§195.5. Conversion to service subject to this part. — Inbound Citations

49 C.F.R. § 195.5

Cited by 8 regulations in release Current.

Citations to 49 C.F.R. § 195.5 as a whole

  • (i) Design, install, construct, initially inspect, and initially test the pipeline in compliance with this part, unless the pipeline is converted under § 195.5.
    (ii) [Reserved]
  • (b) Except for pipelines converted under § 195.5, the following pipelines may be operated without pressure testing under this subpart:
    (1) Any hazardous liquid pipeline whose maximum operating pressure is established under § 195.406(a)(5) that is—
    (i) An interstate pipeline constructed before January 8, 1971;
    (ii) An interstate offshore gathering line constructed before August 1, 1977;
    (iii) An intrastate pipeline constructed before October 21, 1985; or
    (i) Has its maximum operating pressure established under § 195.406(a)(5); or
    (4) Those portions of older hazardous liquid and carbon dioxide pipelines for which an operator has elected the risk-based alternative under § 195.303 and which are not required to be tested based on the risk-based criteria.
  • (c) Except as provided in § 195.5, no operator may operate any part of any of the following pipelines unless it was designed and constructed as required by this part:
    (1) An interstate pipeline, other than a low-stress pipeline, on which construction was begun after March 31, 1970, that transports hazardous liquid.
    (2) An interstate offshore gathering line, other than a low-stress pipeline, on which construction was begun after July 31, 1977, that transports hazardous liquid.
    (3) An intrastate pipeline, other than a low-stress pipeline, on which construction was begun after October 20, 1985, that transports hazardous liquid.
  • (1) The internal design pressure of the pipe determined in accordance with § 195.106. However, for steel pipe in pipelines being converted under § 195.5, if one or more factors of the design formula (§ 195.106) are unknown, one of the following pressures is to be used as design pressure:
    (i) Eighty percent of the first test pressure that produces yield under section N5.0 of appendix N of ASME B31.8 (incorporated by reference, see § 195.3), reduced by the appropriate factors in §§ 195.106 (a) and (e); or
    (ii) If the pipe is 12 3/4 inch (324 mm) or less outside diameter and is not tested to yield under this paragraph, 200 p.s.i. (1379 kPa) gage.
  • (b) Converted under § 195.5 and—
    (1) Has an external coating that substantially meets § 195.559 before the pipeline is placed in service; or
  • (b) Each buried or submerged pipeline converted under § 195.5 must have cathodic protection if the pipeline—
    (1) Has cathodic protection that substantially meets § 195.571 before the pipeline is placed in service; or
  • (iv) A pipeline converted for service under § 195.5, or a change in commodity as reported on the annual report as required by § 195.49.

Citations to §195.5(a)