§49.151. Program overview. — Inbound Citations
40 C.F.R. § 49.151
Statutory Authority
Cited by 18 regulations in release Current.
Citations to 40 C.F.R. § 49.151 as a whole
-
(a) As set forth in this Federal Implementation Plan (FIP), the Federal minor NSR program in Indian country (or “program”) consists of §§ 49.151 through 49.165.
-
(c) If you propose to establish a synthetic minor source or synthetic minor HAP source or to construct a minor modification at your major source, you will have to comply with the requirements of the Federal minor NSR program in Indian country at §§ 49.151 through 49.165 or other EPA-approved minor NSR program, as applicable.
-
(a) As used in §§ 49.4161 through 49.4168, all terms not defined herein shall have the meaning given them in the Act, in subpart A and subpart OOOO of 40 CFR part 60, in the Prevention of Significant Deterioration regulations at 40 CFR 52.21, or in the Federal Minor New Source Review Program in Indian Country at 40 CFR 49.151. The following terms shall have the specific meanings given them.(1) Bakken Pool means Oil produced from the Bakken, Three Forks, and Sanish Formations.(2) Breathing losses means natural gas emissions from fixed roof tanks resulting from evaporative losses during storage.(3) Casinghead natural gas means the associated natural gas that naturally dissolves out of reservoir fluids during well completion operations and recompletion operations due to the pressure relief that occurs as the reservoir fluids travel up the well casinghead.(4) Closed vent system means a system that is not open to the atmosphere and that is composed of hard-piping, ductwork, connections, and, if necessary, flow-inducing devices that transport natural gas from a piece or pieces of equipment to a control device or back to a process.(5) Enclosed combustor means a thermal oxidation system with an enclosed combustion chamber that maintains a limited constant temperature by controlling fuel and combustion air.(6) Existing facility means an oil and natural gas production facility that begins actual construction prior to the effective date of the “Federal Implementation Plan for Oil and Natural Gas Well Production Facilities; Fort Berthold Indian Reservation (Mandan, Hidatsa and Arikara Nation), North Dakota”.(7) Flashing losses means natural gas emissions resulting from the presence of dissolved natural gas in the produced oil and the produced water, both of which are under high pressure, that occurs as the produced oil and produced water is transferred to storage tanks or other vessels that are at atmospheric pressure.(8) Modified facility means a facility which has undergone the addition, completion, or recompletion of one or more oil and natural gas wells, and/or the addition of any associated equipment necessary for production and storage operations at an existing facility.(9) New facility means an oil and natural gas production facility that begins actual construction after the effective date of the “Federal Implementation Plan for Oil and Natural Gas Well Production Facilities; Fort Berthold Indian Reservation (Mandan, Hidatsa and Arikara Nation), North Dakota”.(10) Oil means hydrocarbon liquids.(11) Oil and natural gas production facility means all of the air pollution emitting units and activities located on or integrally connected to one or more oil and natural gas wells that are necessary for production operations and storage operations.(12) Oil and natural gas well means a single well that extracts subsurface reservoir fluids containing a mixture of oil, natural gas, and water.(13) Owner or operator means any person who owns, leases, operates, controls, or supervises an oil and natural gas production facility.(14) Permit to construct or construction permit means a permit issued by the Regional Administrator pursuant to 40 CFR 49.151, 52.10 or 52.21, or a permit issued by a tribe pursuant to a program approved by the Administrator under 40 CFR part 51, subpart I, authorizing the construction or modification of a stationary source.(15) Permit to operate or operating permit means a permit issued by the Regional Administrator pursuant to 40 CFR part 71, or by a tribe pursuant to a program approved by the Administrator under 40 CFR part 51 or 40 CFR part 70, authorizing the operation of a stationary source.(16) Pit flare means an ignition device, installed horizontally or vertically and used in oil and natural gas production operations to combust produced natural gas and natural gas emissions.(17) Produced natural gas means natural gas that is separated from extracted reservoir fluids during production operations.(18) Produced oil means oil that is separated from extracted reservoir fluids during production operations.(19) Produced oil storage tank means a unit that is constructed primarily of non-earthen materials (such as steel, fiberglass, or plastic) which provides structural support and is designed to contain an accumulation of produced oil.(20) Produced water means water that is separated from extracted reservoir fluids during production operations.(21) Produced water storage tank means a unit that is constructed primarily of non-earthen materials (such as steel, fiberglass, or plastic) which provides structural support and is designed to contain an accumulation of produced water.(22) Production operations means the extraction and separation of reservoir fluids from an oil and natural gas well, using separators and heater-treater systems. A separator is a pressurized vessel designed to separate reservoir fluids into their constituent components of oil, natural gas and water. A heater-treater is a unit that heats the reservoir fluid to break oil/water emulsions and to reduce the oil viscosity. The water is then typically removed by using gravity to allow the water to separate from the oil.(23) Regional Administrator means the Regional Administrator of EPA Region 8 or an authorized representative of the Regional Administrator.(24) Standing losses means natural gas emissions from fixed roof tanks as a result of evaporative losses during storage.(25) Storage operations means the transfer of produced oil and produced water to storage tanks, the filling of the storage tanks, the storage of the produced oil and produced water in the storage tanks, and the draining of the produced oil and produced water from the storage tanks.(26) generally refers to industrial control computer systems that monitor and control industrial infrastructure or facility-based processes.(27) Utility flare means thermal oxidation system using an open (without enclosure) flame. An enclosed combustor as defined in §§ 49.4161 through 49.4168 is not considered a flare.(28) Visible Smoke emissions means a pollutant generated by thermal oxidation in a flare or enclosed combustor and occurring immediately downstream of the flame. Visible smoke occurring within, but not downstream of, the flame, is not considered to constitute visible smoke emissions.(29) Well completion means the process that allows for the flowback of oil and natural gas from newly drilled wells to expel drilling and reservoir fluids and tests the reservoir flow characteristics, which may vent produced hydrocarbons to the atmosphere via an open pit or tank.(30) Well completion operation means any oil and natural gas well completion using hydraulic fracturing occurring at an oil and natural gas production facility.(31) Well recompletion operation means any oil and natural gas well completion using hydraulic refracturing occurring at an oil and natural gas production facility.(32) Working losses means natural gas emissions from fixed roof tanks resulting from evaporative losses during filling and emptying operations.
-
(b) As used in §§ 49.4169 through 49.4184, all terms not defined have the meaning given them in the Act, in 40 CFR parts 60 and 63, in the Prevention of Significant Deterioration regulations at 40 CFR 52.21, in the Federal Minor New Source Review Program in Indian Country at § 49.151, or in the Federal Implementation Plan for Managing Air Emissions from True Minor Sources in Indian Country in the Oil and Natural Gas Production and Natural Gas Processing Segments of the Oil and Natural Gas Sector at § 49.102. The following terms are defined here:Bottom filling means the filling of a storage vessel through an inlet at or near the bottom of the storage vessel designed to have the opening covered by the liquid after the pipe normally used to withdraw liquid can no longer withdraw any liquid.Condensate means hydrocarbon liquid separated from produced natural gas that condenses due to changes in temperature, pressure, or both, and that remains liquid at standard conditions.Crude oil means hydrocarbon liquids that are separated from well-extracted reservoir fluids during oil and natural gas production operations, and that are stored or injected to pipelines as a saleable product. Condensate is not considered crude oil.Electronically controlled automatic ignition device means an electronic device which generates sparks across an electrode and reaches into a combustible gas stream traveling up a flare stack or entering an enclosed combustor, at the point of the pilot tip, equipped with a temperature monitor that signals the device to attempt to re-light an extinguished pilot flame.Enclosed combustor means a thermal oxidation system with an enclosed combustion chamber that maintains a limited constant temperature by controlling fuel and combustion air.Flare means a thermal oxidation system using an open (without enclosure) flame that is designed and operated in accordance with the requirements of 40 CFR 60.18(b). An enclosed combustor is not considered a flare. A combustion device is not considered a flare when installed horizontally or vertically within an open pit and used to combust produced natural gas during initial well completion or temporarily during emergencies when enclosed combustors or flares installed at a source are not operational or injection of recovered produced natural gas is unavailable.Flashing losses means natural gas emissions resulting from the presence of dissolved natural gas in the crude oil, condensate, intermediate hydrocarbon liquids or produced water, which are under high pressure that occurs as the liquids are transferred to storage vessels that are at atmospheric pressure.Fugitive emissions component means any component that has the potential to emit fugitive emissions of VOC at an oil and natural gas source, such as valves, connectors, pressure relief devices, open-ended lines, flanges, covers and closed vent systems not subject to § 49.4176, thief hatches or other openings on a controlled storage vessel not subject to § 49.4173, compressors, instruments, and meters. Devices that vent as part of normal operations, such as natural gas-driven pneumatic controllers or natural gas-driven pneumatic pumps, are not fugitive emissions components, insofar as the natural gas discharged from the device's vent is not considered a fugitive emission. Emissions originating from locations other than the device's vent, such as the thief hatch on a controlled storage vessel, would be considered fugitive emissions.Glycol dehydration unit process vent emissions means VOC-containing emissions from the glycol dehydration unit regenerator or still vent and the vent from the dehydration unit flash tank (if present).Indian country is defined at 18 U.S.C. 1151 and means.
-
(vi) Tribal Minor NSR permits issued under 40 CFR 49.151 through 49.161.
Citations to §49.151(c)(1)
-
(4) The geographic scope of applicability of this rule is as specified in § 49.151(c)(1).Indian governing body means the governing body of any Tribe, band or group of Indians subject to the jurisdiction of the United States and recognized by the United States as possessing power of self-government.Minor modification at a major source means a modification at a major source that does not qualify as a major modification under § 49.167 or § 52.21 of this chapter, as applicable.Minor NSR threshold means any of the applicability cutoffs for this program listed in Table 1 of § 49.153.Minor source means, for purposes of this rule, a source, not including the exempt emissions units and activities listed in § 49.153(c), that has the potential to emit regulated NSR pollutants in amounts that are less than the major source thresholds in § 49.167 or § 52.21 of this chapter, as applicable, but equal to or greater than the minor NSR thresholds in § 49.153. The potential to emit includes fugitive emissions, to the extent that they are quantifiable, only if the source belongs to one of the source categories listed in part 51, Appendix S, paragraph II.A.4(iii) or § 52.21(b)(1)(iii) of this chapter, as applicable.Modification means any physical or operational change at a source that would cause an increase in the allowable emissions of a minor source or an increase in the actual emissions (based on the applicable test under the major NSR program) of a major source for any regulated NSR pollutant or that would cause the emission of any regulated NSR pollutant not previously emitted. Allowable emissions of a minor source include fugitive emissions, to the extent that they are quantifiable, only if the source belongs to one of the source categories listed in part 51, Appendix S, paragraph II.A.4(iii) or § 52.21(b)(1)(iii) of this chapter, as applicable. The following exemptions apply:
Citations to §49.151(c)(1)(i)
-
(1) The provisions of this program apply in all Indian reservation lands where no EPA-approved program is in place and all other areas of Indian country where no EPA-approved program is in place and over which an Indian tribe, or the EPA, has demonstrated that a tribe has jurisdiction, according to the implementation schedule in paragraphs (c)(1)(i) through (iii) of this section:(A) If you wish to begin construction of a minor modification at an existing major source on or after August 30, 2011, you must obtain a permit pursuant to §§ 49.154 and 49.155 (or a general permit pursuant to § 49.156, if applicable) prior to beginning construction.(B) If you wish to obtain a synthetic minor source permit pursuant § 49.158 to establish a synthetic minor source and/or a synthetic minor HAP source at your existing major source, you may submit a synthetic minor source permit application on or after August 30, 2011. However, if your permit application for a synthetic minor source and/or synthetic minor HAP source pursuant to the FIPs for reservations in Idaho, Oregon and Washington has been determined complete prior to August 30, 2011, you do not need to apply for a synthetic minor source permit under this program.(A) If you wish to begin construction of a new synthetic minor source and/or a new synthetic minor HAP source or a modification at an existing synthetic minor source and/or synthetic minor HAP source on or after August 30, 2011, you must obtain a permit pursuant to § 49.158 prior to beginning construction.(B) If your existing synthetic minor source and/or synthetic minor HAP source was established pursuant to the FIPs applicable to the Indian reservations in Idaho, Oregon and Washington or was established under an EPA-approved rule or permit program limiting potential to emit, you do not need to take any action under this program unless you propose a modification for this existing synthetic minor source and/or synthetic minor HAP source, on or after August 30, 2011. For these modifications, you need to obtain a permit pursuant to § 49.158 prior to beginning construction.(C) If your existing synthetic minor source and/or synthetic minor HAP source was established under a permit with enforceable emissions limitations issued pursuant to part 71 of this chapter, the reviewing authority has the discretion to require you to submit a permit application for a synthetic minor source permit under this program by September 4, 2012 and pursuant to § 49.158, to require you to submit a permit application for a synthetic minor source permit under this program (pursuant to § 49.158) at the same time that you apply to renew your part 71 permit or to allow you to continue to maintain synthetic minor status through your part 71 permit. If the reviewing authority requires you to obtain a synthetic minor source permit and/or synthetic minor HAP source permit under this program (pursuant to § 49.158) it also has the discretion to require any additional requirements, including control technology requirements, based on the specific circumstances of the source.(D) If your existing synthetic minor source and/or synthetic minor HAP source was established through a mechanism other than those described in paragraphs (c)(1)(ii)(B) and (C) of this section, you must submit an application pursuant to § 49.158 for a synthetic minor source permit under this program by September 4, 2012. The reviewing authority has the discretion to require any additional requirements, including control technology requirements, based on the specific circumstances of the source.(A) If you own or operate an existing true minor source in Indian country (as defined in § 49.152(d)), you must register your source with the Reviewing Authority in your area by March 1, 2013. If your true minor source is not engaged in an oil and natural gas activity and you commence construction after August 30, 2011, and before September 2, 2014, you must also register your source with the Reviewing Authority in your area within 90 days after the source begins operation. If your true minor source is engaged in an oil and natural gas activity and you commence construction after August 30, 2011, and before October 3, 2016, you must register your source with the Reviewing Authority in your area within 90 days after the source begins operation. You are exempt from these registration requirements if your true minor source is subject to § 49.138.(B) If your true minor source is not engaged in an oil and natural gas activity and you wish to begin construction of a new true minor source or a minor modification at an existing true minor source on or after September 2, 2014, you must first obtain a permit pursuant to §§ 49.154 and 49.155 (or a general permit/permit by rule pursuant to § 49.156, if applicable). If your true minor source is an oil and natural gas source, as defined in § 49.102, and you wish to begin construction of a new true minor source or a minor modification at an existing true minor source on or after October 3, 2016, you must either comply with the Federal Implementation Plan for sources in the oil and natural gas production and natural gas processing segments of the oil and natural gas sector that are located in Indian country (§§ 49.101 through 49.105) from the day you begin construction or opt out of those requirements pursuant to § 49.101(b)(2) and instead obtain a minor source permit pursuant to §§ 49.154 and 49.155 before beginning construction. Alternatively, you may be required by the EPA, pursuant to § 49.101(b)(3), to obtain a minor source permit pursuant to §§ 49.154 and 49.155 before beginning construction. All proposed new sources or modifications of existing sources are also subject to the registration requirements of § 49.160, except for sources that are subject to § 49.138.
Citations to §49.151(c)(1)(ii)
-
(1) The provisions of this program apply in all Indian reservation lands where no EPA-approved program is in place and all other areas of Indian country where no EPA-approved program is in place and over which an Indian tribe, or the EPA, has demonstrated that a tribe has jurisdiction, according to the implementation schedule in paragraphs (c)(1)(i) through (iii) of this section:(A) If you wish to begin construction of a minor modification at an existing major source on or after August 30, 2011, you must obtain a permit pursuant to §§ 49.154 and 49.155 (or a general permit pursuant to § 49.156, if applicable) prior to beginning construction.(B) If you wish to obtain a synthetic minor source permit pursuant § 49.158 to establish a synthetic minor source and/or a synthetic minor HAP source at your existing major source, you may submit a synthetic minor source permit application on or after August 30, 2011. However, if your permit application for a synthetic minor source and/or synthetic minor HAP source pursuant to the FIPs for reservations in Idaho, Oregon and Washington has been determined complete prior to August 30, 2011, you do not need to apply for a synthetic minor source permit under this program.(A) If you wish to begin construction of a new synthetic minor source and/or a new synthetic minor HAP source or a modification at an existing synthetic minor source and/or synthetic minor HAP source on or after August 30, 2011, you must obtain a permit pursuant to § 49.158 prior to beginning construction.(B) If your existing synthetic minor source and/or synthetic minor HAP source was established pursuant to the FIPs applicable to the Indian reservations in Idaho, Oregon and Washington or was established under an EPA-approved rule or permit program limiting potential to emit, you do not need to take any action under this program unless you propose a modification for this existing synthetic minor source and/or synthetic minor HAP source, on or after August 30, 2011. For these modifications, you need to obtain a permit pursuant to § 49.158 prior to beginning construction.(C) If your existing synthetic minor source and/or synthetic minor HAP source was established under a permit with enforceable emissions limitations issued pursuant to part 71 of this chapter, the reviewing authority has the discretion to require you to submit a permit application for a synthetic minor source permit under this program by September 4, 2012 and pursuant to § 49.158, to require you to submit a permit application for a synthetic minor source permit under this program (pursuant to § 49.158) at the same time that you apply to renew your part 71 permit or to allow you to continue to maintain synthetic minor status through your part 71 permit. If the reviewing authority requires you to obtain a synthetic minor source permit and/or synthetic minor HAP source permit under this program (pursuant to § 49.158) it also has the discretion to require any additional requirements, including control technology requirements, based on the specific circumstances of the source.(D) If your existing synthetic minor source and/or synthetic minor HAP source was established through a mechanism other than those described in paragraphs (c)(1)(ii)(B) and (C) of this section, you must submit an application pursuant to § 49.158 for a synthetic minor source permit under this program by September 4, 2012. The reviewing authority has the discretion to require any additional requirements, including control technology requirements, based on the specific circumstances of the source.(A) If you own or operate an existing true minor source in Indian country (as defined in § 49.152(d)), you must register your source with the Reviewing Authority in your area by March 1, 2013. If your true minor source is not engaged in an oil and natural gas activity and you commence construction after August 30, 2011, and before September 2, 2014, you must also register your source with the Reviewing Authority in your area within 90 days after the source begins operation. If your true minor source is engaged in an oil and natural gas activity and you commence construction after August 30, 2011, and before October 3, 2016, you must register your source with the Reviewing Authority in your area within 90 days after the source begins operation. You are exempt from these registration requirements if your true minor source is subject to § 49.138.(B) If your true minor source is not engaged in an oil and natural gas activity and you wish to begin construction of a new true minor source or a minor modification at an existing true minor source on or after September 2, 2014, you must first obtain a permit pursuant to §§ 49.154 and 49.155 (or a general permit/permit by rule pursuant to § 49.156, if applicable). If your true minor source is an oil and natural gas source, as defined in § 49.102, and you wish to begin construction of a new true minor source or a minor modification at an existing true minor source on or after October 3, 2016, you must either comply with the Federal Implementation Plan for sources in the oil and natural gas production and natural gas processing segments of the oil and natural gas sector that are located in Indian country (§§ 49.101 through 49.105) from the day you begin construction or opt out of those requirements pursuant to § 49.101(b)(2) and instead obtain a minor source permit pursuant to §§ 49.154 and 49.155 before beginning construction. Alternatively, you may be required by the EPA, pursuant to § 49.101(b)(3), to obtain a minor source permit pursuant to §§ 49.154 and 49.155 before beginning construction. All proposed new sources or modifications of existing sources are also subject to the registration requirements of § 49.160, except for sources that are subject to § 49.138.
Citations to §49.151(c)(1)(iii)
-
(1) The provisions of this program apply in all Indian reservation lands where no EPA-approved program is in place and all other areas of Indian country where no EPA-approved program is in place and over which an Indian tribe, or the EPA, has demonstrated that a tribe has jurisdiction, according to the implementation schedule in paragraphs (c)(1)(i) through (iii) of this section:(A) If you wish to begin construction of a minor modification at an existing major source on or after August 30, 2011, you must obtain a permit pursuant to §§ 49.154 and 49.155 (or a general permit pursuant to § 49.156, if applicable) prior to beginning construction.(B) If you wish to obtain a synthetic minor source permit pursuant § 49.158 to establish a synthetic minor source and/or a synthetic minor HAP source at your existing major source, you may submit a synthetic minor source permit application on or after August 30, 2011. However, if your permit application for a synthetic minor source and/or synthetic minor HAP source pursuant to the FIPs for reservations in Idaho, Oregon and Washington has been determined complete prior to August 30, 2011, you do not need to apply for a synthetic minor source permit under this program.(A) If you wish to begin construction of a new synthetic minor source and/or a new synthetic minor HAP source or a modification at an existing synthetic minor source and/or synthetic minor HAP source on or after August 30, 2011, you must obtain a permit pursuant to § 49.158 prior to beginning construction.(B) If your existing synthetic minor source and/or synthetic minor HAP source was established pursuant to the FIPs applicable to the Indian reservations in Idaho, Oregon and Washington or was established under an EPA-approved rule or permit program limiting potential to emit, you do not need to take any action under this program unless you propose a modification for this existing synthetic minor source and/or synthetic minor HAP source, on or after August 30, 2011. For these modifications, you need to obtain a permit pursuant to § 49.158 prior to beginning construction.(C) If your existing synthetic minor source and/or synthetic minor HAP source was established under a permit with enforceable emissions limitations issued pursuant to part 71 of this chapter, the reviewing authority has the discretion to require you to submit a permit application for a synthetic minor source permit under this program by September 4, 2012 and pursuant to § 49.158, to require you to submit a permit application for a synthetic minor source permit under this program (pursuant to § 49.158) at the same time that you apply to renew your part 71 permit or to allow you to continue to maintain synthetic minor status through your part 71 permit. If the reviewing authority requires you to obtain a synthetic minor source permit and/or synthetic minor HAP source permit under this program (pursuant to § 49.158) it also has the discretion to require any additional requirements, including control technology requirements, based on the specific circumstances of the source.(D) If your existing synthetic minor source and/or synthetic minor HAP source was established through a mechanism other than those described in paragraphs (c)(1)(ii)(B) and (C) of this section, you must submit an application pursuant to § 49.158 for a synthetic minor source permit under this program by September 4, 2012. The reviewing authority has the discretion to require any additional requirements, including control technology requirements, based on the specific circumstances of the source.(A) If you own or operate an existing true minor source in Indian country (as defined in § 49.152(d)), you must register your source with the Reviewing Authority in your area by March 1, 2013. If your true minor source is not engaged in an oil and natural gas activity and you commence construction after August 30, 2011, and before September 2, 2014, you must also register your source with the Reviewing Authority in your area within 90 days after the source begins operation. If your true minor source is engaged in an oil and natural gas activity and you commence construction after August 30, 2011, and before October 3, 2016, you must register your source with the Reviewing Authority in your area within 90 days after the source begins operation. You are exempt from these registration requirements if your true minor source is subject to § 49.138.(B) If your true minor source is not engaged in an oil and natural gas activity and you wish to begin construction of a new true minor source or a minor modification at an existing true minor source on or after September 2, 2014, you must first obtain a permit pursuant to §§ 49.154 and 49.155 (or a general permit/permit by rule pursuant to § 49.156, if applicable). If your true minor source is an oil and natural gas source, as defined in § 49.102, and you wish to begin construction of a new true minor source or a minor modification at an existing true minor source on or after October 3, 2016, you must either comply with the Federal Implementation Plan for sources in the oil and natural gas production and natural gas processing segments of the oil and natural gas sector that are located in Indian country (§§ 49.101 through 49.105) from the day you begin construction or opt out of those requirements pursuant to § 49.101(b)(2) and instead obtain a minor source permit pursuant to §§ 49.154 and 49.155 before beginning construction. Alternatively, you may be required by the EPA, pursuant to § 49.101(b)(3), to obtain a minor source permit pursuant to §§ 49.154 and 49.155 before beginning construction. All proposed new sources or modifications of existing sources are also subject to the registration requirements of § 49.160, except for sources that are subject to § 49.138.
Citations to §49.151(c)(1)(iii)(B)
-
(a) An owner/operator subject to the requirements contained in §§ 49.101 through 49.105 to satisfy its obligation under § 49.151(c)(1)(iii)(B) to obtain a minor NSR permit shall meet either paragraph (a)(1) or (2) of this section, as appropriate.(1) The owner/operator shall submit to the EPA Regional Office (and to the relevant tribe for the area where the source is located/locating) valid documentation demonstrating that prior Endangered Species Act (ESA) and/or National Historic Preservation Act (NHPA) compliance has been completed by another federal agency in connection with the specific oil and natural gas activity operated under this FIP (we would consider a document no longer valid if the issuing agency has reopened consultation for the prior approval). The appropriate documents shall clearly show that the other federal agency had met its obligations under both the ESA and NHPA. A simple reference to a Record of Decision or other final decision document will not be acceptable. For listed species, acceptable documentation can include a copy of a letter or biological opinion from the U.S. Fish and Wildlife Service addressing the effects of the project on listed species and critical habitat and demonstrating compliance by the federal action agency with ESA requirements. Where the federal action agency prepares a biological assessment of the action as part of its ESA compliance, that document shall also be provided to the EPA Regional Office. For historic properties, acceptable documentation can include: a letter from the appropriate historic preservation office, or a memorandum of agreement with that office, addressing the effects of the project on historic properties and demonstrating compliance by the federal action agency with NHPA requirements. All documentation shall be attached to the Part 1 Registration Form submitted in accordance with § 49.160(c)(1)(iv).(2) The owner/operator shall submit to the EPA Regional Office (and to the relevant tribe for the area where the source is located/locating) documentation demonstrating that it has completed the required screening procedures specified for consideration of threatened or endangered species and historic properties and receive written confirmation from the EPA stating that the owner/operator has satisfactorily completed these procedures. The completed screening procedures documentation may be submitted together with the source's required § 49.160(c)(1)(iv) Part 1 Registration Form. (The procedures are contained in the following document: “Procedures to Address Threatened and Endangered Species and Historic Properties for the Federal Implementation Plan for Managing Air Emissions from True Minor Sources in Indian Country in the Oil and Natural Gas Production and Natural Gas Processing Segments of the Oil and Natural Gas Sector,” https://www.epa.gov/tribal-air/tribal-minor-new-source-review). Review of your submittal will be conducted by the EPA Regional Office in accordance with the procedure in paragraphs (a)(2)(i) and (ii) of this section:(i) Within 30 days of receipt of your documentation, by written notification to you, the EPA Regional Office must provide one of the following determinations:(A) The documentation satisfactorily demonstrates completion of the screening procedures; or(B) If the initial submittal is deficient, the EPA Regional Office will note any such deficiencies and may offer further direction on completing the screening procedures. Once you have addressed the noted deficiencies, you must resubmit your revised screening procedure documentation for review. An additional 15-day review notification period will be used for the EPA Regional Office to determine whether the listed species and/or historic property screening procedures have been satisfied. If the EPA Regional Office makes such a determination, it will send you written notification stating that conclusion.(ii) You must obtain written notification from the EPA Regional Office indicating that the source has adequately completed the screening procedures. The EPA Regional Office may send written notification by mail, email, or any other written means of notification. You may not begin construction under this FIP until the following two conditions are met:(A) At least 30 days has passed from the date the Part 1 Registration Form was submitted; and
Citations to §49.151(e)(1)
-
(e) For the reviewing authority to issue a final permit decision under this program (other than a general permit under § 49.156 or a synthetic minor source permit under § 49.158), all the actions listed in paragraphs (e)(1) through (8) of this section need to be completed. The processes for issuing general permits and synthetic minor source permits are set out in § 49.156 and § 49.158, respectively.(1) You must submit a permit application that meets the requirements of § 49.154(a).(2) The reviewing authority determines completeness of the permit application as provided in § 49.154(b) within 45 days of receiving the application (60 days for minor modifications at major sources).(3) The reviewing authority determines the appropriate emission limitations and permit conditions for your affected emissions units under § 49.154(c).(4) The reviewing authority may require you to submit an Air Quality Impact Analysis (AQIA) if it has reason to be concerned that the construction of your minor source or modification would cause or contribute to a NAAQS or PSD increment violation.(5) If an AQIA is submitted, the reviewing authority determines that the new or modified source will not cause or contribute to a NAAQS or PSD increment violation.(6) The reviewing authority develops a draft permit that meets the permit content requirements of § 49.155(a).(7) The reviewing authority provides for public participation, including a 30-day period for public comment, according to the requirements of § 49.157.(8) The reviewing authority either issues a final permit that meets the requirements of § 49.155(a) or denies the permit and provides reasons for the denial, within 135 days (or within 1 year for minor modifications at major sources) after the date the application is deemed complete and all additional information necessary to make an informed decision has been provided.
Citations to §49.151(e)(2)
-
(e) For the reviewing authority to issue a final permit decision under this program (other than a general permit under § 49.156 or a synthetic minor source permit under § 49.158), all the actions listed in paragraphs (e)(1) through (8) of this section need to be completed. The processes for issuing general permits and synthetic minor source permits are set out in § 49.156 and § 49.158, respectively.(1) You must submit a permit application that meets the requirements of § 49.154(a).(2) The reviewing authority determines completeness of the permit application as provided in § 49.154(b) within 45 days of receiving the application (60 days for minor modifications at major sources).(3) The reviewing authority determines the appropriate emission limitations and permit conditions for your affected emissions units under § 49.154(c).(4) The reviewing authority may require you to submit an Air Quality Impact Analysis (AQIA) if it has reason to be concerned that the construction of your minor source or modification would cause or contribute to a NAAQS or PSD increment violation.(5) If an AQIA is submitted, the reviewing authority determines that the new or modified source will not cause or contribute to a NAAQS or PSD increment violation.(6) The reviewing authority develops a draft permit that meets the permit content requirements of § 49.155(a).(7) The reviewing authority provides for public participation, including a 30-day period for public comment, according to the requirements of § 49.157.(8) The reviewing authority either issues a final permit that meets the requirements of § 49.155(a) or denies the permit and provides reasons for the denial, within 135 days (or within 1 year for minor modifications at major sources) after the date the application is deemed complete and all additional information necessary to make an informed decision has been provided.
Citations to §49.151(e)(3)
-
(e) For the reviewing authority to issue a final permit decision under this program (other than a general permit under § 49.156 or a synthetic minor source permit under § 49.158), all the actions listed in paragraphs (e)(1) through (8) of this section need to be completed. The processes for issuing general permits and synthetic minor source permits are set out in § 49.156 and § 49.158, respectively.(1) You must submit a permit application that meets the requirements of § 49.154(a).(2) The reviewing authority determines completeness of the permit application as provided in § 49.154(b) within 45 days of receiving the application (60 days for minor modifications at major sources).(3) The reviewing authority determines the appropriate emission limitations and permit conditions for your affected emissions units under § 49.154(c).(4) The reviewing authority may require you to submit an Air Quality Impact Analysis (AQIA) if it has reason to be concerned that the construction of your minor source or modification would cause or contribute to a NAAQS or PSD increment violation.(5) If an AQIA is submitted, the reviewing authority determines that the new or modified source will not cause or contribute to a NAAQS or PSD increment violation.(6) The reviewing authority develops a draft permit that meets the permit content requirements of § 49.155(a).(7) The reviewing authority provides for public participation, including a 30-day period for public comment, according to the requirements of § 49.157.(8) The reviewing authority either issues a final permit that meets the requirements of § 49.155(a) or denies the permit and provides reasons for the denial, within 135 days (or within 1 year for minor modifications at major sources) after the date the application is deemed complete and all additional information necessary to make an informed decision has been provided.
Citations to §49.151(e)(4)
-
(e) For the reviewing authority to issue a final permit decision under this program (other than a general permit under § 49.156 or a synthetic minor source permit under § 49.158), all the actions listed in paragraphs (e)(1) through (8) of this section need to be completed. The processes for issuing general permits and synthetic minor source permits are set out in § 49.156 and § 49.158, respectively.(1) You must submit a permit application that meets the requirements of § 49.154(a).(2) The reviewing authority determines completeness of the permit application as provided in § 49.154(b) within 45 days of receiving the application (60 days for minor modifications at major sources).(3) The reviewing authority determines the appropriate emission limitations and permit conditions for your affected emissions units under § 49.154(c).(4) The reviewing authority may require you to submit an Air Quality Impact Analysis (AQIA) if it has reason to be concerned that the construction of your minor source or modification would cause or contribute to a NAAQS or PSD increment violation.(5) If an AQIA is submitted, the reviewing authority determines that the new or modified source will not cause or contribute to a NAAQS or PSD increment violation.(6) The reviewing authority develops a draft permit that meets the permit content requirements of § 49.155(a).(7) The reviewing authority provides for public participation, including a 30-day period for public comment, according to the requirements of § 49.157.(8) The reviewing authority either issues a final permit that meets the requirements of § 49.155(a) or denies the permit and provides reasons for the denial, within 135 days (or within 1 year for minor modifications at major sources) after the date the application is deemed complete and all additional information necessary to make an informed decision has been provided.
Citations to §49.151(e)(5)
-
(e) For the reviewing authority to issue a final permit decision under this program (other than a general permit under § 49.156 or a synthetic minor source permit under § 49.158), all the actions listed in paragraphs (e)(1) through (8) of this section need to be completed. The processes for issuing general permits and synthetic minor source permits are set out in § 49.156 and § 49.158, respectively.(1) You must submit a permit application that meets the requirements of § 49.154(a).(2) The reviewing authority determines completeness of the permit application as provided in § 49.154(b) within 45 days of receiving the application (60 days for minor modifications at major sources).(3) The reviewing authority determines the appropriate emission limitations and permit conditions for your affected emissions units under § 49.154(c).(4) The reviewing authority may require you to submit an Air Quality Impact Analysis (AQIA) if it has reason to be concerned that the construction of your minor source or modification would cause or contribute to a NAAQS or PSD increment violation.(5) If an AQIA is submitted, the reviewing authority determines that the new or modified source will not cause or contribute to a NAAQS or PSD increment violation.(6) The reviewing authority develops a draft permit that meets the permit content requirements of § 49.155(a).(7) The reviewing authority provides for public participation, including a 30-day period for public comment, according to the requirements of § 49.157.(8) The reviewing authority either issues a final permit that meets the requirements of § 49.155(a) or denies the permit and provides reasons for the denial, within 135 days (or within 1 year for minor modifications at major sources) after the date the application is deemed complete and all additional information necessary to make an informed decision has been provided.
Citations to §49.151(e)(6)
-
(e) For the reviewing authority to issue a final permit decision under this program (other than a general permit under § 49.156 or a synthetic minor source permit under § 49.158), all the actions listed in paragraphs (e)(1) through (8) of this section need to be completed. The processes for issuing general permits and synthetic minor source permits are set out in § 49.156 and § 49.158, respectively.(1) You must submit a permit application that meets the requirements of § 49.154(a).(2) The reviewing authority determines completeness of the permit application as provided in § 49.154(b) within 45 days of receiving the application (60 days for minor modifications at major sources).(3) The reviewing authority determines the appropriate emission limitations and permit conditions for your affected emissions units under § 49.154(c).(4) The reviewing authority may require you to submit an Air Quality Impact Analysis (AQIA) if it has reason to be concerned that the construction of your minor source or modification would cause or contribute to a NAAQS or PSD increment violation.(5) If an AQIA is submitted, the reviewing authority determines that the new or modified source will not cause or contribute to a NAAQS or PSD increment violation.(6) The reviewing authority develops a draft permit that meets the permit content requirements of § 49.155(a).(7) The reviewing authority provides for public participation, including a 30-day period for public comment, according to the requirements of § 49.157.(8) The reviewing authority either issues a final permit that meets the requirements of § 49.155(a) or denies the permit and provides reasons for the denial, within 135 days (or within 1 year for minor modifications at major sources) after the date the application is deemed complete and all additional information necessary to make an informed decision has been provided.
Citations to §49.151(e)(7)
-
(e) For the reviewing authority to issue a final permit decision under this program (other than a general permit under § 49.156 or a synthetic minor source permit under § 49.158), all the actions listed in paragraphs (e)(1) through (8) of this section need to be completed. The processes for issuing general permits and synthetic minor source permits are set out in § 49.156 and § 49.158, respectively.(1) You must submit a permit application that meets the requirements of § 49.154(a).(2) The reviewing authority determines completeness of the permit application as provided in § 49.154(b) within 45 days of receiving the application (60 days for minor modifications at major sources).(3) The reviewing authority determines the appropriate emission limitations and permit conditions for your affected emissions units under § 49.154(c).(4) The reviewing authority may require you to submit an Air Quality Impact Analysis (AQIA) if it has reason to be concerned that the construction of your minor source or modification would cause or contribute to a NAAQS or PSD increment violation.(5) If an AQIA is submitted, the reviewing authority determines that the new or modified source will not cause or contribute to a NAAQS or PSD increment violation.(6) The reviewing authority develops a draft permit that meets the permit content requirements of § 49.155(a).(7) The reviewing authority provides for public participation, including a 30-day period for public comment, according to the requirements of § 49.157.(8) The reviewing authority either issues a final permit that meets the requirements of § 49.155(a) or denies the permit and provides reasons for the denial, within 135 days (or within 1 year for minor modifications at major sources) after the date the application is deemed complete and all additional information necessary to make an informed decision has been provided.
Citations to §49.151(e)(8)
-
(e) For the reviewing authority to issue a final permit decision under this program (other than a general permit under § 49.156 or a synthetic minor source permit under § 49.158), all the actions listed in paragraphs (e)(1) through (8) of this section need to be completed. The processes for issuing general permits and synthetic minor source permits are set out in § 49.156 and § 49.158, respectively.(1) You must submit a permit application that meets the requirements of § 49.154(a).(2) The reviewing authority determines completeness of the permit application as provided in § 49.154(b) within 45 days of receiving the application (60 days for minor modifications at major sources).(3) The reviewing authority determines the appropriate emission limitations and permit conditions for your affected emissions units under § 49.154(c).(4) The reviewing authority may require you to submit an Air Quality Impact Analysis (AQIA) if it has reason to be concerned that the construction of your minor source or modification would cause or contribute to a NAAQS or PSD increment violation.(5) If an AQIA is submitted, the reviewing authority determines that the new or modified source will not cause or contribute to a NAAQS or PSD increment violation.(6) The reviewing authority develops a draft permit that meets the permit content requirements of § 49.155(a).(7) The reviewing authority provides for public participation, including a 30-day period for public comment, according to the requirements of § 49.157.(8) The reviewing authority either issues a final permit that meets the requirements of § 49.155(a) or denies the permit and provides reasons for the denial, within 135 days (or within 1 year for minor modifications at major sources) after the date the application is deemed complete and all additional information necessary to make an informed decision has been provided.