§3016.170. Contracts with Lead System Integrators.
48 C.F.R. § 3016.170
The contracting officer should negotiate the most appropriate contract type and fee structure based on risks inherent in the work to be performed, in accordance with (FAR) 48 CFR 16.103(a). Contract type and fee structure should be commensurate with the work to be performed and the risks assumed. Worthwhile existing guidance on contract type selection, pricing, and fee structures, such as exists in Vol. I, Ch. 4 of the Contract Reference Pricing Guides [http://www.acq.osd.mil/dpap/cpf/docs/contract_pricing_finance_guide/vol4_ch1.pdf] can be consulted to determine the appropriate contract type and fee structure for use in varied contracts with lead system integrators in the production, fielding and sustainment of complex systems.
Notes, amendments, and revision history
Source
Source: 75 FR 41100, July 15, 2010, unless otherwise noted.
Authority
Authority: 5 U.S.C. 301-302, 41 U.S.C. 1303, 41 U.S.C. 1707, 41 U.S.C. 1702, and 48 CFR subpart 1.3.
Source
Source: 68 FR 67871, Dec. 4, 2003, unless otherwise noted.