§192.555. Uprating to a pressure that will produce a hoop stress of 30 percent or more of SMYS in steel pipelines. — Inbound Citations

49 C.F.R. § 192.555

Cited by 5 regulations in release Current.

Citations to 49 C.F.R. § 192.555 as a whole

Citations to §192.555(b)(1)

Citations to §192.555(b)(2)

Citations to §192.555(b)(e)

Citations to §192.555(c)

  • (d) Except as provided in § 192.555(c), a new maximum allowable operating pressure established under this subpart may not exceed the maximum that would be allowed under §§ 192.619 and 192.621 for a new segment of pipeline constructed of the same materials in the same location. However, when uprating a steel pipeline, if any variable necessary to determine the design pressure under the design formula (§ 192.105) is unknown, the MAOP may be increased as provided in § 192.619(a)(1).