Subpart B — Non-Federal Oil and Gas Rights
- §9.30 What is the purpose and scope of this subpart?
- §9.31 When does this subpart apply to me?
- §9.32 What authorization do I need to conduct operations?
- §9.33 If I am already operating under an NPS authorization, what do I need to do?
- §9.40 What do the terms used in this subpart mean?
- §9.50 Do I need an operations permit for my previously exempt operations?
- §9.51 How do I apply for my operations permit?
- §9.52 What will the NPS do with my application?
- §9.53 May I continue to operate while the NPS reviews my application?
- §9.60 When do I need a temporary access permit?
- §9.61 How do I apply for a temporary access permit?
- §9.62 When will the NPS grant a temporary access permit?
- §9.63 How long will I have to conduct my reconnaissance surveys?
- §9.70 Do I need an operations permit for accessing oil and gas rights from outside the System unit boundary?
- §9.71 What information must I submit to the NPS?
- §9.72 How will the NPS act on my submission?
- §9.73 If I don't need an operations permit, are there still requirements that I must meet?
- §9.80 Who must apply for an operations permit?
- §9.81 May I use previously submitted information?
- §9.82 What must I include in my application?
- §9.83 What information must be included in all applications?
- §9.84 Existing conditions and proposed area of operations.
- §9.85 Environmental conditions and mitigation actions.
- §9.86 Spill control and emergency preparedness plan.
- §9.87 What additional information must be included if I am proposing geophysical exploration?
- §9.88 What additional information must be included if I am proposing drilling operations?
- §9.89 What additional information must be included if I am proposing well stimulation operations, including hydraulic fracturing?
- §9.90 What additional information must be included if I am proposing production operations?
- §9.100 How will NPS process my application?
- §9.101 How will the NPS conduct initial review?
- §9.102 How will the NPS conduct formal review?
- §9.103 What standards must be met to approve my operations permit?
- §9.104 What final actions may the Regional Director take on my operations permit?
- §9.105 What is the approval process for operations in Big Cypress National Preserve?
- §9.110 What are the purposes and functions of NPS operating standards?
- §9.111 What general facility design and management standards must I meet?
- §9.112 What hydrologic standards must I meet?
- §9.113 What safety standards must I meet?
- §9.114 What lighting and visual standards must I meet?
- §9.115 What noise reduction standards must I meet?
- §9.116 What reclamation and protection standards must I meet?
- §9.117 What additional operating standards apply to geophysical operations?
- §9.118 What additional operating standards apply to drilling, stimulation, and production operations?
- §9.120 What terms and conditions apply to all operators?
- §9.121 What monitoring and reporting is required for all operators?
- §9.122 What additional reports must I submit if my operation includes hydraulic fracturing?
- §9.130 May I cross Federal property to reach the boundary of my oil and gas right?
- §9.131 Will the NPS charge me a fee for access?
- §9.132 Will I be charged a fee for emergency access to my operations?
- §9.140 Do I have to provide financial assurance to the NPS?
- §9.141 How does the NPS establish the amount of financial assurance?
- §9.142 Will the NPS adjust my financial assurance?
- §9.143 When will the NPS release my financial assurance?
- §9.144 Under what circumstances will the NPS retain my financial assurance?
- §9.150 How can an approved permit be modified?
- §9.160 What are my responsibilities if I transfer my operations?
- §9.161 What must I do if operations are transferred to me?
- §9.170 When must I plug my well?
- §9.171 Can I get an extension to the well plugging requirement?
- §9.180 What acts are prohibited under this subpart?
- §9.181 What enforcement actions can the NPS take?
- §9.182 How do violations affect my ability to obtain a permit?
- §9.190 Can I, as operator, request reconsideration of NPS decisions?
- §9.191 How does the NPS process my request for reconsideration?
- §9.192 Can I appeal the Regional Director's decision?
- §9.193 Will filing a request for reconsideration or appeal stop the NPS from taking action under this subpart?
- §9.194 What if the original decision was made by the Superintendent?
- §9.200 How can the public participate in the approval process?
- §9.210 Has the Office of Management and Budget approved the information collection requirements?