§1753.7. Plans and specifications (P&S). — Inbound Citations

7 C.F.R. § 1753.7

Cited by 2 regulations in release Current.

Citations to 7 U.S.C. § 1753.7 as a whole

  • (4) RUS standards for materials, equipment, and construction financed with loan funds (See § 1753.7), and
  • (1) The borrower is responsible for scheduling the bid opening date. If RUS review of P&S is required by § 1753.7, the borrower shall wait until approval has been received before setting the date. In setting the date, sufficient time should be allowed for the bidders to examine the project site and prepare their bids. The borrower shall notify GFR of the bid date and invite GFR to attend.