§271.103. Risk-based hazard management program. — Inbound Citations
49 C.F.R. § 271.103
Statutory Authority
Cited by 6 regulations in release Current.
Citations to 49 C.F.R. § 271.103 as a whole
-
(1) A risk-based hazard management program, as described in § 271.103;
-
(3) Evaluate the effectiveness of risk mitigations in reducing the risk associated with an identified hazard. Any hazards associated with ineffective mitigation strategies shall be reevaluated through the railroad's risk-based HMP, as described in § 271.103; and
Citations to §271.103(b)
-
(1) “Information” includes plans, reports, documents, surveys, schedules, lists, or data, and specifically includes a railroad's analysis of its safety risks under § 271.103(b) and a railroad's statement of mitigation measures under § 271.103(c);
-
(a) An RRP plan shall describe the railroad's method for conducting its risk-based hazard analysis pursuant to § 271.103(b). At a minimum, the description shall specify:(1) The processes the railroad will use to identify hazards and the risks associated with those hazards;(2) The sources the railroad will use to support the ongoing identification of hazards and the risks associated with those hazards; and(3) The processes the railroad will use to compare and prioritize identified risks for mitigation purposes.
Citations to §271.103(c)
-
(1) “Information” includes plans, reports, documents, surveys, schedules, lists, or data, and specifically includes a railroad's analysis of its safety risks under § 271.103(b) and a railroad's statement of mitigation measures under § 271.103(c);
-
(b) An RRP plan shall describe the railroad's processes for designing and implementing mitigation strategies pursuant to § 271.103(c). At a minimum, the description shall specify the railroad's processes for:(1) Identifying and selecting mitigation strategies; and