§25.1725. Powerplants: EWIS.
14 C.F.R. § 25.1725
EWIS associated with any powerplant must be designed and installed so that the failure of an EWIS component will not prevent the continued safe operation of the remaining powerplants or require immediate action by any crewmember for continued safe operation, in accordance with the requirements of § 25.903(b).
Design precautions must be taken to minimize hazards to the airplane due to EWIS damage in the event of a powerplant rotor failure or a fire originating within the powerplant that burns through the powerplant case, in accordance with the requirements of § 25.903(d)(1).
Notes, amendments, and revision history
Source
Source: Docket No. FAA-2004-18379, 72 FR 63406, Nov. 8, 2007, unless otherwise noted.
Authority
Authority: 49 U.S.C. 106(f), 106(g), 40113, 44701, 44702 and 44704; Pub. L. 115-254, 132 Stat 3281 (49 U.S.C. 44903 note).
Source
Source: Docket No. 5066, 29 FR 18291, Dec. 24, 1964, unless otherwise noted.