§333.18. Notices of intent and scoping. — Inbound Citations

33 C.F.R. § 333.18

Cited by 2 regulations in release Current.

Citations to 33 U.S.C. § 333.18 as a whole

  • (p) consists of the range of actions, alternatives, and effects subject to the Corps legal authority or subject to the Corps control and responsibility that should be considered in an environmental document. This part addresses the considerations for use by District Engineers when determining scope for NEPA compliance in § 333.18 of this part.

Citations to §333.18(b)

  • (b) If the scope of analysis for the NEPA document (see § 333.18(b) of this part) covers only the proposed specific activity requiring a Department of the Army permit or 33 U.S.C. 408 permission, then the underlying purpose and need for that specific activity should be stated. (For example, “The purpose and need for the pipe is to obtain cooling water from the river for the electric generating plant.”)