US Codex
C.F.R.
Browse by date
Notes

§280.40. General requirements for all UST systems.

40 C.F.R. § 280.40

(a)
Owners and operators of UST systems must provide a method, or combination of methods, of release detection that:
(1)
Can detect a release from any portion of the tank and the connected underground piping that routinely contains product;
(2)
Is installed and calibrated in accordance with the manufacturer's instructions;
(3)
Beginning on October 13, 2018, is operated and maintained, and electronic and mechanical components are tested for proper operation, in accordance with one of the following: manufacturer's instructions; a code of practice developed by a nationally recognized association or independent testing laboratory; or requirements determined by the implementing agency to be no less protective of human health and the environment than the two options listed in paragraphs (a)(1) and (2) of this section. A test of the proper operation must be performed at least annually and, at a minimum, as applicable to the facility, cover the following components and criteria:
(i)
Automatic tank gauge and other controllers— test alarm; verify system configuration; test battery backup;
(ii)
Probes and sensors— inspect for residual buildup; ensure floats move freely; ensure shaft is not damaged; ensure cables are free of kinks and breaks; test alarm operability and communication with controller;
(iii)
Automatic line leak detector— test operation to meet criteria in § 280.44(a) by simulating a leak;
(iv)
Vacuum pumps and pressure gauges— ensure proper communication with sensors and controller; and
(v)
Hand-held electronic sampling equipment associated with groundwater and vapor monitoring— ensure proper operation.
(4)
Meets the performance requirements in § 280.43, § 280.44, or subpart K of this part, as applicable, with any performance claims and their manner of determination described in writing by the equipment manufacturer or installer. In addition, the methods listed in § 280.43(b), (c), (d), (h), and (i), § 280.44(a) and (b), and subpart K of this part, must be capable of detecting the leak rate or quantity specified for that method in the corresponding section of the rule with a probability of detection of 0.95 and a probability of false alarm of 0.05.
(b)
When a release detection method operated in accordance with the performance standards in § 280.43, § 280.44, or subpart K of this part indicates a release may have occurred, owners and operators must notify the implementing agency in accordance with subpart E of this part.
(c)
Any UST system that cannot apply a method of release detection that complies with the requirements of this subpart must complete the closure procedures in subpart G of this part. For previously deferred UST systems described in subparts A and K of this part, this requirement applies after the effective dates described in § 280.10(a)(1)(ii) and (iii) and § 280.251(a).
Notes, amendments, and revision history

Authority

Authority: 42 U.S.C. 6912, 6991, 6991(a), 6991(b), 6991(c), 6991(d), 6991(e), 6991(f), 6991(g), 6991(h), 6991(i).

Source

Source: 80 FR 41623, July 15, 2015, unless otherwise noted.