§1753.3. Preconstruction review. — Inbound Citations
7 C.F.R. § 1753.3
Statutory Authority
Cited by 3 regulations in release Current.
Citations to 7 U.S.C. § 1753.3 as a whole
-
(1) RUS's general requirements with respect to steps to be taken after the loan is approved and before construction begins (See § 1753.3),
-
(i) A review shall be made of the outside plant requirements, and the Loan Design (LD) shall be revised to reflect any needed changes (See § 1753.3).
-
(d) The P&S shall be based on the LD approved by RUS. Section 1753.3 presents the requirements and procedures for obtaining RUS approval for construction that does not conform to the LD approved by RUS.