US Codex
C.F.R.
Browse by date
Notes

§53.620. Manufacturing. — Inbound Citations

10 C.F.R. § 53.620

Cited by 14 regulations in release Current.

Citations to 10 C.F.R. § 53.620 as a whole

Citations to §53.620(a)(6)

Citations to §53.620(d)

  • (3) If available at the time of filing the ML application or, if not available at the time of filing the ML application, submitted as an amendment to the ML or ML application at the time of filing the Part 70 application, a description of the programs needed to demonstrate compliance with the requirements of § 53.620(d) and 10 CFR parts 70, 71, and 73 for the receipt, storage, and loading of SNM into a manufactured reactor and the transport of the fueled manufactured reactor to a site for which the Commission has issued a COL or CP and OL that authorizes construction and operation of a commercial nuclear plant using the manufactured reactor, including the following.
    (i) A physical security program in accordance with § 53.620(d)(2)(i).
    (ii) A cybersecurity program in accordance with § 53.620(d)(2)(i).

Citations to §53.620(d)(1)

  • (2) A holder of a combined license issued under part 52 or 53 of this chapter before the Commission has made the finding under § 52.103(g) or § 53.1452(g) of this chapter, as applicable, must establish, implement, and maintain an emergency preparedness program that meets the requirements of paragraph (b) of this section, as described in the approved emergency plan and license, and conduct an initial exercise to demonstrate this compliance within 2 years before the scheduled date for initial loading of fuel (or, for a fueled manufactured reactor, within 2 years before the scheduled date for initiating the removal of the features to prevent criticality required under § 53.620(d)(1) of this chapter).
  • (b) Each holder of a COL under this part must, 2 years before and 1 year before the scheduled date for initial loading of fuel (or, for a fueled manufactured reactor, 2 years before and 1 year before the scheduled date for initiating the removal of the features to prevent criticality required under § 53.620(d)(1)) submit a report to the NRC containing a certification updating the DCEs and a copy of the financial instrument to be used to satisfy § 53.1040. No later than 30 days after the Commission publishes notice in the Federal Register under § 53.1452(a), the licensee must submit an updated decommissioning report required under § 53.1010(b)(1)(ii), including a copy of the financial instrument obtained to satisfy § 53.1040.
  • (a) The licensee must submit to the NRC, no later than 1 year after issuance of the COL or at the start of construction as defined at § 53.020, whichever is later, its schedule for completing the inspections, tests, or analyses in the ITAAC. The licensee must submit updates to the ITAAC schedules every 6 months thereafter and, within 1 year of its scheduled date for initial loading of fuel (or, for a fueled manufactured reactor, within 1 year of its scheduled date for initiating the removal of the features to prevent criticality required under § 53.620(d)(1)), the licensee must submit updates to the ITAAC schedule every 30 days until the final notification is provided to the NRC under paragraph (c)(1) of this section.
  • (ii) Before initial fuel load into the reactor (or, for a fueled manufactured reactor, before initiating the removal of the features to prevent criticality required under § 53.620(d)(1)), a cybersecurity program that meets the requirements of § 73.54 or § 73.110 of this chapter, a physical security program that meets the requirements of § 73.55 or § 73.100 of this chapter, and an access authorization program that meets the requirements of § 73.56 or § 73.120 of this chapter must be established, as applicable.
  • (ii) The simulation facility must utilize models relating to nuclear, thermal-hydraulic, and other applicable design-specific characteristics that either replicate the most recent fuel load in the reference commercial nuclear plant or, prior to initial fuel load (or, for a fueled manufactured reactor, prior to initiating the removal of the features to prevent criticality required under § 53.620(d)(1)), replicate the intended initial fuel load for the reference commercial nuclear plant, with the exception of those portions of the simulation facility that utilize the reference plant itself.
  • (ii) The simulation facility must utilize models relating to nuclear, thermal-hydraulic, and other applicable design-specific characteristics that either replicate the most recent fuel load in the reference commercial nuclear plant or, prior to initial fuel load (or, for a fueled manufactured reactor, prior to initiating the removal of the features to prevent criticality required under § 53.620(d)(1)), replicate the intended initial fuel load for the reference commercial nuclear plant, with the exception of those portions of the simulation facility that utilize the reference plant itself.
  • (b) Prior to initial fuel load (or, for a fueled manufactured reactor, prior to initiating the removal of the features to prevent criticality required under § 53.620(d)(1)), each holder of an operating or COL under this part must, with sufficient time to provide trained and qualified personnel to operate the facility, establish, implement, and maintain a training program that demonstrates compliance with the requirements of paragraphs (c) and (d) of this section.
  • (ii) Each licensee that demonstrates no achievable target sets exist in accordance with paragraph (b)(5) of this section, and credits active measures in making that demonstration, must implement the requirements of this section through its physical security plan, training and qualification plan, safeguards contingency plan, and cybersecurity plan, referred to collectively hereafter as “security plans,” before initial fuel load into the reactor (or, for a fueled manufactured reactor, before initiating the removal of the features to prevent criticality required under § 53.620(d)(1) of this chapter); for such licensees, the requirements of paragraphs (b)(2) through (4) of this section will be deemed satisfied if the physical protection program is designed to ensure that the credited active measures will be implemented in response to threats up to and including the design-basis threat of radiological sabotage.
  • (a) Each applicant for an operating license or a holder of a combined license under 10 CFR part 53 must establish, maintain, and implement an access authorization program before initial fuel load into the reactor (or, for a fueled manufactured reactor, before initiating the removal of the features to prevent criticality required under § 53.620(d)(1) of this chapter). The requirements in this section apply to applicants and licensees who demonstrate compliance with 10 CFR 73.100(a)(1)(i).

Citations to §53.620(d)(2)(i)