US Codex
C.F.R.
Browse by date
Notes

§9.53. May I continue to operate while the NPS reviews my application? — Inbound Citations

36 C.F.R. § 9.53

Cited by 2 regulations in release Current.

Citations to 36 C.F.R. § 9.53 as a whole

  • (c) If the previous operator was operating without an operations permit, you will be considered a previously exempt operator and must obtain an operations permit. Within 90 days after acquiring the rights to conduct operations, you must submit the information at § 9.51(a) through (j), and your operations permit application will be processed in accordance with §§ 9.52 and 9.53.
  • (b) If you were operating outside of a System unit and your operation has been included within an existing System unit as a result of a change to the boundary, or included within a newly established System unit, you are subject to §§ 9.50 through 9.53.