§333.18. Notices of intent and scoping.
33 C.F.R. § 333.18
Similarly, if an applicant seeks a DA permit to fill waters or wetlands or 33 U.S.C. 408 permission to alter a covered project on which other construction or work is proposed, the control, responsibility, and legal authority of the Corps, as well as its overall Federal involvement, would extend to the portions of the project to be located on the permitted fill or within the boundary of the project covered by 33 U.S.C. 408. However, the NEPA review would be extended to the entire project, including portions outside waters of the United States or the project area covered by 33 U.S.C. 408, only if sufficient Federal control, responsibility, and legal authority over the entire project is determined to exist; that is, if the regulated activities, and those activities involving regulation, funding, etc., by other Federal agencies, comprise a substantial portion of the overall project. In any case, once the scope of analysis has been defined, the NEPA analysis for that action should include the effects or impacts from the proposed action or alternatives on all Federal interests within the purview of the NEPA statute. The District Engineer should, whenever practicable, incorporate by reference and rely upon the reviews of other Federal, State, Tribal, and local agencies.
For example, a 50-mile electrical transmission cable crossing a 1 1/4 mile-wide river that is a navigable water of the United States requires a DA permit. Neither the origin nor the destination of the cable, nor its route to and from the navigable water, except as the route applies to the location and configuration of the crossing, are within the control, responsibility, or legal authority of the Corps. Those matters would not be included in the Corps' scope of analysis which, in this case, would address the impacts of the specific cable crossing.
As another example, the same 50-mile electrical transmission cable crossing a Corps civil works project requires a 33 U.S.C. 408 permission. As with the previous example, neither the origin nor the destination of the cable, nor its route to and from the civil works project, except as the route applies to the location and configuration of the crossing within the civil works project, are within the control, responsibility, or legal authority of the Corps. Those matters would not be included in the Corps' scope of analysis which, in this case, would address the impacts of the specific cable crossing on the Corps civil works project.
Conversely, for those activities that require a DA permit or 33 U.S.C. 408 permission for a major portion of a transportation or utility transmission project, such that the Corps permit or 33 U.S.C. 408 permission bears upon the origin and destination as well as the route of the project outside the Corps regulatory boundaries (including those covered by 33 U.S.C. 408), the scope of analysis should include those portions of the project outside the boundaries of the Corps jurisdiction. To use the same example, if 30 miles of the 50-mile transmission line would cross jurisdictional wetlands, other “waters of the United States,” or Corps civil works boundaries covered by 33 U.S.C. 408, the scope of analysis should reflect impacts of the whole 50-mile transmission line.
Notes, amendments, and revision history
Authority
Authority: 5 U.S.C. 301; 33 U.S.C. 401 et seq.; 33 U.S.C. 1344; 33 U.S.C. 1413; 42 U.S.C. 4321 et seq.
Source
Source: 90 FR 29472, July 3, 2025, unless otherwise noted.