§127.105. Layout and spacing of marine transfer area for LNG.
33 C.F.R. § 127.105
LNG impounding spaces must be located so that the heat flux from a fire over the impounding spaces does not cause structural damage to an LNG vessel moored or berthed at the waterfront facility handling LNG.
Each LNG loading flange must be located at least 300 meters (984.3 feet) from the following which are primarily intended for the use of the general public or railways:
Each bridge crossing a navigable waterway.
Each entrance to any tunnel under a navigable waterway.
Notes, amendments, and revision history
Amendments
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995]
Authority
Authority: 33 U.S.C. 1504(j)(2); 46 U.S.C. 70011 and 70034; 46 U.S.C. Chapter 701; DHS Delegation No. 00170.1, Revision No. 01.2, paragraph (II)(92)(a).
Source
Source: CGD 78-038, 53 FR 3376, Feb. 7, 1988, unless otherwise noted.
Amendments
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995]