Within 90 days after December 5, 2016 or within 90 days after the effective date of a boundary change, or establishment of a new System unit, as applicable, you must submit the following to the Superintendent of the System unit in which you propose to continue to conduct operations:
(a)
The names and contact information of the operator, the owner, and the individuals responsible for overall management, field supervision, and emergency response of the proposed operations;
(b)
Documentation demonstrating that you hold a right, and the extent of such right, to operate within the System unit;
(c)
A brief description of the current operations and any anticipated changes to the current operations;
(d)
The American Petroleum Institute (API) well number or State well-identification permit number;
(e)
Maps to scale that clearly delineate your current area of operations as of December 5, 2016 or the effective date of a boundary change, or establishment of a new System unit, as applicable, and that identify the area of surface disturbance and equipment layout within your proposed area of operations;
(f)
The results of any reconnaissance surveys you have conducted to be used by the Superintendent to identify resource protection measures in your operations permit.
(g)
A spill control and emergency preparedness plan as required by
§ 9.86;
(h)
Documentation of the current operating methods, surface equipment, downhole well construction and completion, materials produced or used, and monitoring methods;
(j)
A description of the procedures to be used and cost estimates for well plugging and surface reclamation.
Notes, amendments, and revision history
Authority
Authority: 16 U.S.C. 230a(a)(4), 459d-3, 460cc-2(i), 460ee(c)(4), 698c(b)(2), 698i(b)(2), and 698m-4; 18 U.S.C. 3571 and 3581; 31 U.S.C. 9701; 54 U.S.C. 100101, 100751, and 103104.
Source
Source: 81 FR 77992, Nov. 4, 2016, unless otherwise noted.