.(2) For each flow event from a bypass line subject to the requirements in § 63.172(j), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements in § 63.11495(a)(6), you must include an estimate of the volume of gas, the concentration of organic HAP in the gas, and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(vii) If you choose to comply with the requirements of § 63.179, you must maintain the following records:(C) A description of the system used to create a negative pressure in the enclosure to ensure that all emissions are routed to the control device.(10) For each flow event from a bypass line subject to the requirements in § 63.11495(e), you must maintain records sufficient to determine whether or not the detected flow included flow requiring control. For each flow event from a bypass line requiring control that is released either directly to the atmosphere or to a control device not meeting the requirements specified in §§ 63.11495 through 63.11499, you must include an estimate of the volume of gas, the concentration of organic HAP in the gas and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must keep records as specified in § 63.104(f)(3) instead of the heat exchange system records specified in paragraphs (c)(1)(ii) and (6) of this section.
Citations to §63.11501(c)(iv)
-
(v) If you own or operate a batch product process and elect to pressure test the batch product process equipment train to demonstrate compliance with § 63.11495(a)(6), you are exempt from the requirements of paragraphs (c)(9)(i) through (iv) of this section. Instead, you must maintain records of the following information:(B) The dates of each pressure test required in § 63.178(b), the test pressure, and the pressure drop observed during the test.(C) When a batch product process equipment train does not pass two consecutive pressure tests, the following information must be recorded:(1) The date of each pressure test and the date of each leak repair attempt.(2) Repair methods applied in each attempt to repair the leak.(3) The reason for the delay of repair.(4) The expected date for delivery of the replacement equipment and the actual date of delivery of the replacement equipment.(5) The date of successful repair.
Citations to §63.11501(c)(vii)
-
(4) For each storage tank subject to table 5 to this subpart, you must keep records specified in paragraphs (c)(4)(i) through (vii) of this section, as applicable.(i) Keep records of the vessel dimensions, capacity, and liquid stored, as specified in § 63.1065(a).(ii) Keep records of each inspection of an internal floating roof, as specified in § 63.1065(b)(1).(iii) Keep records of each seal gap measurement for external floating roofs, as specified in § 63.1065(b)(2), and keep records of inspections of external floating roofs, as specified in § 63.1065(b)(1).(iv) If you vent emissions to a control device other than a flare, keep records of the operating plan and measured parameter values, as specified in §§ 63.985(c) and 63.998(d)(2).(v) If you vent emissions to a flare, keep records of all periods of operation during which the flare pilot flame is absent, as specified in §§ 63.987(c) and 63.998(a)(1), and keep records of closed-vent systems, as specified in § 63.998(d)(1).(vi) For periods of planned routine maintenance of a control device, keep records of the day and time at which each maintenance period begins and ends, and keep records of the type of maintenance performed, as specified in § 63.11497(b)(3).(vii) For each pressure vessel subject to the requirements of § 63.11497(f) you must keep records as specified in paragraphs (c)(4)(vii)(A) and (B) of this section.(A) The date of each performance test conducted according to § 63.11497(f)(2).(B) The record of each performance test conducted according to § 63.11497(f)(2), including the following:(1) Date each defect was detected and the instrument reading (in ppmv) during the performance test.(2) Date of the next performance test that shows the instrument reading is less than 500 ppmv and the instrument reading (in ppmv) during the performance test.(3) Start and end dates of each period after the date in paragraph (c)(4)(ix)(B)(1) of this section when the pressure vessel was completely empty.(4) Estimated emissions from each defect.
Citations to §63.11501(c)(viii)
-
(1) For each CMPU subject to this subpart, you must keep the records specified in paragraphs (c)(1)(i) through (viii) of this section.(i) Except as specified in paragraph (c)(9) of this section, records of management practice inspections, repairs, and reasons for any delay of repair, as specified in § 63.11495(a)(5).(ii) Except as specified in paragraph (c)(11) of this section, records of small heat exchange system inspections, demonstrations of indications of leaks that do not constitute leaks, repairs, and reasons for any delay in repair as specified in § 63.11495(b).(iii) If batch process vent emissions are less than 10,000 lb/yr for a CMPU, records of batch process vent emission calculations, as specified in § 63.11496(a)(1), the number of batches operated each month, as specified in § 63.11496(a)(3), and any updated emissions calculations, as specified in § 63.11496(a)(3). Alternatively, keep records of the worst-case processes or organic HAP usage, as specified in § 63.11496(a)(2) and (4), respectively.(iv) Records of all TRE calculations for continuous process vents as specified in § 63.11496(b)(2).(v) Records of metal HAP emission calculations as specified in § 63.11496(f)(1) and (2). If total uncontrolled metal HAP process vent emissions from a CMPU subject to this subpart are estimated to be less than 400 lb/yr, also keep records of either the number of batches per month or operating hours, as specified in § 63.11496(f)(2).(vi) Records identifying wastewater streams and the type of treatment they receive, as specified in table 6 to this subpart.(vii) Before April 1, 2029, records of the date, time, and duration of each malfunction of operation of process equipment, control devices, recovery devices, or continuous monitoring systems used to comply with this subpart that causes a failure to meet a standard. The record must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. After April 1, 2029, for any deviation, records of the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, and a description of the method used to estimate the emissions.(viii) Before April 1, 2029, records of actions taken during periods of malfunction to minimize emissions in accordance with § 63.11495(d), including corrective actions to restore malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of operation. After April 1, 2029, for any deviation, records of actions taken to minimize emissions in accordance with § 63.11495(d), and any corrective action taken to return the affected unit to its normal or usual manner of operation.
Citations to §63.11501(d)
-
(5) When § 63.1258(b)(5)(ii)(B)(2) refers to a “notification of process change” report, it means the semi-annual compliance report required by § 63.11501(d) for the purposes of this subpart.
Citations to §63.11501(d)(1)
-
(d) You must submit semiannual compliance reports that contain the information specified in paragraphs (d)(1) through (12) of this section, as applicable. All reports must contain the company name and address (including county), as well as the beginning and ending dates of the reporting period. For periods where no events described by paragraphs (d)(1) through (12) of this section occur, a statement must be included in the report pursuant to § 63.10(e)(3)(v). Beginning on April 1, 2029, or once the report template for this subpart has been available on the CEDRI website for one year, whichever date is later, submit all subsequent reports using the appropriate electronic report template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/cedri) for this subpart and following the procedure specified in § 63.9(k). The date report templates become available will be listed on the CEDRI website. Unless the Administrator or delegated State agency or other authority has approved a different schedule for submission of reports, the report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted.(1) Before April 1, 2029 you must clearly identify any deviation from the requirements of this subpart. Beginning on April 1, 2029, for each deviation, you must report the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, a description of the method used to estimate the emissions, actions taken to minimize emissions, and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) Except as specified in paragraph (d)(11) of this section, you must include the information specified in § 63.104(f)(2) each time you invoke the delay of repair provisions for a heat exchange system with a cooling water flow rate equal to or greater than 8,000 gal/min.(3) You must provide the following information for each delay of leak repair beyond 15 days for any process equipment, storage tank, surge control vessel, bottoms receiver, and each delay of leak repair beyond 45 days for any heat exchange system with a cooling water flow rate less than 8,000 gal/min: information on the date the leak was identified, the reason for the delay in repair, and the date the leak was repaired.(4) You must report each process change that affects a compliance determination and submit a new certification of compliance with the applicable requirements in accordance with the procedures specified in paragraph (b) of this section.(5) If you comply with the alternative standard, as specified in table 2 or 3 to this subpart, report the information required in § 63.1258(b)(5).(6) Report any changes in the overlapping provisions with which you comply.(7) Report any transfer of liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) If a malfunction occurred during the reporting period, the report must include the number of instances of malfunctions that caused emissions in excess of a standard. For each malfunction that caused emissions in excess of a standard, the report must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. The report must also include a description of actions you took during a malfunction of an affected source to minimize emissions in accordance with § 63.11495(d), including actions taken to correct a malfunction. On and after April 1, 2029, malfunctions are reported as deviations under paragraph (d)(1) of this section and this paragraph (d)(8) no longer applies.(9) For each CMPU complying with the provisions of § 63.11495(a)(6), report the information listed in paragraphs (d)(9)(i) through (vi) of this section.(i) The number of components for which leaks were detected, the total number of components monitored, and the number of components for which leaks were not repaired, identifying the number of those that are determined nonrepairable, and totaled by component type.(ii) The facts that explain any delay of repairs and, where appropriate, why a CMPU shutdown was technically infeasible.(iii) For pressure relief devices subject to the requirements in § 63.11495(a)(6)(iv) include the information specified in paragraphs (d)(9)(iii)(A) through (C) of this section.(A) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(1), report the instrument readings and dates for all readings of 500 ppm or greater.(B) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(2), report the instrument readings and dates of instrument reading conducted.(C) For pressure relief devices in organic HAP service subject to § 63.165(e)(3), report each pressure release to the atmosphere, including pressure relief device identification name or number, the start date, start time, and duration (in minutes) of the pressure release; an estimate of the mass quantity in pounds of each organic HAP released; the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period; and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.(iv) For bypass lines subject to the requirements in § 63.172(j) as specified in § 63.11495(a)(6)(ix), include the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in parts per million by volume and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(v) If applicable, the compliance option selected under § 63.172(n) as specified in § 63.11495(a)(6)(ix).(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).(10) For bypass lines subject to the requirements § 63.11495(e), report the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in ppmv and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must submit the information specified in § 63.104(f)(2)(vi) instead of the heat exchange system information specified in paragraphs (d)(2) and (3) of this section.(12) If you are subject to the requirements specified in § 63.11497(e) and obtain an instrument reading greater than 500 ppmv when monitoring a pressure vessel in accordance with § 63.11497(e)(2), report an identification of the pressure vessel and a copy of the records specified in paragraph (c)(4)(vii)(B) of this section.
Citations to §63.11501(d)(2)
-
(d) You must submit semiannual compliance reports that contain the information specified in paragraphs (d)(1) through (12) of this section, as applicable. All reports must contain the company name and address (including county), as well as the beginning and ending dates of the reporting period. For periods where no events described by paragraphs (d)(1) through (12) of this section occur, a statement must be included in the report pursuant to § 63.10(e)(3)(v). Beginning on April 1, 2029, or once the report template for this subpart has been available on the CEDRI website for one year, whichever date is later, submit all subsequent reports using the appropriate electronic report template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/cedri) for this subpart and following the procedure specified in § 63.9(k). The date report templates become available will be listed on the CEDRI website. Unless the Administrator or delegated State agency or other authority has approved a different schedule for submission of reports, the report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted.(1) Before April 1, 2029 you must clearly identify any deviation from the requirements of this subpart. Beginning on April 1, 2029, for each deviation, you must report the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, a description of the method used to estimate the emissions, actions taken to minimize emissions, and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) Except as specified in paragraph (d)(11) of this section, you must include the information specified in § 63.104(f)(2) each time you invoke the delay of repair provisions for a heat exchange system with a cooling water flow rate equal to or greater than 8,000 gal/min.(3) You must provide the following information for each delay of leak repair beyond 15 days for any process equipment, storage tank, surge control vessel, bottoms receiver, and each delay of leak repair beyond 45 days for any heat exchange system with a cooling water flow rate less than 8,000 gal/min: information on the date the leak was identified, the reason for the delay in repair, and the date the leak was repaired.(4) You must report each process change that affects a compliance determination and submit a new certification of compliance with the applicable requirements in accordance with the procedures specified in paragraph (b) of this section.(5) If you comply with the alternative standard, as specified in table 2 or 3 to this subpart, report the information required in § 63.1258(b)(5).(6) Report any changes in the overlapping provisions with which you comply.(7) Report any transfer of liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) If a malfunction occurred during the reporting period, the report must include the number of instances of malfunctions that caused emissions in excess of a standard. For each malfunction that caused emissions in excess of a standard, the report must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. The report must also include a description of actions you took during a malfunction of an affected source to minimize emissions in accordance with § 63.11495(d), including actions taken to correct a malfunction. On and after April 1, 2029, malfunctions are reported as deviations under paragraph (d)(1) of this section and this paragraph (d)(8) no longer applies.(9) For each CMPU complying with the provisions of § 63.11495(a)(6), report the information listed in paragraphs (d)(9)(i) through (vi) of this section.(i) The number of components for which leaks were detected, the total number of components monitored, and the number of components for which leaks were not repaired, identifying the number of those that are determined nonrepairable, and totaled by component type.(ii) The facts that explain any delay of repairs and, where appropriate, why a CMPU shutdown was technically infeasible.(iii) For pressure relief devices subject to the requirements in § 63.11495(a)(6)(iv) include the information specified in paragraphs (d)(9)(iii)(A) through (C) of this section.(A) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(1), report the instrument readings and dates for all readings of 500 ppm or greater.(B) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(2), report the instrument readings and dates of instrument reading conducted.(C) For pressure relief devices in organic HAP service subject to § 63.165(e)(3), report each pressure release to the atmosphere, including pressure relief device identification name or number, the start date, start time, and duration (in minutes) of the pressure release; an estimate of the mass quantity in pounds of each organic HAP released; the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period; and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.(iv) For bypass lines subject to the requirements in § 63.172(j) as specified in § 63.11495(a)(6)(ix), include the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in parts per million by volume and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(v) If applicable, the compliance option selected under § 63.172(n) as specified in § 63.11495(a)(6)(ix).(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).(10) For bypass lines subject to the requirements § 63.11495(e), report the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in ppmv and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must submit the information specified in § 63.104(f)(2)(vi) instead of the heat exchange system information specified in paragraphs (d)(2) and (3) of this section.(12) If you are subject to the requirements specified in § 63.11497(e) and obtain an instrument reading greater than 500 ppmv when monitoring a pressure vessel in accordance with § 63.11497(e)(2), report an identification of the pressure vessel and a copy of the records specified in paragraph (c)(4)(vii)(B) of this section.
Citations to §63.11501(d)(3)
-
(d) You must submit semiannual compliance reports that contain the information specified in paragraphs (d)(1) through (12) of this section, as applicable. All reports must contain the company name and address (including county), as well as the beginning and ending dates of the reporting period. For periods where no events described by paragraphs (d)(1) through (12) of this section occur, a statement must be included in the report pursuant to § 63.10(e)(3)(v). Beginning on April 1, 2029, or once the report template for this subpart has been available on the CEDRI website for one year, whichever date is later, submit all subsequent reports using the appropriate electronic report template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/cedri) for this subpart and following the procedure specified in § 63.9(k). The date report templates become available will be listed on the CEDRI website. Unless the Administrator or delegated State agency or other authority has approved a different schedule for submission of reports, the report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted.(1) Before April 1, 2029 you must clearly identify any deviation from the requirements of this subpart. Beginning on April 1, 2029, for each deviation, you must report the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, a description of the method used to estimate the emissions, actions taken to minimize emissions, and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) Except as specified in paragraph (d)(11) of this section, you must include the information specified in § 63.104(f)(2) each time you invoke the delay of repair provisions for a heat exchange system with a cooling water flow rate equal to or greater than 8,000 gal/min.(3) You must provide the following information for each delay of leak repair beyond 15 days for any process equipment, storage tank, surge control vessel, bottoms receiver, and each delay of leak repair beyond 45 days for any heat exchange system with a cooling water flow rate less than 8,000 gal/min: information on the date the leak was identified, the reason for the delay in repair, and the date the leak was repaired.(4) You must report each process change that affects a compliance determination and submit a new certification of compliance with the applicable requirements in accordance with the procedures specified in paragraph (b) of this section.(5) If you comply with the alternative standard, as specified in table 2 or 3 to this subpart, report the information required in § 63.1258(b)(5).(6) Report any changes in the overlapping provisions with which you comply.(7) Report any transfer of liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) If a malfunction occurred during the reporting period, the report must include the number of instances of malfunctions that caused emissions in excess of a standard. For each malfunction that caused emissions in excess of a standard, the report must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. The report must also include a description of actions you took during a malfunction of an affected source to minimize emissions in accordance with § 63.11495(d), including actions taken to correct a malfunction. On and after April 1, 2029, malfunctions are reported as deviations under paragraph (d)(1) of this section and this paragraph (d)(8) no longer applies.(9) For each CMPU complying with the provisions of § 63.11495(a)(6), report the information listed in paragraphs (d)(9)(i) through (vi) of this section.(i) The number of components for which leaks were detected, the total number of components monitored, and the number of components for which leaks were not repaired, identifying the number of those that are determined nonrepairable, and totaled by component type.(ii) The facts that explain any delay of repairs and, where appropriate, why a CMPU shutdown was technically infeasible.(iii) For pressure relief devices subject to the requirements in § 63.11495(a)(6)(iv) include the information specified in paragraphs (d)(9)(iii)(A) through (C) of this section.(A) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(1), report the instrument readings and dates for all readings of 500 ppm or greater.(B) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(2), report the instrument readings and dates of instrument reading conducted.(C) For pressure relief devices in organic HAP service subject to § 63.165(e)(3), report each pressure release to the atmosphere, including pressure relief device identification name or number, the start date, start time, and duration (in minutes) of the pressure release; an estimate of the mass quantity in pounds of each organic HAP released; the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period; and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.(iv) For bypass lines subject to the requirements in § 63.172(j) as specified in § 63.11495(a)(6)(ix), include the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in parts per million by volume and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(v) If applicable, the compliance option selected under § 63.172(n) as specified in § 63.11495(a)(6)(ix).(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).(10) For bypass lines subject to the requirements § 63.11495(e), report the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in ppmv and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must submit the information specified in § 63.104(f)(2)(vi) instead of the heat exchange system information specified in paragraphs (d)(2) and (3) of this section.(12) If you are subject to the requirements specified in § 63.11497(e) and obtain an instrument reading greater than 500 ppmv when monitoring a pressure vessel in accordance with § 63.11497(e)(2), report an identification of the pressure vessel and a copy of the records specified in paragraph (c)(4)(vii)(B) of this section.
Citations to §63.11501(d)(4)
-
(d) You must submit semiannual compliance reports that contain the information specified in paragraphs (d)(1) through (12) of this section, as applicable. All reports must contain the company name and address (including county), as well as the beginning and ending dates of the reporting period. For periods where no events described by paragraphs (d)(1) through (12) of this section occur, a statement must be included in the report pursuant to § 63.10(e)(3)(v). Beginning on April 1, 2029, or once the report template for this subpart has been available on the CEDRI website for one year, whichever date is later, submit all subsequent reports using the appropriate electronic report template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/cedri) for this subpart and following the procedure specified in § 63.9(k). The date report templates become available will be listed on the CEDRI website. Unless the Administrator or delegated State agency or other authority has approved a different schedule for submission of reports, the report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted.(1) Before April 1, 2029 you must clearly identify any deviation from the requirements of this subpart. Beginning on April 1, 2029, for each deviation, you must report the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, a description of the method used to estimate the emissions, actions taken to minimize emissions, and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) Except as specified in paragraph (d)(11) of this section, you must include the information specified in § 63.104(f)(2) each time you invoke the delay of repair provisions for a heat exchange system with a cooling water flow rate equal to or greater than 8,000 gal/min.(3) You must provide the following information for each delay of leak repair beyond 15 days for any process equipment, storage tank, surge control vessel, bottoms receiver, and each delay of leak repair beyond 45 days for any heat exchange system with a cooling water flow rate less than 8,000 gal/min: information on the date the leak was identified, the reason for the delay in repair, and the date the leak was repaired.(4) You must report each process change that affects a compliance determination and submit a new certification of compliance with the applicable requirements in accordance with the procedures specified in paragraph (b) of this section.(5) If you comply with the alternative standard, as specified in table 2 or 3 to this subpart, report the information required in § 63.1258(b)(5).(6) Report any changes in the overlapping provisions with which you comply.(7) Report any transfer of liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) If a malfunction occurred during the reporting period, the report must include the number of instances of malfunctions that caused emissions in excess of a standard. For each malfunction that caused emissions in excess of a standard, the report must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. The report must also include a description of actions you took during a malfunction of an affected source to minimize emissions in accordance with § 63.11495(d), including actions taken to correct a malfunction. On and after April 1, 2029, malfunctions are reported as deviations under paragraph (d)(1) of this section and this paragraph (d)(8) no longer applies.(9) For each CMPU complying with the provisions of § 63.11495(a)(6), report the information listed in paragraphs (d)(9)(i) through (vi) of this section.(i) The number of components for which leaks were detected, the total number of components monitored, and the number of components for which leaks were not repaired, identifying the number of those that are determined nonrepairable, and totaled by component type.(ii) The facts that explain any delay of repairs and, where appropriate, why a CMPU shutdown was technically infeasible.(iii) For pressure relief devices subject to the requirements in § 63.11495(a)(6)(iv) include the information specified in paragraphs (d)(9)(iii)(A) through (C) of this section.(A) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(1), report the instrument readings and dates for all readings of 500 ppm or greater.(B) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(2), report the instrument readings and dates of instrument reading conducted.(C) For pressure relief devices in organic HAP service subject to § 63.165(e)(3), report each pressure release to the atmosphere, including pressure relief device identification name or number, the start date, start time, and duration (in minutes) of the pressure release; an estimate of the mass quantity in pounds of each organic HAP released; the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period; and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.(iv) For bypass lines subject to the requirements in § 63.172(j) as specified in § 63.11495(a)(6)(ix), include the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in parts per million by volume and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(v) If applicable, the compliance option selected under § 63.172(n) as specified in § 63.11495(a)(6)(ix).(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).(10) For bypass lines subject to the requirements § 63.11495(e), report the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in ppmv and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must submit the information specified in § 63.104(f)(2)(vi) instead of the heat exchange system information specified in paragraphs (d)(2) and (3) of this section.(12) If you are subject to the requirements specified in § 63.11497(e) and obtain an instrument reading greater than 500 ppmv when monitoring a pressure vessel in accordance with § 63.11497(e)(2), report an identification of the pressure vessel and a copy of the records specified in paragraph (c)(4)(vii)(B) of this section.
Citations to §63.11501(d)(5)
-
(d) You must submit semiannual compliance reports that contain the information specified in paragraphs (d)(1) through (12) of this section, as applicable. All reports must contain the company name and address (including county), as well as the beginning and ending dates of the reporting period. For periods where no events described by paragraphs (d)(1) through (12) of this section occur, a statement must be included in the report pursuant to § 63.10(e)(3)(v). Beginning on April 1, 2029, or once the report template for this subpart has been available on the CEDRI website for one year, whichever date is later, submit all subsequent reports using the appropriate electronic report template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/cedri) for this subpart and following the procedure specified in § 63.9(k). The date report templates become available will be listed on the CEDRI website. Unless the Administrator or delegated State agency or other authority has approved a different schedule for submission of reports, the report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted.(1) Before April 1, 2029 you must clearly identify any deviation from the requirements of this subpart. Beginning on April 1, 2029, for each deviation, you must report the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, a description of the method used to estimate the emissions, actions taken to minimize emissions, and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) Except as specified in paragraph (d)(11) of this section, you must include the information specified in § 63.104(f)(2) each time you invoke the delay of repair provisions for a heat exchange system with a cooling water flow rate equal to or greater than 8,000 gal/min.(3) You must provide the following information for each delay of leak repair beyond 15 days for any process equipment, storage tank, surge control vessel, bottoms receiver, and each delay of leak repair beyond 45 days for any heat exchange system with a cooling water flow rate less than 8,000 gal/min: information on the date the leak was identified, the reason for the delay in repair, and the date the leak was repaired.(4) You must report each process change that affects a compliance determination and submit a new certification of compliance with the applicable requirements in accordance with the procedures specified in paragraph (b) of this section.(5) If you comply with the alternative standard, as specified in table 2 or 3 to this subpart, report the information required in § 63.1258(b)(5).(6) Report any changes in the overlapping provisions with which you comply.(7) Report any transfer of liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) If a malfunction occurred during the reporting period, the report must include the number of instances of malfunctions that caused emissions in excess of a standard. For each malfunction that caused emissions in excess of a standard, the report must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. The report must also include a description of actions you took during a malfunction of an affected source to minimize emissions in accordance with § 63.11495(d), including actions taken to correct a malfunction. On and after April 1, 2029, malfunctions are reported as deviations under paragraph (d)(1) of this section and this paragraph (d)(8) no longer applies.(9) For each CMPU complying with the provisions of § 63.11495(a)(6), report the information listed in paragraphs (d)(9)(i) through (vi) of this section.(i) The number of components for which leaks were detected, the total number of components monitored, and the number of components for which leaks were not repaired, identifying the number of those that are determined nonrepairable, and totaled by component type.(ii) The facts that explain any delay of repairs and, where appropriate, why a CMPU shutdown was technically infeasible.(iii) For pressure relief devices subject to the requirements in § 63.11495(a)(6)(iv) include the information specified in paragraphs (d)(9)(iii)(A) through (C) of this section.(A) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(1), report the instrument readings and dates for all readings of 500 ppm or greater.(B) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(2), report the instrument readings and dates of instrument reading conducted.(C) For pressure relief devices in organic HAP service subject to § 63.165(e)(3), report each pressure release to the atmosphere, including pressure relief device identification name or number, the start date, start time, and duration (in minutes) of the pressure release; an estimate of the mass quantity in pounds of each organic HAP released; the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period; and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.(iv) For bypass lines subject to the requirements in § 63.172(j) as specified in § 63.11495(a)(6)(ix), include the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in parts per million by volume and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(v) If applicable, the compliance option selected under § 63.172(n) as specified in § 63.11495(a)(6)(ix).(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).(10) For bypass lines subject to the requirements § 63.11495(e), report the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in ppmv and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must submit the information specified in § 63.104(f)(2)(vi) instead of the heat exchange system information specified in paragraphs (d)(2) and (3) of this section.(12) If you are subject to the requirements specified in § 63.11497(e) and obtain an instrument reading greater than 500 ppmv when monitoring a pressure vessel in accordance with § 63.11497(e)(2), report an identification of the pressure vessel and a copy of the records specified in paragraph (c)(4)(vii)(B) of this section.
Citations to §63.11501(d)(6)
-
(d) You must submit semiannual compliance reports that contain the information specified in paragraphs (d)(1) through (12) of this section, as applicable. All reports must contain the company name and address (including county), as well as the beginning and ending dates of the reporting period. For periods where no events described by paragraphs (d)(1) through (12) of this section occur, a statement must be included in the report pursuant to § 63.10(e)(3)(v). Beginning on April 1, 2029, or once the report template for this subpart has been available on the CEDRI website for one year, whichever date is later, submit all subsequent reports using the appropriate electronic report template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/cedri) for this subpart and following the procedure specified in § 63.9(k). The date report templates become available will be listed on the CEDRI website. Unless the Administrator or delegated State agency or other authority has approved a different schedule for submission of reports, the report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted.(1) Before April 1, 2029 you must clearly identify any deviation from the requirements of this subpart. Beginning on April 1, 2029, for each deviation, you must report the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, a description of the method used to estimate the emissions, actions taken to minimize emissions, and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) Except as specified in paragraph (d)(11) of this section, you must include the information specified in § 63.104(f)(2) each time you invoke the delay of repair provisions for a heat exchange system with a cooling water flow rate equal to or greater than 8,000 gal/min.(3) You must provide the following information for each delay of leak repair beyond 15 days for any process equipment, storage tank, surge control vessel, bottoms receiver, and each delay of leak repair beyond 45 days for any heat exchange system with a cooling water flow rate less than 8,000 gal/min: information on the date the leak was identified, the reason for the delay in repair, and the date the leak was repaired.(4) You must report each process change that affects a compliance determination and submit a new certification of compliance with the applicable requirements in accordance with the procedures specified in paragraph (b) of this section.(5) If you comply with the alternative standard, as specified in table 2 or 3 to this subpart, report the information required in § 63.1258(b)(5).(6) Report any changes in the overlapping provisions with which you comply.(7) Report any transfer of liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) If a malfunction occurred during the reporting period, the report must include the number of instances of malfunctions that caused emissions in excess of a standard. For each malfunction that caused emissions in excess of a standard, the report must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. The report must also include a description of actions you took during a malfunction of an affected source to minimize emissions in accordance with § 63.11495(d), including actions taken to correct a malfunction. On and after April 1, 2029, malfunctions are reported as deviations under paragraph (d)(1) of this section and this paragraph (d)(8) no longer applies.(9) For each CMPU complying with the provisions of § 63.11495(a)(6), report the information listed in paragraphs (d)(9)(i) through (vi) of this section.(i) The number of components for which leaks were detected, the total number of components monitored, and the number of components for which leaks were not repaired, identifying the number of those that are determined nonrepairable, and totaled by component type.(ii) The facts that explain any delay of repairs and, where appropriate, why a CMPU shutdown was technically infeasible.(iii) For pressure relief devices subject to the requirements in § 63.11495(a)(6)(iv) include the information specified in paragraphs (d)(9)(iii)(A) through (C) of this section.(A) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(1), report the instrument readings and dates for all readings of 500 ppm or greater.(B) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(2), report the instrument readings and dates of instrument reading conducted.(C) For pressure relief devices in organic HAP service subject to § 63.165(e)(3), report each pressure release to the atmosphere, including pressure relief device identification name or number, the start date, start time, and duration (in minutes) of the pressure release; an estimate of the mass quantity in pounds of each organic HAP released; the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period; and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.(iv) For bypass lines subject to the requirements in § 63.172(j) as specified in § 63.11495(a)(6)(ix), include the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in parts per million by volume and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(v) If applicable, the compliance option selected under § 63.172(n) as specified in § 63.11495(a)(6)(ix).(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).(10) For bypass lines subject to the requirements § 63.11495(e), report the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in ppmv and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must submit the information specified in § 63.104(f)(2)(vi) instead of the heat exchange system information specified in paragraphs (d)(2) and (3) of this section.(12) If you are subject to the requirements specified in § 63.11497(e) and obtain an instrument reading greater than 500 ppmv when monitoring a pressure vessel in accordance with § 63.11497(e)(2), report an identification of the pressure vessel and a copy of the records specified in paragraph (c)(4)(vii)(B) of this section.
Citations to §63.11501(d)(7)
-
(d) You must submit semiannual compliance reports that contain the information specified in paragraphs (d)(1) through (12) of this section, as applicable. All reports must contain the company name and address (including county), as well as the beginning and ending dates of the reporting period. For periods where no events described by paragraphs (d)(1) through (12) of this section occur, a statement must be included in the report pursuant to § 63.10(e)(3)(v). Beginning on April 1, 2029, or once the report template for this subpart has been available on the CEDRI website for one year, whichever date is later, submit all subsequent reports using the appropriate electronic report template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/cedri) for this subpart and following the procedure specified in § 63.9(k). The date report templates become available will be listed on the CEDRI website. Unless the Administrator or delegated State agency or other authority has approved a different schedule for submission of reports, the report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted.(1) Before April 1, 2029 you must clearly identify any deviation from the requirements of this subpart. Beginning on April 1, 2029, for each deviation, you must report the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, a description of the method used to estimate the emissions, actions taken to minimize emissions, and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) Except as specified in paragraph (d)(11) of this section, you must include the information specified in § 63.104(f)(2) each time you invoke the delay of repair provisions for a heat exchange system with a cooling water flow rate equal to or greater than 8,000 gal/min.(3) You must provide the following information for each delay of leak repair beyond 15 days for any process equipment, storage tank, surge control vessel, bottoms receiver, and each delay of leak repair beyond 45 days for any heat exchange system with a cooling water flow rate less than 8,000 gal/min: information on the date the leak was identified, the reason for the delay in repair, and the date the leak was repaired.(4) You must report each process change that affects a compliance determination and submit a new certification of compliance with the applicable requirements in accordance with the procedures specified in paragraph (b) of this section.(5) If you comply with the alternative standard, as specified in table 2 or 3 to this subpart, report the information required in § 63.1258(b)(5).(6) Report any changes in the overlapping provisions with which you comply.(7) Report any transfer of liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) If a malfunction occurred during the reporting period, the report must include the number of instances of malfunctions that caused emissions in excess of a standard. For each malfunction that caused emissions in excess of a standard, the report must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. The report must also include a description of actions you took during a malfunction of an affected source to minimize emissions in accordance with § 63.11495(d), including actions taken to correct a malfunction. On and after April 1, 2029, malfunctions are reported as deviations under paragraph (d)(1) of this section and this paragraph (d)(8) no longer applies.(9) For each CMPU complying with the provisions of § 63.11495(a)(6), report the information listed in paragraphs (d)(9)(i) through (vi) of this section.(i) The number of components for which leaks were detected, the total number of components monitored, and the number of components for which leaks were not repaired, identifying the number of those that are determined nonrepairable, and totaled by component type.(ii) The facts that explain any delay of repairs and, where appropriate, why a CMPU shutdown was technically infeasible.(iii) For pressure relief devices subject to the requirements in § 63.11495(a)(6)(iv) include the information specified in paragraphs (d)(9)(iii)(A) through (C) of this section.(A) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(1), report the instrument readings and dates for all readings of 500 ppm or greater.(B) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(2), report the instrument readings and dates of instrument reading conducted.(C) For pressure relief devices in organic HAP service subject to § 63.165(e)(3), report each pressure release to the atmosphere, including pressure relief device identification name or number, the start date, start time, and duration (in minutes) of the pressure release; an estimate of the mass quantity in pounds of each organic HAP released; the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period; and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.(iv) For bypass lines subject to the requirements in § 63.172(j) as specified in § 63.11495(a)(6)(ix), include the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in parts per million by volume and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(v) If applicable, the compliance option selected under § 63.172(n) as specified in § 63.11495(a)(6)(ix).(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).(10) For bypass lines subject to the requirements § 63.11495(e), report the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in ppmv and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must submit the information specified in § 63.104(f)(2)(vi) instead of the heat exchange system information specified in paragraphs (d)(2) and (3) of this section.(12) If you are subject to the requirements specified in § 63.11497(e) and obtain an instrument reading greater than 500 ppmv when monitoring a pressure vessel in accordance with § 63.11497(e)(2), report an identification of the pressure vessel and a copy of the records specified in paragraph (c)(4)(vii)(B) of this section.
Citations to §63.11501(d)(8)
-
(d) You must submit semiannual compliance reports that contain the information specified in paragraphs (d)(1) through (12) of this section, as applicable. All reports must contain the company name and address (including county), as well as the beginning and ending dates of the reporting period. For periods where no events described by paragraphs (d)(1) through (12) of this section occur, a statement must be included in the report pursuant to § 63.10(e)(3)(v). Beginning on April 1, 2029, or once the report template for this subpart has been available on the CEDRI website for one year, whichever date is later, submit all subsequent reports using the appropriate electronic report template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/cedri) for this subpart and following the procedure specified in § 63.9(k). The date report templates become available will be listed on the CEDRI website. Unless the Administrator or delegated State agency or other authority has approved a different schedule for submission of reports, the report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted.(1) Before April 1, 2029 you must clearly identify any deviation from the requirements of this subpart. Beginning on April 1, 2029, for each deviation, you must report the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, a description of the method used to estimate the emissions, actions taken to minimize emissions, and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) Except as specified in paragraph (d)(11) of this section, you must include the information specified in § 63.104(f)(2) each time you invoke the delay of repair provisions for a heat exchange system with a cooling water flow rate equal to or greater than 8,000 gal/min.(3) You must provide the following information for each delay of leak repair beyond 15 days for any process equipment, storage tank, surge control vessel, bottoms receiver, and each delay of leak repair beyond 45 days for any heat exchange system with a cooling water flow rate less than 8,000 gal/min: information on the date the leak was identified, the reason for the delay in repair, and the date the leak was repaired.(4) You must report each process change that affects a compliance determination and submit a new certification of compliance with the applicable requirements in accordance with the procedures specified in paragraph (b) of this section.(5) If you comply with the alternative standard, as specified in table 2 or 3 to this subpart, report the information required in § 63.1258(b)(5).(6) Report any changes in the overlapping provisions with which you comply.(7) Report any transfer of liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) If a malfunction occurred during the reporting period, the report must include the number of instances of malfunctions that caused emissions in excess of a standard. For each malfunction that caused emissions in excess of a standard, the report must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. The report must also include a description of actions you took during a malfunction of an affected source to minimize emissions in accordance with § 63.11495(d), including actions taken to correct a malfunction. On and after April 1, 2029, malfunctions are reported as deviations under paragraph (d)(1) of this section and this paragraph (d)(8) no longer applies.(9) For each CMPU complying with the provisions of § 63.11495(a)(6), report the information listed in paragraphs (d)(9)(i) through (vi) of this section.(i) The number of components for which leaks were detected, the total number of components monitored, and the number of components for which leaks were not repaired, identifying the number of those that are determined nonrepairable, and totaled by component type.(ii) The facts that explain any delay of repairs and, where appropriate, why a CMPU shutdown was technically infeasible.(iii) For pressure relief devices subject to the requirements in § 63.11495(a)(6)(iv) include the information specified in paragraphs (d)(9)(iii)(A) through (C) of this section.(A) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(1), report the instrument readings and dates for all readings of 500 ppm or greater.(B) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(2), report the instrument readings and dates of instrument reading conducted.(C) For pressure relief devices in organic HAP service subject to § 63.165(e)(3), report each pressure release to the atmosphere, including pressure relief device identification name or number, the start date, start time, and duration (in minutes) of the pressure release; an estimate of the mass quantity in pounds of each organic HAP released; the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period; and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.(iv) For bypass lines subject to the requirements in § 63.172(j) as specified in § 63.11495(a)(6)(ix), include the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in parts per million by volume and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(v) If applicable, the compliance option selected under § 63.172(n) as specified in § 63.11495(a)(6)(ix).(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).(10) For bypass lines subject to the requirements § 63.11495(e), report the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in ppmv and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must submit the information specified in § 63.104(f)(2)(vi) instead of the heat exchange system information specified in paragraphs (d)(2) and (3) of this section.(12) If you are subject to the requirements specified in § 63.11497(e) and obtain an instrument reading greater than 500 ppmv when monitoring a pressure vessel in accordance with § 63.11497(e)(2), report an identification of the pressure vessel and a copy of the records specified in paragraph (c)(4)(vii)(B) of this section.
Citations to §63.11501(d)(9)
-
(xiv) Submit the Semiannual Compliance Report as specified in § 63.11501(d)(9).
-
(d) You must submit semiannual compliance reports that contain the information specified in paragraphs (d)(1) through (12) of this section, as applicable. All reports must contain the company name and address (including county), as well as the beginning and ending dates of the reporting period. For periods where no events described by paragraphs (d)(1) through (12) of this section occur, a statement must be included in the report pursuant to § 63.10(e)(3)(v). Beginning on April 1, 2029, or once the report template for this subpart has been available on the CEDRI website for one year, whichever date is later, submit all subsequent reports using the appropriate electronic report template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/cedri) for this subpart and following the procedure specified in § 63.9(k). The date report templates become available will be listed on the CEDRI website. Unless the Administrator or delegated State agency or other authority has approved a different schedule for submission of reports, the report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted.(1) Before April 1, 2029 you must clearly identify any deviation from the requirements of this subpart. Beginning on April 1, 2029, for each deviation, you must report the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, a description of the method used to estimate the emissions, actions taken to minimize emissions, and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) Except as specified in paragraph (d)(11) of this section, you must include the information specified in § 63.104(f)(2) each time you invoke the delay of repair provisions for a heat exchange system with a cooling water flow rate equal to or greater than 8,000 gal/min.(3) You must provide the following information for each delay of leak repair beyond 15 days for any process equipment, storage tank, surge control vessel, bottoms receiver, and each delay of leak repair beyond 45 days for any heat exchange system with a cooling water flow rate less than 8,000 gal/min: information on the date the leak was identified, the reason for the delay in repair, and the date the leak was repaired.(4) You must report each process change that affects a compliance determination and submit a new certification of compliance with the applicable requirements in accordance with the procedures specified in paragraph (b) of this section.(5) If you comply with the alternative standard, as specified in table 2 or 3 to this subpart, report the information required in § 63.1258(b)(5).(6) Report any changes in the overlapping provisions with which you comply.(7) Report any transfer of liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) If a malfunction occurred during the reporting period, the report must include the number of instances of malfunctions that caused emissions in excess of a standard. For each malfunction that caused emissions in excess of a standard, the report must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. The report must also include a description of actions you took during a malfunction of an affected source to minimize emissions in accordance with § 63.11495(d), including actions taken to correct a malfunction. On and after April 1, 2029, malfunctions are reported as deviations under paragraph (d)(1) of this section and this paragraph (d)(8) no longer applies.(9) For each CMPU complying with the provisions of § 63.11495(a)(6), report the information listed in paragraphs (d)(9)(i) through (vi) of this section.(i) The number of components for which leaks were detected, the total number of components monitored, and the number of components for which leaks were not repaired, identifying the number of those that are determined nonrepairable, and totaled by component type.(ii) The facts that explain any delay of repairs and, where appropriate, why a CMPU shutdown was technically infeasible.(iii) For pressure relief devices subject to the requirements in § 63.11495(a)(6)(iv) include the information specified in paragraphs (d)(9)(iii)(A) through (C) of this section.(A) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(1), report the instrument readings and dates for all readings of 500 ppm or greater.(B) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(2), report the instrument readings and dates of instrument reading conducted.(C) For pressure relief devices in organic HAP service subject to § 63.165(e)(3), report each pressure release to the atmosphere, including pressure relief device identification name or number, the start date, start time, and duration (in minutes) of the pressure release; an estimate of the mass quantity in pounds of each organic HAP released; the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period; and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.(iv) For bypass lines subject to the requirements in § 63.172(j) as specified in § 63.11495(a)(6)(ix), include the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in parts per million by volume and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(v) If applicable, the compliance option selected under § 63.172(n) as specified in § 63.11495(a)(6)(ix).(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).(10) For bypass lines subject to the requirements § 63.11495(e), report the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in ppmv and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must submit the information specified in § 63.104(f)(2)(vi) instead of the heat exchange system information specified in paragraphs (d)(2) and (3) of this section.(12) If you are subject to the requirements specified in § 63.11497(e) and obtain an instrument reading greater than 500 ppmv when monitoring a pressure vessel in accordance with § 63.11497(e)(2), report an identification of the pressure vessel and a copy of the records specified in paragraph (c)(4)(vii)(B) of this section.
Citations to §63.11501(d)(9)(i)
-
(9) For each CMPU complying with the provisions of § 63.11495(a)(6), report the information listed in paragraphs (d)(9)(i) through (vi) of this section.(i) The number of components for which leaks were detected, the total number of components monitored, and the number of components for which leaks were not repaired, identifying the number of those that are determined nonrepairable, and totaled by component type.(ii) The facts that explain any delay of repairs and, where appropriate, why a CMPU shutdown was technically infeasible.(iii) For pressure relief devices subject to the requirements in § 63.11495(a)(6)(iv) include the information specified in paragraphs (d)(9)(iii)(A) through (C) of this section.(A) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(1), report the instrument readings and dates for all readings of 500 ppm or greater.(B) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(2), report the instrument readings and dates of instrument reading conducted.(C) For pressure relief devices in organic HAP service subject to § 63.165(e)(3), report each pressure release to the atmosphere, including pressure relief device identification name or number, the start date, start time, and duration (in minutes) of the pressure release; an estimate of the mass quantity in pounds of each organic HAP released; the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period; and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.(iv) For bypass lines subject to the requirements in § 63.172(j) as specified in § 63.11495(a)(6)(ix), include the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in parts per million by volume and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(v) If applicable, the compliance option selected under § 63.172(n) as specified in § 63.11495(a)(6)(ix).(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).
Citations to §63.11501(d)(9)(iii)(A)
-
(iii) For pressure relief devices subject to the requirements in § 63.11495(a)(6)(iv) include the information specified in paragraphs (d)(9)(iii)(A) through (C) of this section.(A) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(1), report the instrument readings and dates for all readings of 500 ppm or greater.(B) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(2), report the instrument readings and dates of instrument reading conducted.(C) For pressure relief devices in organic HAP service subject to § 63.165(e)(3), report each pressure release to the atmosphere, including pressure relief device identification name or number, the start date, start time, and duration (in minutes) of the pressure release; an estimate of the mass quantity in pounds of each organic HAP released; the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period; and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.
Citations to §63.11501(d)(9)(iii)(B)
-
(iii) For pressure relief devices subject to the requirements in § 63.11495(a)(6)(iv) include the information specified in paragraphs (d)(9)(iii)(A) through (C) of this section.(A) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(1), report the instrument readings and dates for all readings of 500 ppm or greater.(B) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(2), report the instrument readings and dates of instrument reading conducted.(C) For pressure relief devices in organic HAP service subject to § 63.165(e)(3), report each pressure release to the atmosphere, including pressure relief device identification name or number, the start date, start time, and duration (in minutes) of the pressure release; an estimate of the mass quantity in pounds of each organic HAP released; the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period; and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.
Citations to §63.11501(d)(9)(iii)(C)
-
(iii) For pressure relief devices subject to the requirements in § 63.11495(a)(6)(iv) include the information specified in paragraphs (d)(9)(iii)(A) through (C) of this section.(A) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(1), report the instrument readings and dates for all readings of 500 ppm or greater.(B) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(2), report the instrument readings and dates of instrument reading conducted.(C) For pressure relief devices in organic HAP service subject to § 63.165(e)(3), report each pressure release to the atmosphere, including pressure relief device identification name or number, the start date, start time, and duration (in minutes) of the pressure release; an estimate of the mass quantity in pounds of each organic HAP released; the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period; and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.
Citations to §63.11501(d)(9)(vi)(A)
-
(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).
Citations to §63.11501(d)(9)(vi)(B)
-
(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).
Citations to §63.11501(d)(9)(vi)(C)
-
(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).
Citations to §63.11501(d)(9)(vi)(D)
-
(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).
Citations to §63.11501(d)(9)(vi)(E)
-
(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).
Citations to §63.11501(d)(10)
-
(d) You must submit semiannual compliance reports that contain the information specified in paragraphs (d)(1) through (12) of this section, as applicable. All reports must contain the company name and address (including county), as well as the beginning and ending dates of the reporting period. For periods where no events described by paragraphs (d)(1) through (12) of this section occur, a statement must be included in the report pursuant to § 63.10(e)(3)(v). Beginning on April 1, 2029, or once the report template for this subpart has been available on the CEDRI website for one year, whichever date is later, submit all subsequent reports using the appropriate electronic report template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/cedri) for this subpart and following the procedure specified in § 63.9(k). The date report templates become available will be listed on the CEDRI website. Unless the Administrator or delegated State agency or other authority has approved a different schedule for submission of reports, the report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted.(1) Before April 1, 2029 you must clearly identify any deviation from the requirements of this subpart. Beginning on April 1, 2029, for each deviation, you must report the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, a description of the method used to estimate the emissions, actions taken to minimize emissions, and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) Except as specified in paragraph (d)(11) of this section, you must include the information specified in § 63.104(f)(2) each time you invoke the delay of repair provisions for a heat exchange system with a cooling water flow rate equal to or greater than 8,000 gal/min.(3) You must provide the following information for each delay of leak repair beyond 15 days for any process equipment, storage tank, surge control vessel, bottoms receiver, and each delay of leak repair beyond 45 days for any heat exchange system with a cooling water flow rate less than 8,000 gal/min: information on the date the leak was identified, the reason for the delay in repair, and the date the leak was repaired.(4) You must report each process change that affects a compliance determination and submit a new certification of compliance with the applicable requirements in accordance with the procedures specified in paragraph (b) of this section.(5) If you comply with the alternative standard, as specified in table 2 or 3 to this subpart, report the information required in § 63.1258(b)(5).(6) Report any changes in the overlapping provisions with which you comply.(7) Report any transfer of liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) If a malfunction occurred during the reporting period, the report must include the number of instances of malfunctions that caused emissions in excess of a standard. For each malfunction that caused emissions in excess of a standard, the report must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. The report must also include a description of actions you took during a malfunction of an affected source to minimize emissions in accordance with § 63.11495(d), including actions taken to correct a malfunction. On and after April 1, 2029, malfunctions are reported as deviations under paragraph (d)(1) of this section and this paragraph (d)(8) no longer applies.(9) For each CMPU complying with the provisions of § 63.11495(a)(6), report the information listed in paragraphs (d)(9)(i) through (vi) of this section.(i) The number of components for which leaks were detected, the total number of components monitored, and the number of components for which leaks were not repaired, identifying the number of those that are determined nonrepairable, and totaled by component type.(ii) The facts that explain any delay of repairs and, where appropriate, why a CMPU shutdown was technically infeasible.(iii) For pressure relief devices subject to the requirements in § 63.11495(a)(6)(iv) include the information specified in paragraphs (d)(9)(iii)(A) through (C) of this section.(A) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(1), report the instrument readings and dates for all readings of 500 ppm or greater.(B) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(2), report the instrument readings and dates of instrument reading conducted.(C) For pressure relief devices in organic HAP service subject to § 63.165(e)(3), report each pressure release to the atmosphere, including pressure relief device identification name or number, the start date, start time, and duration (in minutes) of the pressure release; an estimate of the mass quantity in pounds of each organic HAP released; the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period; and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.(iv) For bypass lines subject to the requirements in § 63.172(j) as specified in § 63.11495(a)(6)(ix), include the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in parts per million by volume and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(v) If applicable, the compliance option selected under § 63.172(n) as specified in § 63.11495(a)(6)(ix).(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).(10) For bypass lines subject to the requirements § 63.11495(e), report the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in ppmv and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must submit the information specified in § 63.104(f)(2)(vi) instead of the heat exchange system information specified in paragraphs (d)(2) and (3) of this section.(12) If you are subject to the requirements specified in § 63.11497(e) and obtain an instrument reading greater than 500 ppmv when monitoring a pressure vessel in accordance with § 63.11497(e)(2), report an identification of the pressure vessel and a copy of the records specified in paragraph (c)(4)(vii)(B) of this section.
Citations to §63.11501(d)(11)
-
(d) You must submit semiannual compliance reports that contain the information specified in paragraphs (d)(1) through (12) of this section, as applicable. All reports must contain the company name and address (including county), as well as the beginning and ending dates of the reporting period. For periods where no events described by paragraphs (d)(1) through (12) of this section occur, a statement must be included in the report pursuant to § 63.10(e)(3)(v). Beginning on April 1, 2029, or once the report template for this subpart has been available on the CEDRI website for one year, whichever date is later, submit all subsequent reports using the appropriate electronic report template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/cedri) for this subpart and following the procedure specified in § 63.9(k). The date report templates become available will be listed on the CEDRI website. Unless the Administrator or delegated State agency or other authority has approved a different schedule for submission of reports, the report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted.(1) Before April 1, 2029 you must clearly identify any deviation from the requirements of this subpart. Beginning on April 1, 2029, for each deviation, you must report the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, a description of the method used to estimate the emissions, actions taken to minimize emissions, and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) Except as specified in paragraph (d)(11) of this section, you must include the information specified in § 63.104(f)(2) each time you invoke the delay of repair provisions for a heat exchange system with a cooling water flow rate equal to or greater than 8,000 gal/min.(3) You must provide the following information for each delay of leak repair beyond 15 days for any process equipment, storage tank, surge control vessel, bottoms receiver, and each delay of leak repair beyond 45 days for any heat exchange system with a cooling water flow rate less than 8,000 gal/min: information on the date the leak was identified, the reason for the delay in repair, and the date the leak was repaired.(4) You must report each process change that affects a compliance determination and submit a new certification of compliance with the applicable requirements in accordance with the procedures specified in paragraph (b) of this section.(5) If you comply with the alternative standard, as specified in table 2 or 3 to this subpart, report the information required in § 63.1258(b)(5).(6) Report any changes in the overlapping provisions with which you comply.(7) Report any transfer of liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) If a malfunction occurred during the reporting period, the report must include the number of instances of malfunctions that caused emissions in excess of a standard. For each malfunction that caused emissions in excess of a standard, the report must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. The report must also include a description of actions you took during a malfunction of an affected source to minimize emissions in accordance with § 63.11495(d), including actions taken to correct a malfunction. On and after April 1, 2029, malfunctions are reported as deviations under paragraph (d)(1) of this section and this paragraph (d)(8) no longer applies.(9) For each CMPU complying with the provisions of § 63.11495(a)(6), report the information listed in paragraphs (d)(9)(i) through (vi) of this section.(i) The number of components for which leaks were detected, the total number of components monitored, and the number of components for which leaks were not repaired, identifying the number of those that are determined nonrepairable, and totaled by component type.(ii) The facts that explain any delay of repairs and, where appropriate, why a CMPU shutdown was technically infeasible.(iii) For pressure relief devices subject to the requirements in § 63.11495(a)(6)(iv) include the information specified in paragraphs (d)(9)(iii)(A) through (C) of this section.(A) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(1), report the instrument readings and dates for all readings of 500 ppm or greater.(B) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(2), report the instrument readings and dates of instrument reading conducted.(C) For pressure relief devices in organic HAP service subject to § 63.165(e)(3), report each pressure release to the atmosphere, including pressure relief device identification name or number, the start date, start time, and duration (in minutes) of the pressure release; an estimate of the mass quantity in pounds of each organic HAP released; the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period; and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.(iv) For bypass lines subject to the requirements in § 63.172(j) as specified in § 63.11495(a)(6)(ix), include the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in parts per million by volume and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(v) If applicable, the compliance option selected under § 63.172(n) as specified in § 63.11495(a)(6)(ix).(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).(10) For bypass lines subject to the requirements § 63.11495(e), report the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in ppmv and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must submit the information specified in § 63.104(f)(2)(vi) instead of the heat exchange system information specified in paragraphs (d)(2) and (3) of this section.(12) If you are subject to the requirements specified in § 63.11497(e) and obtain an instrument reading greater than 500 ppmv when monitoring a pressure vessel in accordance with § 63.11497(e)(2), report an identification of the pressure vessel and a copy of the records specified in paragraph (c)(4)(vii)(B) of this section.
Citations to §63.11501(d)(12)
-
(d) You must submit semiannual compliance reports that contain the information specified in paragraphs (d)(1) through (12) of this section, as applicable. All reports must contain the company name and address (including county), as well as the beginning and ending dates of the reporting period. For periods where no events described by paragraphs (d)(1) through (12) of this section occur, a statement must be included in the report pursuant to § 63.10(e)(3)(v). Beginning on April 1, 2029, or once the report template for this subpart has been available on the CEDRI website for one year, whichever date is later, submit all subsequent reports using the appropriate electronic report template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/cedri) for this subpart and following the procedure specified in § 63.9(k). The date report templates become available will be listed on the CEDRI website. Unless the Administrator or delegated State agency or other authority has approved a different schedule for submission of reports, the report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted.(1) Before April 1, 2029 you must clearly identify any deviation from the requirements of this subpart. Beginning on April 1, 2029, for each deviation, you must report the start date, start time, duration in hours, cause, a list of the affected sources or equipment, an estimate of the quantity of each regulated pollutant emitted over any emission limit, a description of the method used to estimate the emissions, actions taken to minimize emissions, and any corrective action taken to return the affected unit to its normal or usual manner of operation.(2) Except as specified in paragraph (d)(11) of this section, you must include the information specified in § 63.104(f)(2) each time you invoke the delay of repair provisions for a heat exchange system with a cooling water flow rate equal to or greater than 8,000 gal/min.(3) You must provide the following information for each delay of leak repair beyond 15 days for any process equipment, storage tank, surge control vessel, bottoms receiver, and each delay of leak repair beyond 45 days for any heat exchange system with a cooling water flow rate less than 8,000 gal/min: information on the date the leak was identified, the reason for the delay in repair, and the date the leak was repaired.(4) You must report each process change that affects a compliance determination and submit a new certification of compliance with the applicable requirements in accordance with the procedures specified in paragraph (b) of this section.(5) If you comply with the alternative standard, as specified in table 2 or 3 to this subpart, report the information required in § 63.1258(b)(5).(6) Report any changes in the overlapping provisions with which you comply.(7) Report any transfer of liquids that are reactive or resinous materials, as defined in § 63.11502(b), and not included in the NOCS.(8) If a malfunction occurred during the reporting period, the report must include the number of instances of malfunctions that caused emissions in excess of a standard. For each malfunction that caused emissions in excess of a standard, the report must include a list of the affected sources or equipment, an estimate of the volume of each regulated pollutant emitted over the standard, and a description of the method used to estimate the emissions. The report must also include a description of actions you took during a malfunction of an affected source to minimize emissions in accordance with § 63.11495(d), including actions taken to correct a malfunction. On and after April 1, 2029, malfunctions are reported as deviations under paragraph (d)(1) of this section and this paragraph (d)(8) no longer applies.(9) For each CMPU complying with the provisions of § 63.11495(a)(6), report the information listed in paragraphs (d)(9)(i) through (vi) of this section.(i) The number of components for which leaks were detected, the total number of components monitored, and the number of components for which leaks were not repaired, identifying the number of those that are determined nonrepairable, and totaled by component type.(ii) The facts that explain any delay of repairs and, where appropriate, why a CMPU shutdown was technically infeasible.(iii) For pressure relief devices subject to the requirements in § 63.11495(a)(6)(iv) include the information specified in paragraphs (d)(9)(iii)(A) through (C) of this section.(A) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(1), report the instrument readings and dates for all readings of 500 ppm or greater.(B) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(2), report the instrument readings and dates of instrument reading conducted.(C) For pressure relief devices in organic HAP service subject to § 63.165(e)(3), report each pressure release to the atmosphere, including pressure relief device identification name or number, the start date, start time, and duration (in minutes) of the pressure release; an estimate of the mass quantity in pounds of each organic HAP released; the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period; and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.(iv) For bypass lines subject to the requirements in § 63.172(j) as specified in § 63.11495(a)(6)(ix), include the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in parts per million by volume and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(v) If applicable, the compliance option selected under § 63.172(n) as specified in § 63.11495(a)(6)(ix).(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).(10) For bypass lines subject to the requirements § 63.11495(e), report the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in ppmv and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(11) If you are subject to the requirements specified in item 1.c of table 8 to this subpart (for heat exchange systems with a cooling water flow rate greater than or equal to 8,000 gal/min), then you must submit the information specified in § 63.104(f)(2)(vi) instead of the heat exchange system information specified in paragraphs (d)(2) and (3) of this section.(12) If you are subject to the requirements specified in § 63.11497(e) and obtain an instrument reading greater than 500 ppmv when monitoring a pressure vessel in accordance with § 63.11497(e)(2), report an identification of the pressure vessel and a copy of the records specified in paragraph (c)(4)(vii)(B) of this section.
Citations to §63.11501(d)(vi)
-
(9) For each CMPU complying with the provisions of § 63.11495(a)(6), report the information listed in paragraphs (d)(9)(i) through (vi) of this section.(i) The number of components for which leaks were detected, the total number of components monitored, and the number of components for which leaks were not repaired, identifying the number of those that are determined nonrepairable, and totaled by component type.(ii) The facts that explain any delay of repairs and, where appropriate, why a CMPU shutdown was technically infeasible.(iii) For pressure relief devices subject to the requirements in § 63.11495(a)(6)(iv) include the information specified in paragraphs (d)(9)(iii)(A) through (C) of this section.(A) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(1), report the instrument readings and dates for all readings of 500 ppm or greater.(B) For pressure relief devices in organic HAP gas or vapor service, pursuant to § 63.165(e)(2), report the instrument readings and dates of instrument reading conducted.(C) For pressure relief devices in organic HAP service subject to § 63.165(e)(3), report each pressure release to the atmosphere, including pressure relief device identification name or number, the start date, start time, and duration (in minutes) of the pressure release; an estimate of the mass quantity in pounds of each organic HAP released; the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period; and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.(iv) For bypass lines subject to the requirements in § 63.172(j) as specified in § 63.11495(a)(6)(ix), include the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in parts per million by volume and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours.(v) If applicable, the compliance option selected under § 63.172(n) as specified in § 63.11495(a)(6)(ix).(vi) If you elect to meet the requirements in § 63.178(b) as specified in § 63.11495(a)(6)(xi), include the information listed in paragraphs (d)(9)(vi)(A) through (E) of this section.(A) Batch product process equipment train identification;(B) The number of pressure tests conducted;(C) The number of pressure tests where the equipment train failed the pressure test;(D) The facts that explain any delay of repairs; and(E) The results of all monitoring to determine compliance with § 63.172(f).