§154.2106. Detonation arresters installation.

33 C.F.R. § 154.2106

This section applies only to facilities collecting vapors of flammable, combustible, or non-high flash point liquid cargoes.
(a)
Detonation arresters must be installed in accordance with the guidelines outlined in the arrester manufacturer's acceptance letter provided by the Coast Guard.
(b)
On either side of a detonation arrester, line size expansions must be in a straight pipe run and must be no closer than 120 times the pipe's diameter from the detonation arrester unless the manufacturer has test data to show the expansion can be closer.
Notes, amendments, and revision history

Source

Source: USCG-1999-5150, 78 FR 42618, July 16, 2013, unless otherwise noted.

Authority

Authority: 33 U.S.C. 1321(j)(1)(C), (j)(5), (j)(6), and (m)(2); 46 U.S.C. 70011, 70034; sec. 2, E.O. 12777, 56 FR 54757; Department of Homeland Security Delegation No. 00170.1, Revision No. 01.2. Subpart F is also issued under 33 U.S.C. 2735. Vapor control recovery provisions of Subpart P are also issued under 42 U.S.C. 7511b(f)(2).