§45V. Credit for production of clean hydrogen
26 U.S.C. § 45V
the applicable percentage shall be 20 percent.
the applicable percentage shall be 25 percent.
the applicable percentage shall be 33.4 percent.
such facility shall be deemed to have been originally placed in service as of the date that the property required to complete the modification described in subparagraph (B) is placed in service.
shall be paid wages at rates not less than the prevailing rates for construction, alteration, or repair of a similar character in the locality in which such facility is located as most recently determined by the Secretary of Labor, in accordance with subchapter IV of chapter 31 of title 40, United States Code. For purposes of determining an increased credit amount under paragraph (1) for a taxable year, the requirement under clause (ii) of this subparagraph is applied to such taxable year in which the alteration or repair of qualified facility occurs.
Notes, amendments, and revision history
(Added and amended Pub. L. 117–169, title I, § 13204(a)(1)–(3), Aug. 16, 2022, 136 Stat. 1936, 1938, 1939; Pub. L. 119–21, title VII, § 70511, July 4, 2025, 139 Stat. 252.)
Editorial Notes
References in Text
The date of enactment of this section, referred to in subsecs. (c)(1)(A) and (f), is the date of enactment of Pub. L. 117–169, which was approved Aug. 16, 2022.
Amendments
2025—Subsec. (c)(3)(C). Pub. L. 119–21 substituted “January 1, 2028” for “January 1, 2033”.
2022—Subsec. (d)(3). Pub. L. 117–169, § 13204(a)(2), added par. (3).
Subsec. (d)(4). Pub. L. 117–169, § 13204(a)(3), added par. (4).
Statutory Notes and Related Subsidiaries
Effective Date
Pub. L. 117–169, title I, § 13204(a)(5), Aug. 16, 2022, 136 Stat. 1939, provided that: In general.—The amendments made by paragraphs (1) [enacting this section] and (4) [amending section 38 of this title] of this subsection shall apply to hydrogen produced after December 31, 2022. Credit reduced for tax-exempt bonds.—The amendment made by paragraph (2) [amending this section] shall apply to facilities the construction of which begins after the date of enactment of this Act [Aug. 16, 2022]. Modification of existing facilities.—The amendment made by paragraph (3) [amending this section] shall apply to modifications made after December 31, 2022.”