§2816.601. Time-and-materials contracts.
48 C.F.R. § 2816.601
The BPC, or designee at a level at or above the chief of the contracting office, is the agency official authorized to approve a determination and finding prescribed in FAR 16.601(d)(1)(ii).
Notes, amendments, and revision history
Authority
Authority: 28 U.S.C. 510; 40 U.S.C. 486(c); 28 CFR 0.75(j) and 28 CFR 0.76(j).
Source
Source: 87 FR 47118, Aug. 2, 2022, unless otherwise noted.