§52.99. Inspection during construction; ITAAC schedules and notifications; NRC notices. — Inbound Citations

10 C.F.R. § 52.99

Cited by 5 regulations in release Current.

Citations to 10 C.F.R. § 52.99 as a whole

Citations to §52.99(a)

  • (3) Each holder of a combined license under subpart C of 10 CFR part 52 shall, 2 years before and 1 year before the scheduled date for initial loading of fuel, consistent with the schedule required by § 52.99(a), submit a report to the NRC containing a certification updating the information described under paragraph (b)(1) of this section, including a copy of the financial instrument to be used. No later than 30 days after the Commission publishes notice in the Federal Register under 10 CFR 52.103(a), the licensee shall submit a report containing a certification that financial assurance for decommissioning is being provided in an amount specified in the licensee's most recent updated certification, including a copy of the financial instrument obtained to satisfy the requirements of paragraph (e) of this section.

Citations to §52.99(c)

  • (ii) The manner in which the licensee notifications under § 52.99(c) or § 53.1449(c) of this chapter which are required to be made available by § 52.99(e)(2) or § 53.1449(e)(2) of this chapter may be obtained and examined;
  • (vii) In a proceeding under § 52.103(b) or § 53.1452(b) of this chapter, as applicable, the information must be sufficient, and include supporting information showing, prima facie, that one or more of the acceptance criteria in the combined license have not been, or will not be met, and that the specific operational consequences of nonconformance would be contrary to providing reasonable assurance of adequate protection of the public health and safety. This information must include the specific portion of the report required by § 52.99(c) or § 53.1449(c) of this chapter, as applicable, which the requestor believes is inaccurate, incorrect, and/or incomplete (i.e., fails to contain the necessary information required by § 52.99(c) or § 53.1449(c) of this chapter, as applicable). If the requestor identifies a specific portion of the report under § 52.99(c) or § 53.1449(c) of this chapter, as applicable, as incomplete and the requestor contends that the incomplete portion prevents the requestor from making the necessary prima facie showing, then the requestor must explain why this deficiency prevents the requestor from making the prima facie showing.

Citations to §52.99(e)(2)