§9.52. What will the NPS do with my application? — Inbound Citations
36 C.F.R. § 9.52
Statutory Authority
Cited by 2 regulations in release Current.
Citations to 36 C.F.R. § 9.52 as a whole
-
(c) If the previous operator was operating without an operations permit, you will be considered a previously exempt operator and must obtain an operations permit. Within 90 days after acquiring the rights to conduct operations, you must submit the information at § 9.51(a) through (j), and your operations permit application will be processed in accordance with §§ 9.52 and 9.53.
-
(b) If you were operating outside of a System unit and your operation has been included within an existing System unit as a result of a change to the boundary, or included within a newly established System unit, you are subject to §§ 9.50 through 9.53.