§632.16. Methods of applying planned land use and treatment.
7 C.F.R. § 632.16
Land users may arrange to apply the planned land uses and conservation treatment specified in the contract by one or more of the following methods:
By performing the required treatment with his own labor and equipment.
By hiring a qualified contractor to install the required treatment.
By requesting NRCS to award and administer a contract to perform the required treatment in accordance with 41 CFR chapters I and IV.
State conservationists are to develop criteria specifying the conditions for which NRCS will award and administer a contract. Criteria will consider: Type of equipment required, type and amount of conservation treatment required, costs of the required reclamation, needs of the land user, and the applicable cost-share rate. If the Federal share is less than 100 percent, a land user must put up his estimated share of the cost before NRCS awards the contract.
Notes, amendments, and revision history
Authority
Authority: Sec. 406, Pub. L. 95-87; 91 Stat. 460 (30 U.S.C. 1236).
Source
Source: 43 FR 44749, Sept. 28, 1978, unless otherwise noted.