US Codex
C.F.R.
Browse by date
Notes

§35.2123. Reserve capacity. — Inbound Citations

40 C.F.R. § 35.2123

Cited by 4 regulations in release Current.

Citations to 40 U.S.C. § 35.2123 as a whole

  • (b) In addition to those applicable limitations set forth in §§ 35.2100 through 35.2127 the grant applicant shall:
    (1) Demonstrate that the total cost and environmental impact of building the individual system will be less than the cost of a conventional system;
    (2) Certify that the principal residence or small commercial establishment was constructed before December 27, 1977, and inhabited or in use on or before that date;
    (3) Apply on behalf of a number of individual units to be served in the facilities planning area;
    (4) Certify that public ownership of such works is not feasible and list the reasons; and
    (5) Certify that such treatment works will be properly operated and maintained and will comply with all other requirements of section 204 of the Act.
  • (4) Evidence of compliance with all application limitations on award (§§ 35.2100 through 35.2127); and
  • Grant funding may be awarded for a phase or segment of a treatment works, subject to the limitations of § 35.2123, although that phase or segment does not result in compliance with the enforceable requirements of the Act, provided:
  • (b) Shall be for a new cost-effective collection system in a community in existence on October 18, 1972, which has sufficient existing or planned capacity to adequately treat such collected wastewater and where the bulk (generally two-thirds) of the expected flow (flow from existing plus future residential users) will be from the resident population on October 18, 1972. The expected flow will be subject to the limitations for interceptors contained in § 35.2123. If assistance is awarded, the grantee shall provide assurances that the existing population will connect to the collection system within a reasonable time after project completion.