40 C.F.R. § 421.265
Except as provided in 40 CFR
403.7 and
403.13, any existing source subject to this subpart which introduces pollutants into a publicly owned treatment works must comply with
40 CFR part 403 and achieve the following pretreatment standards for existing sources. The mass of wastewater pollutants in secondary precious metals process wastewater introduced into a POTW must not exceed the following values:
(a)
Furnace wet air pollution control.
(b)
Raw material granulation.
(c)
Spent plating solutions.
(d)
Spent Cyanide stripping solutions.
(e)
Refinery wet air pollution control. 1
(f)
Gold solvent extraction raffinate and wash water.
(g)
Gold spent electrolyte.
(h)
Gold precipitation and filtration.
(i)
Platinum precipitation and filtration.
(j)
Palladium precipitation and filtration.
(k)
Other platinum group metals precipitation and filtration.
(l)
Spent solution from PGC salt production.
(m)
Equipment and floor wash.
(n)
Preliminary Treatment.
Notes, amendments, and revision history
Amendments
[50 FR 38365, Sept. 20, 1985, as amended at 55 FR 31710, 31711, Aug. 3, 1990]
Source
Source: 50 FR 38365, Sept. 20, 1985, unless otherwise noted.
Authority
Authority: Secs. 301, 304 (b), (c), (e), and (g), 306 (b) and (c), 307 (b) and (c), 308 and 501 of the Clean Water Act (the Federal Water Pollution Control Act Amendments of 1972, as amended by the Clean Water Act of 1977) and the Water Quality Act of 1987 (the “Act”); 33 U.S.C. 1311, 1314 (b), (c), (e), and (g), 1316 (b) and (c), 1317 (b) and (c), 1318 and 1361; 86 Stat. 816, Pub. L. 92-500; 91 Stat. 1567, Pub. L. 95-217; 101 Stat. 7, Pub. L. 100-4.
Source
Source: 49 FR 8790, Mar. 8, 1984, unless otherwise noted.
Amendments
[50 FR 38365, Sept. 20, 1985, as amended at 55 FR 31710, 31711, Aug. 3, 1990]