§232.303. General requirements. — Inbound Citations
49 C.F.R. § 232.303
Statutory Authority
Cited by 10 regulations in release Current.
Citations to §232.303(a)
-
(1) A car has its brakes cut-out or inoperative when removed from a train or when placed on a shop or repair track, as defined in § 232.303(a);
Citations to §232.303(a)(1)(i)
-
(v) The facilities and tracks identified in paragraphs (a)(1)(i) through (a)(1)(iv) shall be considered shop or repair tracks regardless of whether a mobile repair vehicle is used to conduct the repairs.
Citations to §232.303(a)(1)(ii)
-
(v) The facilities and tracks identified in paragraphs (a)(1)(i) through (a)(1)(iv) shall be considered shop or repair tracks regardless of whether a mobile repair vehicle is used to conduct the repairs.
Citations to §232.303(a)(1)(iii)
-
(v) The facilities and tracks identified in paragraphs (a)(1)(i) through (a)(1)(iv) shall be considered shop or repair tracks regardless of whether a mobile repair vehicle is used to conduct the repairs.
Citations to §232.303(a)(1)(iv)
-
(v) The facilities and tracks identified in paragraphs (a)(1)(i) through (a)(1)(iv) shall be considered shop or repair tracks regardless of whether a mobile repair vehicle is used to conduct the repairs.
Citations to §232.303(b)
-
(a) In addition to the maintenance requirements contained in § 232.303(b) through (d), a freight car equipped with an ECP brake system shall be inspected and repaired before being released from a shop or repair track to ensure the proper and safe condition of the following:(1) ECP brake system wiring and brackets;(2) ECP brake system electrical connections; and
Citations to §232.303(c)
-
(a) In addition to the maintenance requirements contained in § 232.303(b) through (d), a freight car equipped with an ECP brake system shall be inspected and repaired before being released from a shop or repair track to ensure the proper and safe condition of the following:(1) ECP brake system wiring and brackets;(2) ECP brake system electrical connections; and
Citations to §232.303(d)
-
(a) In addition to the maintenance requirements contained in § 232.303(b) through (d), a freight car equipped with an ECP brake system shall be inspected and repaired before being released from a shop or repair track to ensure the proper and safe condition of the following:(1) ECP brake system wiring and brackets;(2) ECP brake system electrical connections; and
Citations to §232.303(e)
-
(b) Except as provided in § 232.303(e), a railroad shall perform a single car air brake test on a car when:(1) A car has its brakes cut-out or inoperative when removed from a train or when placed on a shop or repair track, as defined in § 232.303(a);(2) A car is on a shop or repair track, as defined in § 232.303(a), for any reason and has not received either:(i) A manual single car air brake test (AAR Standard S-486) within the previous 12-month period;(ii) An automated single car air brake test (AAR Standard S-4027 §§ 3.0 and 4.0) within the previous 24-month period;(iii) Or a 4-pressure single car air brake test (AAR Standard S-4027 § 13.0) within the previous 48-month period;(3) A car is found with missing or incomplete single car air brake test information;(i) Brake reservoir;(ii) Control valve mounting gasket;(iii) Pipe bracket stud;(iv) Service portion;(v) Emergency portion; or(i) Built-up tread, unless known to be caused by hand brake left applied;(ii) Slid flat wheel, unless known to be caused by hand brake left applied; or
-
(c) Except as provided in § 232.303(e), a single car air brake test conducted in accordance with the procedure submitted and approved in accordance with paragraph (b) of this section shall be performed by a qualified person on a freight car equipped with an ECP brake system whenever any of the events identified in § 232.305 occur, except for those paragraphs identified in paragraph (f) of this section.