10 U.S.C. § 6153
(a)
Plan for Construction and Operation of MOX Facility.—
(1)
Not later than February 1, 2003, the
Secretary of Energy shall submit to Congress a plan for the construction and operation of the MOX
facility at the Savannah River Site, Aiken, South Carolina.
(2)
The plan under
paragraph (1) shall
include—
(A)
a schedule for construction and operations so as to achieve, as of January 1, 2012, and thereafter, the MOX production objective, and to produce 1 metric ton of mixed-oxide fuel by December 31, 2012; and
(B)
a schedule of operations of the MOX
facility designed so that 34 metric tons of defense plutonium and defense plutonium materials at the Savannah River Site will be processed into mixed-oxide fuel by January 1, 2019.
(3)
(A)
Not later than February 15 each year, beginning in 2004 and continuing through 2024, the
Secretary shall submit to Congress a report on the implementation of the plan required by
paragraph (1).
(B)
Each report under
subparagraph (A) for years before 2010 shall
include—
(i)
an assessment of compliance with the schedules included with the plan under
paragraph (2); and
(ii)
a certification by the
Secretary whether or not the MOX production objective can be met by January 2012.
(C)
Each report under
subparagraph (A) for years after 2014
shall—
(i)
address whether the MOX production objective has been met; and
(ii)
assess progress toward meeting the obligations of the
United States under the Plutonium Management and Disposition Agreement.
(D)
Each report under
subparagraph (A) for years after 2019 shall also include an assessment of compliance with the MOX production objective and, if not in compliance, the plan of the
Secretary for achieving one of the following:
(i)
Compliance with such objective.
(ii)
Removal of all remaining defense plutonium and defense plutonium materials from the
State of South Carolina.
(b)
Corrective Actions.—
(1)
If a report under
subsection (a)(3) indicates that construction or operation of the MOX
facility is behind the applicable schedule under
subsection (g) by 12 months or more, the
Secretary shall submit to Congress, not later than August 15 of the year in which such report is submitted, a plan for corrective actions to be implemented by the
Secretary to ensure that the MOX
facility project is capable of meeting the MOX production objective.
(2)
If a plan is submitted under
paragraph (1) in any year after 2008, the plan shall include corrective actions to be implemented by the
Secretary to ensure that the MOX production objective is met.
(3)
Any plan for corrective actions under paragraph
(1) or
(2) shall include established milestones under such plan for achieving compliance with the MOX production objective.
(4)
If, before January 1, 2012, the
Secretary determines that there is a substantial and material risk that the MOX production objective will not be achieved by 2012 because of a failure to achieve milestones set forth in the most recent corrective action plan under this subsection, the
Secretary shall suspend further transfers of defense plutonium and defense plutonium materials to be processed by the MOX
facility until such risk is addressed and the
Secretary certifies that the MOX production objective can be met by 2012.
(5)
If, after January 1, 2014, the
Secretary determines that the MOX production objective has not been achieved because of a failure to achieve milestones set forth in the most recent corrective action plan under this subsection, the
Secretary shall suspend further transfers of defense plutonium and defense plutonium materials to be processed by the MOX
facility until the
Secretary certifies that the MOX production objective can be met.
(6)
(A)
Upon making a determination under paragraph
(4) or
(5), the
Secretary shall submit to Congress a report on the options for removing from the
State of South Carolina an amount of defense plutonium or defense plutonium materials equal to the amount of defense plutonium or defense plutonium materials transferred to the
State of South Carolina after April 15, 2002.
(B)
Each report under
subparagraph (A) shall include an analysis of each option set forth in the report, including the cost and schedule for implementation of such option, and any requirements under the National Environmental Policy Act of 1969 (
42 U.S.C. 4321 et seq.) relating to consideration or selection of such option.
(C)
Upon submittal of a report under
subparagraph (A), the
Secretary shall commence any analysis that may be required under the National Environmental Policy Act of 1969 in order to select among the options set forth in the report.
(c)
Contingent Requirement for Removal of Plutonium and Materials From Savannah River Site.— If the MOX production objective is not achieved as of January 1, 2014, the
Secretary shall, consistent with the National Environmental Policy Act of 1969 (
42 U.S.C. 4321 et seq.) and other applicable laws, remove from the
State of South Carolina, for storage or
disposal elsewhere—
(1)
not later than January 1, 2016, not less than 1 metric ton of defense plutonium or defense plutonium materials; and
(2)
not later than January 1, 2022, an amount of defense plutonium or defense plutonium materials equal to the amount of defense plutonium or defense plutonium materials transferred to the Savannah River Site between April 15, 2002, and January 1, 2022, but not processed by the MOX
facility.
(d)
Economic and Impact Assistance.—
(1)
If the MOX production objective is not achieved as of January 1, 2016, the
Secretary shall, subject to the availability of appropriations,
pay to the
State of South Carolina each year beginning on or after that date through 2021 for economic and impact assistance an amount equal to $1,000,000 per day, not to exceed $100,000,000 per year, until the later
of—
(A)
the date on which the MOX production objective is achieved in such year; or
(B)
the date on which the
Secretary has removed from the
State of South Carolina in such year at least 1 metric ton of defense plutonium or defense plutonium materials.
(2)
(A)
If, as of January 1, 2022, the MOX
facility has not processed mixed-oxide fuel from defense plutonium and defense plutonium materials in the amount of not less
than—
(i)
one metric ton, in each of any two consecutive calendar years; and
(ii)
three metric tons total,
the Secretary shall, from funds available to the Secretary, pay to the State of South Carolina for economic and impact assistance an amount equal to $1,000,000 per day, not to exceed $100,000,000 per year, until the removal by the Secretary from the State of South Carolina of an amount of defense plutonium or defense plutonium materials equal to the amount of defense plutonium or defense plutonium materials transferred to the Savannah River Site between April 15, 2002, and January 1, 2022, but not processed by the MOX facility.
(B)
Nothing in this paragraph may be construed to terminate, supersede, or otherwise affect any other requirements of this section.
(3)
If the
State of South Carolina obtains an injunction that prohibits the
Department of Energy from taking any action necessary for the
Department to meet any deadline specified by this subsection, that deadline shall be extended for a period of time equal to the period of time during which the injunction is in effect.
(e)
Failure to Complete Planned Disposition Program.— If less than 34 metric tons of defense plutonium or defense plutonium materials have been processed by the MOX
facility by October 1, 2026, the
Secretary shall, not later than December 1, 2026, and on a biennial basis thereafter, submit to Congress a plan
for—
(1)
completing the processing of 34 metric tons of defense plutonium and defense plutonium material by the MOX
facility; or
(2)
removing from the
State of South Carolina an amount of defense plutonium or defense plutonium materials equal to the amount of defense plutonium or defense plutonium materials transferred to the Savannah River Site after April 15, 2002, but not processed by the MOX
facility.
(f)
Removal of Mixed-oxide Fuel Upon Completion of Operations of MOX Facility.— If, one year after the date on which operation of the MOX
facility permanently ceases, any mixed-oxide fuel remains at the Savannah River Site, the
Secretary shall submit to
Congress—
(1)
a report on when such fuel will be transferred for use in commercial nuclear reactors; or
(2)
a plan for removing such fuel from the
State of South Carolina.
(g)
Baseline.— Not later than December 31, 2006, the
Secretary shall submit to Congress a report on the construction and operation of the MOX
facility that
includes a schedule for revising the requirements of this section during fiscal year 2007 to conform with the schedule established by the
Secretary for the MOX
facility, which shall be based on estimated funding levels for the fiscal year.
(h)
Definitions.— In this section:
(1)
The term “MOX production objective” means production at the MOX
facility of mixed-oxide fuel from defense plutonium and defense plutonium materials at an average
rate equivalent to not less than one metric ton of mixed-oxide fuel per year. The average
rate shall be determined by measuring production at the MOX
facility from the date the
facility is declared operational to the Nuclear Regulatory Commission through the date of assessment.
(2)
The term “MOX
facility” means the mixed-oxide fuel fabrication
facility at the Savannah River Site, Aiken, South Carolina.
(3)
The terms “defense plutonium” and “defense plutonium materials” mean weapons-usable plutonium.
Notes, amendments, and revision history
(Added and amended Pub. L. 119–60, div. C, title XXXI, § 3111(a), (d)(2), Dec. 18, 2025, 139 Stat. 1373, 1462.)
Editorial Notes
References in Text
The National Environmental Policy Act of 1969, referred to in subsecs. (b)(6)(B), (C) and (c), is Pub. L. 91–190, Jan. 1, 1970, 83 Stat. 852, which is classified generally to chapter 55 (§ 4321 et seq.) of Title 42, The Public Health and Welfare. For complete classification of this Act to the Code, see Short Title note set out under section 4321 of Title 42 and Tables.
Prior Provisions
A prior section 6153 was enumbered section 8264 of this title.
Provisions similar to those in this section were contained in section 2566 of Title 50, War and National Defense, prior to repeal by Pub. L. 119–60, § 3111(b)(1).
Amendments
2025—Pub. L. 119–60, § 3111(d)(2)(B), realigned margins.
Subsec. (h). Pub. L. 119–60, § 3111(d)(2)(A), struck out pars. (1) to (3) headings which corresponded to the defined term in each par.