§192.205. Records: Pipeline components. — Inbound Citations
49 C.F.R. § 192.205
Statutory Authority
Cited by 1 regulation in release Current.
Citations to 49 C.F.R. § 192.205 as a whole
-
(1) If a line is new, replaced, relocated, or otherwise changed, the design, installation, construction, initial inspection, and initial testing must be in accordance with requirements of this part applicable to transmission lines. Compliance with §§ 192.67, 192.127, 192.179(e) and (f), 192.205, 192.227(c), 192.285(e), 192.319(d) through (g), 192.506, 192.634, and 192.636 is not required;