§196.103. What must an excavator do to protect underground pipelines from excavation-related damage?
49 C.F.R. § 196.103
Prior to and during excavation activity, the excavator must:
Use an available one-call system before excavating to notify operators of underground pipeline facilities of the timing and location of the intended excavation;
If underground pipelines exist in the area, wait for the pipeline operator to arrive at the excavation site and establish and mark the location of its underground pipeline facilities before excavating;
Excavate with proper regard for the marked location of pipelines an operator has established by taking all practicable steps to prevent excavation damage to the pipeline;
Make additional use of one-call as necessary to obtain locating and marking before excavating to ensure that underground pipelines are not damaged by excavation.
Notes, amendments, and revision history
Authority
Authority: 49 U.S.C. 60101 et seq.; and 49 CFR 1.97.
Source
Source: 80 FR 43866, July 23, 2015, unless otherwise noted.