For purposes of this order:
(a) “Data Center Project” means a facility that requires greater than 100 megawatts (MW) of new load dedicated to AI inference, training, simulation, or synthetic data generation.
(b) “Covered Components” means materials, products, and infrastructure that are required to build Data Center Projects or otherwise upon which Data Center Projects depend, including:
(i) energy infrastructure, such as transmission lines, natural gas pipelines or laterals, substations, switchyards, transformers, switchgear, and system protective facilities;
(ii) natural gas turbines, coal power equipment, nuclear power equipment, geothermal power equipment, and any other dispatchable baseload energy sources, including electrical infrastructure (including backup power supply) constructed or otherwise used principally to serve a Data Center Project;
(iii) semiconductors and semiconductor materials, such as wafers, dies, and packaged integrated circuits;
(iv) networking equipment, such as switches and routers; and
(v) data storage, such as hardware storage systems, software for data management and protection, and integrated services that work with public cloud providers.
(c) “Covered Component Project” means infrastructure comprising Covered Components, or a facility with the primary purposes of manufacturing or otherwise producing Covered Components.
(d) “Qualifying Project” means:
(i) a Data Center Project or Covered Component Project for which the Project Sponsor has committed at least $500 million in capital expenditures as determined by the Secretary of Commerce;
(ii) a Data Center Project or Covered Component Project involving an incremental electric load addition of greater than 100 MW;
(iii) a Data Center Project or Covered Component Project that protects national security; or
(iv) a Data Center Project or Covered Component Project that has otherwise been designated by the Secretary of Defense, the Secretary of the Interior, the Secretary of Commerce, or the Secretary of Energy as a “Qualifying Project”.
(e) “Project Sponsor” means the lead sponsor providing financial and other support for a Data Center Project or Covered Component Project, as determined by the Secretary of Defense, the Secretary of the Interior, the Secretary of Commerce, or the Secretary of Energy, as appropriate.
(f) “Superfund Site” means any site where action is being taken pursuant to 42 U.S.C. 9604, 9606, or 9620.
(g) “Brownfield Site” means a site as defined in 42 U.S.C. 9601(39).