US Codex
C.F.R.
Browse by date
Notes

§107.117. Emergency processing. — Inbound Citations

49 C.F.R. § 107.117

Cited by 5 regulations in release Current.

Citations to 49 U.S.C. § 107.117 as a whole

Citations to §107.117(a)

  • (e) Upon receipt of all information necessary to process the application, the receiving Department official transmits to the Associate Administrator, by the most rapidly available means of communication, an evaluation as to whether an emergency exists under § 107.117(a) and, if appropriate, recommendations as to the conditions to be included in the special permit. The Associate Administrator will review an application for emergency processing of a special permit in conformance with the standard operating procedures specified in appendix A of this part (“Standard Operating Procedures for Special Permits and Approvals”) to determine if it is complete and conforms with the requirements of this subpart. If the Associate Administrator determines that an emergency exists under § 107.117(a) and that, with reference to the criteria of § 107.113(f), granting of the application is in the public interest, the Associate Administrator will grant the application subject to such terms as necessary and immediately notify the applicant. If the Associate Administrator determines that an emergency does not exist or that granting of the application is not in the public interest, the applicant will be notified immediately.

Citations to §107.117(d)(4)

  • A leaking non-bulk package may not be forwarded until repaired, reconditioned, or overpacked in accordance with § 173.3 of this subchapter. Except as otherwise provided in this section, a bulk packaging that no longer conforms to this subchapter may not be forwarded by rail unless repaired or approved for movement by the Associate Administrator for Safety, Federal Railroad Administration, or for cross-border movements to or from Canada, moved in accordance with the TDG Regulations (see § 171.12) or a Temporary Certificate issued by the Competent Authority of Canada, as applicable. For FRA Approval, notification and approval must be in writing, or through telephonic or electronic means, with subsequent written confirmation provided within two weeks. For the applicable address and telephone number, see § 107.117(d)(4) of this chapter. A leaking bulk package containing a hazardous material may be moved without repair or approval only so far as necessary to reduce or to eliminate an immediate threat or harm to human health or to the environment when it is determined its movement would provide greater safety than allowing the package to remain in place. In the case of a liquid leak, measures must be taken to prevent the spread of liquid.

Citations to §107.117(e)

  • (a) An applicant for special permit, a special permit holder, or an applicant for party status to a special permit may request that the Associate Administrator reconsider a decision under § 107.113(g), § 107.117(e) or § 107.121(c) of this part. The request must—
    (1) Be in writing or by electronic means and filed within 20 days of receipt of the decision;
    (2) State in detail any alleged errors of fact and law;
    (3) Enclose any additional information needed to support the request to reconsider; and