US Codex
C.F.R.
Browse by date
Notes

§180.211. Repair, rebuilding and reheat treatment of DOT-4 series specification cylinders. — Inbound Citations

49 C.F.R. § 180.211

Cited by 3 regulations in release Current.

Citations to 49 U.S.C. § 180.211 as a whole

Citations to §180.211(d)

  • (2) A record of rebuilding, in accordance with § 180.211(d), must be completed for each cylinder rebuilt. The record must be clear, legible, and contain the following information:
    (i) Name and address of test facility, date of test report, and name of original manufacturer;
    (ii) Marks stamped on cylinder to include specification number, service pressure, serial number, symbol of manufacturer, inspector's mark, and other marks, if any;
    (iii) Cylinder outside diameter and length in inches;
    (iv) Rebuild process (welded, brazed, type seams, etc.);
    (v) Description of assembly and any attachments replaced (e.g., neckrings, footrings);
    (vi) Chemical analysis of material for the cylinder, including seat and Code No., type of analysis (ladle, check), chemical components (Carbon (C), Phosphorous (P), Sulfur (S), Silicon (Si), Manganese (Mn), Nickel (Ni), Chromium (Cr), Molybdenum (Mo), Copper (Cu), Aluminum (Al), Zinc (Zn)), material manufacturer, name of person performing the analysis, results of physical tests of material for cylinder (yield strength (psi), tensile strength (psi), elongation percentage (inches), reduction in area percentage, weld bend, tensile bend, name of inspector);
    (vii) Results of a test on a cylinder, including test method, test pressure, total expansion, permanent expansion, elastic expansion, percent permanent expansion (permanent expansion may not exceed ten percent (10 percent) of total expansion), and volumetric capacity (volumetric capacity of a rebuilt cylinder must be within ±3 percent of the calculated capacity);
    (viii) Each report must include the following certification statement: “I certify that this rebuilt cylinder is accurately represented by the data above and conforms to all of the requirements in Subchapter C of Chapter I of Title 49 of the Code of Federal Regulations.”. The certification must be signed by the rebuild technician and principal, officer, or partner of the rebuild facility.