(a) Sections 49.4169 through 49.4184 establish legally and practicably enforceable requirements for oil and natural gas sources on Indian country lands within the Uintah and Ouray Indian Reservation (U&O Reservation) to address ozone air quality. Section 49.4170 establishes provisions for delegation of authority to allow the Ute Indian Tribe to assist the EPA with administration of this Federal Implementation Plan (U&O FIP). Section 49.4171 contains general provisions and definitions applicable to oil and natural gas sources. Sections 49.4173 through 49.4184 establish legally and practicably enforceable requirements to control and reduce VOC emissions from oil and natural gas well production and storage operations, natural gas processing, and gathering and boosting operations at oil and natural gas sources that are located on Indian country lands within the U&O Reservation.
-
(a) At all times, including periods of startup, shutdown, and malfunction, each owner or operator must, to the extent practicable, design, operate, and maintain all equipment used for crude oil, condensate, intermediate hydrocarbon liquid, or produced water, and gas collection, storage, processing, and handling operations covered under §§ 49.4171 and 49.4173 through 49.4184, regardless of emissions rate and including associated air pollution control equipment, in a manner that is consistent with good air pollution control practices and that minimizes leakage of VOC emissions to the atmosphere. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available to the Administrator, including monitoring results, review of operating and maintenance procedures, and inspection of the source.
-
(3) For each oil and natural gas source, a summary of the required records specified in § 49.4183 that are identified in paragraphs (b)(3)(i) through (iv) of this section as they relate to the source's compliance with the requirements of §§ 49.4173 through 49.4183.(i) For each enclosed combustor or flare at an oil and natural gas source required under §§ 49.4173 through 49.4177:(A) Records of any instances in which the pilot flame is not present or the monitoring equipment is not functioning, the date and times of the occurrence, the corrective actions taken, and any preventative measures adopted to prevent recurrence of the occurrence; and(B) Records of any time periods in which visible smoke emissions are observed emanating from the enclosed combustor or flare.(A) Records of any instances in which any closed-vent system or control device was bypassed or down, the reason for each incident, its duration, the corrective actions taken, and any preventative measures adopted to avoid such bypasses or downtimes; and(B) Records of any instances of defects identified during the monthly inspection required in § 49.4182(c), including:(1) The date of the inspection;(2) The findings of the inspection;(3) Date and description of corrective adjustments or repairs made as a result of the inspection or reason for delay of repair; and(A) The date of the inspection;(B) Identification of any component that was determined to be leaking;(C) Identification of any component designated difficult-to-monitor or unsafe-to-monitor that was not inspected and the reason it was not inspected;(D) The date of repair of each leaking component;(E) Identification of any leaking component with a delayed repair, the reason for the delayed repair and the emission estimates associated with any shutdown and repair if the delay is longer than 6 months;(F) The date and description of any corrective action taken, including the date the component was verified to no longer be leaking;(G) The inspector's name or identification number;(H) For each well site complying with § 49.4178(c)(2), you must specify that the well site is exempt from the requirements of § 49.4178(d) and submit the average daily production for the well site; and(iv) For each pneumatic controller with a natural gas bleed rate greater than the applicable standard, records of the reason for the use of the controller.
Citations to §49.4178(b)(2)
-
(11) For each well site complying with either § 49.4178(b)(2) or § 49.4178(c)(2), you must maintain records of the rolling 12-month average daily production no later than 12 months before complying with § 49.4178(b)(2) or § 49.4178(c)(2).
Citations to §49.4178(c)(2)
-
(11) For each well site complying with either § 49.4178(b)(2) or § 49.4178(c)(2), you must maintain records of the rolling 12-month average daily production no later than 12 months before complying with § 49.4178(b)(2) or § 49.4178(c)(2).
-
(H) For each well site complying with § 49.4178(c)(2), you must specify that the well site is exempt from the requirements of § 49.4178(d) and submit the average daily production for the well site; and
Citations to §49.4178(d)
-
(10) Documentation of each fugitive emissions inspection conducted in accordance with § 49.4178(d). All inspection records must include the following information:(i) The date of the inspection;(ii) The identification of any component that was determined to be leaking;(iii) The identification of any component designated difficult-to-monitor or unsafe-to-monitor that was not inspected, and the reason it was not inspected;(iv) The date of the first attempt to repair the leaking component;(v) The identification of any leaking component with a delayed repair and the reason for the delayed repair:(A) (1) The date of ordering a replacement component; and(2) The date the replacement component was received; and(B) (1) The reason the repair is technically infeasible;(2) The date of the shutdown;(3) The date of subsequent startup after a shutdown; and(4) Emission estimates of the shutdown and the repair if the delay is longer than 6 months;(vi) The date and description of any corrective action taken, including the date the component was verified to no longer be leaking;(vii) The identification of each component exempt under § 49.4178(d)(2), including the type of component and a description of the qualifying exemption; and
-
(H) For each well site complying with § 49.4178(c)(2), you must specify that the well site is exempt from the requirements of § 49.4178(d) and submit the average daily production for the well site; and
Citations to §49.4178(d)(1)
-
(2) Conduct optical gas imaging inspections of each cover and closed vent system for any visible emissions at the same frequency as the frequency for the collection of fugitive emissions components located at the oil and natural gas source, as specified in § 49.4178(d)(1).
Citations to §49.4178(d)(1)(ii)
-
(iii) All Indian allotments, the Indian titles to which have not been extinguished, including rights-of-way running through the same.Intermediate hydrocarbon liquids means any naturally occurring, unrefined petroleum liquid.Malfunction alarm and remote notification system means a system connected to an electronically controlled automatic ignition device that sends an alarm through a remote notification system to an owner or operator's central control center, if an attempt to relight the pilot flame is unsuccessful.Pneumatic controller means a natural gas-driven pneumatic controller as defined at 40 CFR 60.5430 and 60.5430a.Pneumatic pump means a natural gas-driven diaphragm pump as defined at 40 CFR 60.5430a.Pneumatic pump emissions means the VOC-containing emissions from pneumatic pumps.Produced natural gas means natural gas that is separated from extracted reservoir fluids during oil and natural gas production operations.Produced water means water that is extracted from the earth from an oil or natural gas production well, or that is separated from crude oil, condensate, or natural gas after extraction.Regional Administrator means the Regional Administrator of EPA Region 8 or an authorized representative of the Regional Administrator of EPA Region 8, except to the extent otherwise specifically specified in a Delegation of Authority Agreement between the Regional Administrator and the Ute Indian Tribe.Repaired means, for the purposes of fugitive emissions components, that fugitive emissions components are adjusted, replaced, or otherwise altered in order to eliminate fugitive emissions as defined in § 49.4178(d)(1)(iii), and subsequently monitored as specified in § 49.4178(d)(1)(ii), and that it is verified that emissions from the fugitive emissions components are below the applicable fugitive emissions definition.Standing and breathing losses means VOC emissions from fixed-roof storage vessels as a result of evaporative losses during storage.Storage vessel means a tank or other vessel that contains an accumulation of crude oil, condensate, intermediate hydrocarbon liquids, or produced water, and that is constructed primarily of non-earthen materials (such as wood, concrete, steel, fiberglass, or plastic), which provide structural support. A well completion vessel that receives recovered liquids from a well after startup of production following flowback for a period which exceeds 60 days is considered a storage vessel under this subpart. A tank or other vessel will not be considered a storage vessel if it has been removed from service in accordance with the requirements of § 49.4173(a)(3), until that tank or other vessel has been returned to service. For the purposes of this subpart, the following are not considered storage vessels:
Citations to §49.4178(d)(1)(iii)
-
(iii) All Indian allotments, the Indian titles to which have not been extinguished, including rights-of-way running through the same.Intermediate hydrocarbon liquids means any naturally occurring, unrefined petroleum liquid.Malfunction alarm and remote notification system means a system connected to an electronically controlled automatic ignition device that sends an alarm through a remote notification system to an owner or operator's central control center, if an attempt to relight the pilot flame is unsuccessful.Pneumatic controller means a natural gas-driven pneumatic controller as defined at 40 CFR 60.5430 and 60.5430a.Pneumatic pump means a natural gas-driven diaphragm pump as defined at 40 CFR 60.5430a.Pneumatic pump emissions means the VOC-containing emissions from pneumatic pumps.Produced natural gas means natural gas that is separated from extracted reservoir fluids during oil and natural gas production operations.Produced water means water that is extracted from the earth from an oil or natural gas production well, or that is separated from crude oil, condensate, or natural gas after extraction.Regional Administrator means the Regional Administrator of EPA Region 8 or an authorized representative of the Regional Administrator of EPA Region 8, except to the extent otherwise specifically specified in a Delegation of Authority Agreement between the Regional Administrator and the Ute Indian Tribe.Repaired means, for the purposes of fugitive emissions components, that fugitive emissions components are adjusted, replaced, or otherwise altered in order to eliminate fugitive emissions as defined in § 49.4178(d)(1)(iii), and subsequently monitored as specified in § 49.4178(d)(1)(ii), and that it is verified that emissions from the fugitive emissions components are below the applicable fugitive emissions definition.Standing and breathing losses means VOC emissions from fixed-roof storage vessels as a result of evaporative losses during storage.Storage vessel means a tank or other vessel that contains an accumulation of crude oil, condensate, intermediate hydrocarbon liquids, or produced water, and that is constructed primarily of non-earthen materials (such as wood, concrete, steel, fiberglass, or plastic), which provide structural support. A well completion vessel that receives recovered liquids from a well after startup of production following flowback for a period which exceeds 60 days is considered a storage vessel under this subpart. A tank or other vessel will not be considered a storage vessel if it has been removed from service in accordance with the requirements of § 49.4173(a)(3), until that tank or other vessel has been returned to service. For the purposes of this subpart, the following are not considered storage vessels:
Citations to §49.4178(d)(2)
-
(vii) The identification of each component exempt under § 49.4178(d)(2), including the type of component and a description of the qualifying exemption; and
Citations to §49.4178(d)(c)(1)(v)(B)(1)
-
(B) Timeframes for inspecting and repairing leaking components that are difficult-to-monitor, unsafe-to-monitor, or require source shutdown, to be no later than the next required monitoring event, as noted in paragraphs (c)(1)(v)(B)(1) through (3) of this section:(1) If using Method 21, fugitive emissions components that cannot be monitored without elevating the monitoring personnel more than 2 meters above the surface may be designated as difficult-to-monitor and must meet the specifications in paragraphs (c)(1)(v)(B)(1)(i) through (iv) of this section:(i) For all fugitive emissions components designated difficult-to-monitor, a written plan must be developed and incorporated into the fugitive emissions monitoring plan.(ii) The plan must include the identification and location of each fugitive emissions component designated difficult-to-monitor.(iii) The plan must include an explanation of why each fugitive emissions component designated as difficult-to-monitor is difficult-to-monitor.(iv) The plan must include a schedule for monitoring the difficult-to-monitor fugitive emissions components at least once per calendar year and a schedule for repairing such fugitive emissions components according to paragraph (c)(1)(v)(B)(3) of this section;(2) Fugitive emissions components that cannot be monitored because monitoring personnel would be exposed to an immediate danger while conducting a monitoring survey may be designated as unsafe-to-monitor and must meet the specification in paragraphs (c)(1)(v)(B)(2)(i) through (iv) of this section:(i) A written plan must be developed for all of the fugitive emissions components designated unsafe-to-monitor and incorporated into the fugitive emissions monitoring plan;(ii) The plan must include the identification and location of each fugitive emissions component designated unsafe-to-monitor.(iii) The plan must include an explanation of why each fugitive emissions component designated as unsafe-to-monitor is unsafe-to-monitor.(iv) The plan must include a schedule for monitoring the unsafe-to-monitor fugitive emissions components as frequently as practicable during safe to inspect times and for repairing such fugitive emissions components according to paragraph (c)(1)(v)(B)(3) of this section;(3) If the repair or replacement of a fugitive emissions component designated difficult-to-monitor or unsafe-to-monitor is technically infeasible; would require a vent blowdown, a compressor station shutdown, a well shutdown, or well shut-in; or would be unsafe to repair during operation of the unit, the repair or replacement must be completed during the next scheduled compressor station shutdown, well shutdown, or well shut-in; after a planned vent blowdown; or within 2 years, whichever is earlier; and
Citations to §49.4178(d)(c)(1)(v)(B)(1)(i)
-
(B) Timeframes for inspecting and repairing leaking components that are difficult-to-monitor, unsafe-to-monitor, or require source shutdown, to be no later than the next required monitoring event, as noted in paragraphs (c)(1)(v)(B)(1) through (3) of this section:(1) If using Method 21, fugitive emissions components that cannot be monitored without elevating the monitoring personnel more than 2 meters above the surface may be designated as difficult-to-monitor and must meet the specifications in paragraphs (c)(1)(v)(B)(1)(i) through (iv) of this section:(i) For all fugitive emissions components designated difficult-to-monitor, a written plan must be developed and incorporated into the fugitive emissions monitoring plan.(ii) The plan must include the identification and location of each fugitive emissions component designated difficult-to-monitor.(iii) The plan must include an explanation of why each fugitive emissions component designated as difficult-to-monitor is difficult-to-monitor.(iv) The plan must include a schedule for monitoring the difficult-to-monitor fugitive emissions components at least once per calendar year and a schedule for repairing such fugitive emissions components according to paragraph (c)(1)(v)(B)(3) of this section;(2) Fugitive emissions components that cannot be monitored because monitoring personnel would be exposed to an immediate danger while conducting a monitoring survey may be designated as unsafe-to-monitor and must meet the specification in paragraphs (c)(1)(v)(B)(2)(i) through (iv) of this section:(i) A written plan must be developed for all of the fugitive emissions components designated unsafe-to-monitor and incorporated into the fugitive emissions monitoring plan;(ii) The plan must include the identification and location of each fugitive emissions component designated unsafe-to-monitor.(iii) The plan must include an explanation of why each fugitive emissions component designated as unsafe-to-monitor is unsafe-to-monitor.(iv) The plan must include a schedule for monitoring the unsafe-to-monitor fugitive emissions components as frequently as practicable during safe to inspect times and for repairing such fugitive emissions components according to paragraph (c)(1)(v)(B)(3) of this section;(3) If the repair or replacement of a fugitive emissions component designated difficult-to-monitor or unsafe-to-monitor is technically infeasible; would require a vent blowdown, a compressor station shutdown, a well shutdown, or well shut-in; or would be unsafe to repair during operation of the unit, the repair or replacement must be completed during the next scheduled compressor station shutdown, well shutdown, or well shut-in; after a planned vent blowdown; or within 2 years, whichever is earlier; and
Citations to §49.4178(d)(c)(1)(v)(B)(2)(i)
-
(B) Timeframes for inspecting and repairing leaking components that are difficult-to-monitor, unsafe-to-monitor, or require source shutdown, to be no later than the next required monitoring event, as noted in paragraphs (c)(1)(v)(B)(1) through (3) of this section:(1) If using Method 21, fugitive emissions components that cannot be monitored without elevating the monitoring personnel more than 2 meters above the surface may be designated as difficult-to-monitor and must meet the specifications in paragraphs (c)(1)(v)(B)(1)(i) through (iv) of this section:(i) For all fugitive emissions components designated difficult-to-monitor, a written plan must be developed and incorporated into the fugitive emissions monitoring plan.(ii) The plan must include the identification and location of each fugitive emissions component designated difficult-to-monitor.(iii) The plan must include an explanation of why each fugitive emissions component designated as difficult-to-monitor is difficult-to-monitor.(iv) The plan must include a schedule for monitoring the difficult-to-monitor fugitive emissions components at least once per calendar year and a schedule for repairing such fugitive emissions components according to paragraph (c)(1)(v)(B)(3) of this section;(2) Fugitive emissions components that cannot be monitored because monitoring personnel would be exposed to an immediate danger while conducting a monitoring survey may be designated as unsafe-to-monitor and must meet the specification in paragraphs (c)(1)(v)(B)(2)(i) through (iv) of this section:(i) A written plan must be developed for all of the fugitive emissions components designated unsafe-to-monitor and incorporated into the fugitive emissions monitoring plan;(ii) The plan must include the identification and location of each fugitive emissions component designated unsafe-to-monitor.(iii) The plan must include an explanation of why each fugitive emissions component designated as unsafe-to-monitor is unsafe-to-monitor.(iv) The plan must include a schedule for monitoring the unsafe-to-monitor fugitive emissions components as frequently as practicable during safe to inspect times and for repairing such fugitive emissions components according to paragraph (c)(1)(v)(B)(3) of this section;(3) If the repair or replacement of a fugitive emissions component designated difficult-to-monitor or unsafe-to-monitor is technically infeasible; would require a vent blowdown, a compressor station shutdown, a well shutdown, or well shut-in; or would be unsafe to repair during operation of the unit, the repair or replacement must be completed during the next scheduled compressor station shutdown, well shutdown, or well shut-in; after a planned vent blowdown; or within 2 years, whichever is earlier; and
Citations to §49.4178(d)(c)(3)
-
(B) Timeframes for inspecting and repairing leaking components that are difficult-to-monitor, unsafe-to-monitor, or require source shutdown, to be no later than the next required monitoring event, as noted in paragraphs (c)(1)(v)(B)(1) through (3) of this section:(1) If using Method 21, fugitive emissions components that cannot be monitored without elevating the monitoring personnel more than 2 meters above the surface may be designated as difficult-to-monitor and must meet the specifications in paragraphs (c)(1)(v)(B)(1)(i) through (iv) of this section:(i) For all fugitive emissions components designated difficult-to-monitor, a written plan must be developed and incorporated into the fugitive emissions monitoring plan.(ii) The plan must include the identification and location of each fugitive emissions component designated difficult-to-monitor.(iii) The plan must include an explanation of why each fugitive emissions component designated as difficult-to-monitor is difficult-to-monitor.(iv) The plan must include a schedule for monitoring the difficult-to-monitor fugitive emissions components at least once per calendar year and a schedule for repairing such fugitive emissions components according to paragraph (c)(1)(v)(B)(3) of this section;(2) Fugitive emissions components that cannot be monitored because monitoring personnel would be exposed to an immediate danger while conducting a monitoring survey may be designated as unsafe-to-monitor and must meet the specification in paragraphs (c)(1)(v)(B)(2)(i) through (iv) of this section:(i) A written plan must be developed for all of the fugitive emissions components designated unsafe-to-monitor and incorporated into the fugitive emissions monitoring plan;(ii) The plan must include the identification and location of each fugitive emissions component designated unsafe-to-monitor.(iii) The plan must include an explanation of why each fugitive emissions component designated as unsafe-to-monitor is unsafe-to-monitor.(iv) The plan must include a schedule for monitoring the unsafe-to-monitor fugitive emissions components as frequently as practicable during safe to inspect times and for repairing such fugitive emissions components according to paragraph (c)(1)(v)(B)(3) of this section;(3) If the repair or replacement of a fugitive emissions component designated difficult-to-monitor or unsafe-to-monitor is technically infeasible; would require a vent blowdown, a compressor station shutdown, a well shutdown, or well shut-in; or would be unsafe to repair during operation of the unit, the repair or replacement must be completed during the next scheduled compressor station shutdown, well shutdown, or well shut-in; after a planned vent blowdown; or within 2 years, whichever is earlier; and
Citations to §49.4178(d)(iv)
-
(B) Timeframes for inspecting and repairing leaking components that are difficult-to-monitor, unsafe-to-monitor, or require source shutdown, to be no later than the next required monitoring event, as noted in paragraphs (c)(1)(v)(B)(1) through (3) of this section:(1) If using Method 21, fugitive emissions components that cannot be monitored without elevating the monitoring personnel more than 2 meters above the surface may be designated as difficult-to-monitor and must meet the specifications in paragraphs (c)(1)(v)(B)(1)(i) through (iv) of this section:(i) For all fugitive emissions components designated difficult-to-monitor, a written plan must be developed and incorporated into the fugitive emissions monitoring plan.(ii) The plan must include the identification and location of each fugitive emissions component designated difficult-to-monitor.(iii) The plan must include an explanation of why each fugitive emissions component designated as difficult-to-monitor is difficult-to-monitor.(iv) The plan must include a schedule for monitoring the difficult-to-monitor fugitive emissions components at least once per calendar year and a schedule for repairing such fugitive emissions components according to paragraph (c)(1)(v)(B)(3) of this section;(2) Fugitive emissions components that cannot be monitored because monitoring personnel would be exposed to an immediate danger while conducting a monitoring survey may be designated as unsafe-to-monitor and must meet the specification in paragraphs (c)(1)(v)(B)(2)(i) through (iv) of this section:(i) A written plan must be developed for all of the fugitive emissions components designated unsafe-to-monitor and incorporated into the fugitive emissions monitoring plan;(ii) The plan must include the identification and location of each fugitive emissions component designated unsafe-to-monitor.(iii) The plan must include an explanation of why each fugitive emissions component designated as unsafe-to-monitor is unsafe-to-monitor.(iv) The plan must include a schedule for monitoring the unsafe-to-monitor fugitive emissions components as frequently as practicable during safe to inspect times and for repairing such fugitive emissions components according to paragraph (c)(1)(v)(B)(3) of this section;(3) If the repair or replacement of a fugitive emissions component designated difficult-to-monitor or unsafe-to-monitor is technically infeasible; would require a vent blowdown, a compressor station shutdown, a well shutdown, or well shut-in; or would be unsafe to repair during operation of the unit, the repair or replacement must be completed during the next scheduled compressor station shutdown, well shutdown, or well shut-in; after a planned vent blowdown; or within 2 years, whichever is earlier; and