US Codex
C.F.R.
Browse by date
Notes

§213.235. Inspection of switches, track crossings, and lift rail assemblies or other transition devices on moveable bridges. — Inbound Citations

49 C.F.R. § 213.235

Cited by 2 regulations in release Current.

Citations to 49 U.S.C. § 213.235 as a whole

  • (iv) All CWR joints that are located in switches, turnouts, track crossings, lift rail assemblies or other transition devices on moveable bridges must be inspected on foot at least monthly, consistent with the requirements in § 213.235; and all records of those inspections must be kept in accordance with the requirements in § 213.241. A track owner may include in its § 213.235 inspections, in lieu of the joint inspections required by paragraph (h)(6)(i) of this section, CWR joints that are located in track structure that is adjacent to switches and turnouts, provided that the track owner precisely defines the parameters of that arrangement in the CWR plans.
  • (b) Each record of an inspection under §§ 213.4, 213.119, 213.233, and 213.235 shall be prepared on the day the inspection is made and signed or otherwise certified by the person making the inspection. Records shall specify the author of the record, the type of track inspected, date and location of inspection, location and nature of any deviation from the requirements of this part, and the remedial action taken by the person making the inspection. The track owner shall designate the location(s) where each original record shall be maintained for at least one year after the inspection covered by the record. The track owner shall also designate one location, within 100 miles of each State in which it conducts operations, where copies of records that apply to those operations are maintained or can be viewed following 10 days' notice by the Federal Railroad Administration.