§3405.202. Exceptions.
48 C.F.R. § 3405.202
FSA— Issuance of a synopsis is not required when the firm to be solicited has previously provided a module for the system under a contract that contained cost, schedule, and performance goals and the contractor met those goals.
Notes, amendments, and revision history
Authority
Authority: 5 U.S.C. 301 and 20 U.S.C. 1018a.
Source
Source: 88 FR 60542, Sept. 1, 2023, unless otherwise noted.