§192.329. Installation of plastic pipelines by trenchless excavation.
49 C.F.R. § 192.329
Plastic pipelines installed by trenchless excavation must comply with the following:
Each operator must take practicable steps to provide sufficient clearance for installation and maintenance activities from other underground utilities and/or structures at the time of installation.
For each pipeline section, plastic pipe and components that are pulled through the ground must use a weak link, as defined by § 192.3, to ensure the pipeline will not be damaged by any excessive forces during the pulling process.