§230.43. Gauge siphon.
49 C.F.R. § 230.43
The steam gauge supply pipe shall have a siphon on it of ample capacity to prevent steam from entering the gauge. The supply pipe shall directly enter the boiler and be maintained steam tight. The supply pipe and its connections shall be cleaned each time the gauge is tested.
Notes, amendments, and revision history
Authority
Authority: 49 U.S.C. 20103, 20107, 20702; 28 U.S.C. 2461 note; and 49 CFR 1.89.
Source
Source: 64 FR 62865, Nov. 17, 1999, unless otherwise noted.