§154.2200. Applicable transfer facility design and installation requirements.
33 C.F.R. § 154.2200
A tank barge cleaning facility's (TBCF's) vapor control system (VCS) must meet the following design and installation requirements of this subpart for a transfer facility's VCS:
33 CFR 154.2102: facility requirements for vessel liquid overfill protection, if a TBCF receives vapor from a tank barge that is required by 46 CFR 39.6001(f)(3) to be equipped with a liquid overfill protection arrangement and meet 46 CFR 39.2009;
33 CFR 154.2106: detonation arrester installation;
33 CFR 154.2107: inerting, enriching, and diluting systems;
33 CFR 154.2108: vapor-moving devices;
33 CFR 154.2109: vapor recovery and vapor destruction units;
33 CFR 154.2111: VCS connected to a facility's main VCS;
33 CFR 154.2112: special requirements for vapors with the potential to polymerize or freeze; and
33 CFR 154.2113: special requirements for alkylene oxides.
Notes, amendments, and revision history
Source
Source: USCG-1999-5150, 78 FR 42618, July 16, 2013, unless otherwise noted.
Authority
Authority: 33 U.S.C. 1321(j)(1)(C), (j)(5), (j)(6), and (m)(2); 46 U.S.C. 70011, 70034; sec. 2, E.O. 12777, 56 FR 54757; Department of Homeland Security Delegation No. 00170.1, Revision No. 01.2. Subpart F is also issued under 33 U.S.C. 2735. Vapor control recovery provisions of Subpart P are also issued under 42 U.S.C. 7511b(f)(2).