§213.109. Crossties. — Inbound Citations

49 C.F.R. § 213.109

Cited by 2 regulations in release Current.

Citations to 49 U.S.C. § 213.109 as a whole

  • (a) A track owner may elect to implement a Gage Restraint Measurement System (GRMS), supplemented by the use of a Portable Track Loading Fixture (PTLF), to determine compliance with the crosstie and fastener requirements specified in §§ 213.109 and 213.127 provided that—
    (1) The track owner notifies FRA's Track and Structures Division at least 30 days prior to the designation of any line segment on which GRMS technology will be implemented; and
    (2) The track owner notifies FRA's Track and Structures Division at least 10 days prior to the removal of any line segment from GRMS designation.

Citations to §213.109(d)(4)

  • (a) Except for track described in paragraph (c) of this section, the provisions in this section are applicable on and after July 1, 2012. In addition to the track inspection required under § 213.233, for Class 3 main track constructed with concrete crossties over which regularly scheduled passenger service trains operate, and for Class 4 and 5 main track constructed with concrete crossties, automated inspection technology shall be used as indicated in paragraph (b) of this section, as a supplement to visual inspection, by Class I railroads (including Amtrak), Class II railroads, other intercity passenger railroads, and commuter railroads or small governmental jurisdictions that serve populations greater than 50,000. Automated inspection shall identify and report exceptions to conditions described in § 213.109(d)(4).