§246.120. Requirements for qualification. — Inbound Citations
49 C.F.R. § 246.120
Statutory Authority
Cited by 3 regulations in release Current.
Citations to 49 C.F.R. § 246.120 as a whole
Citations to §246.120(c)
-
(3) The maximum time period that a certified signal employee can be absent from performing work on signal system equipment or signal-related technology that requires certification pursuant to this part before requalification will be required. In accordance with § 246.120(c), this time period cannot exceed 12 months.