48 C.F.R. § 715.370-2
(d)
Evaluation and selection.
(1)
Competition shall be sought among eligible Title XII institutions to the maximum practicable extent; this requirement shall be deemed satisfied when a contractor is selected under the procedures of this section.
(2)
The evaluation panel shall—
(i)
Prepare evaluation and selection criteria;
(ii)
Prepare an initial source list of eligible institutions considered qualified to perform the proposed project; and
(iii)
Evaluate the list, using the evaluation criteria previously determined, for the purpose of making a written determination of the sources considered most capable of performing the project.
(3)
The chairman of the evaluation panel will prepare a memorandum requesting the contracting officer to prepare a request for expressions of interest from qualified sources and setting forth:
(ii)
The evaluation criteria which have been determined; and
(iii)
The recommended source list and the rationale therefor.
(4)
The contracting officer will prepare a request for an expression of interest (REI), containing sufficient information to permit an offeror to determine its interest in the project, and to discuss the project with USAID representatives, if appropriate. The REI should include a concise statement of the purpose of the activity, any special conditions or qualifications considered important, a brief description of the selection procedure and evaluation criteria which will be used, the proposed contract format, and any other information considered appropriate. The REI will be issued to the sources recommended by the panel, and to others, as appropriate; it will be synopsized, as required by (
48 CFR) FAR 5.201, and it will normally allow a minimum of 60 days for preparation of an expression of interest. Guidelines for preparation of expressions of interest are contained in attachment 1 to (
48 CFR) AIDAR appendix F.
(5)
The contracting officer will transmit all expressions of interest to the evaluation panel for evaluation and selection recommendation. The panel may conduct on site evaluations at its discretion, as part of the evaluation process.
(6)
The chairman of the evaluation panel will prepare a written selection recommendation with supporting justification, recommending that negotiations be conducted with the prospective contractor(s) selected by the evaluation panel. The selection recommendation shall be transmitted to the contracting officer together with the complete official file on the project which was being maintained by the evaluation panel.
(7)
The contracting officer will review the selection recommendation, obtain necessary cost and other data, and proceed to negotiate with the recommended sources.
Notes, amendments, and revision history
Amendments
[52 FR 6159, Mar. 2, 1987, as amended at 54 FR 28069, July 5, 1989; 55 FR 6802, Feb. 27, 1990; 62 FR 40467, July 29, 1997; 62 FR 45334, Aug. 27, 1997; 62 FR 47532, Sept. 9, 1997. Redesignated at 64 FR 16648, Apr. 6, 1999, as amended at 79 FR 74988, 74993, Dec. 16, 2014]
Authority
Authority: Sec. 621, Pub. L. 87-195, 75 Stat. 445 (22 U.S.C. 2381) as amended; E.O. 12163, Sept. 29, 1979, 44 FR 56673; 3 CFR, 1979 Comp., p. 435.
Source
Source: 49 FR 13240, Apr. 3, 1984, unless otherwise noted.
Amendments
[52 FR 6159, Mar. 2, 1987, as amended at 54 FR 28069, July 5, 1989; 55 FR 6802, Feb. 27, 1990; 62 FR 40467, July 29, 1997; 62 FR 45334, Aug. 27, 1997; 62 FR 47532, Sept. 9, 1997. Redesignated at 64 FR 16648, Apr. 6, 1999, as amended at 79 FR 74988, 74993, Dec. 16, 2014]